AttachmentVI.doc

DOC document 55 KB Posted

Attached to
Grand Rapids Aquatics Lab Renovation Federal contract opportunity
Solicitation number
AG-63PX-S-07-0006
Issued by
Department of Agriculture Forest Service Research Service Northern Research Station

About this file

Attachment VI Wage Rate Determination

View the file

Other files for this federal contract opportunity

Other files attached to Grand Rapids Aquatics Lab Renovation, newest first.
File Type Posted
SF-30IVAmendment.rtf RTF text file
Resilientflooring.doc DOC document
20070905115845.zip ZIP file
20070828104342.zip ZIP file
SF-30IIIAmendmentCorrections.rtf RTF text file
AmendmentAttachmentIISECTION15410.doc DOC document
AmendmentAttachmentI.doc DOC document
AmendmentAtachmentVII VIIIDrawings.pdf PDF
1_Questions AnswersatPre-bidMtg.doc DOC document
AmendmentCommericalFaucetSpec.pdf PDF
1_SF-30_AmendmentCover.rtf RTF text file
1_AmendmentAttachmentIISECTION15410.doc DOC document
20070827150102.zip ZIP file
1_AmendmentAtachmentVII VIIIDrawings.pdf PDF
SF-30_AmendmentCover.rtf RTF text file
1_AmendmentCommericalFaucetSpec.pdf PDF
1_AmendmentAttachmentI.doc DOC document
20070827151841.zip ZIP file
Questions AnswersatPre-bidMtg.doc DOC document
AttachmentVII.pdf PDF
AttachmentIV.doc DOC document
AttachmentI.doc DOC document
Solication.doc DOC document
AttachmentV.doc DOC document
20070819185151.zip ZIP file
AttachmentII.zip ZIP file
AttachmentIII.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-63PX-S-07-0006

Aquatics Lab Renovation Attachment VI

Grand Rapids Aquatics Lab: General Decision Number: MN070007 05/25/2007 MN7

Superseded General Decision Number: MN20030007

State: Minnesota Counties: Itasca Construction Type: Building

Modification Number: 0-3 Publication Date: 02/09/2007-05/25/2007

ASBE0049-002 06/01/2006

CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES:

Asbestos Workers/Insulator

Rates Fringes

(Includes the application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems)……....$ 31.86 12.35

ASBE0205-016 05/01/1998

CARLTON COOK, ITASCA, KOOCHICHING, LAKE, AND ST. LOUIS COUNTIES

Asbestos Removal

Rates Fringes worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulating materials from mechanical systems whether they contain asbestos or not)………..$ 19.72 3.69

BOIL0647-002 07/01/2006

Rates Fringes

BOILERMAKER.............................$ 29.89 16.43

BRMN0001-017 05/01/2006

ALL COUNTIES EXCEPT: CARLTON, COOK, LAKE & ST LOUIS (City of Duluth and South of Township Line 55)

Rates Fringes

Tile Layer...............................$ 29.02 14.74

BRMN0001-021 05/01/2006

Rates Fringes

Tile Finisher...........................$ 25.29 11.75

BRMN0016-001 05/01/2006

ITASCA COUNTY

Rates Fringes

Bricklayer.............................$ 28.57 14.90

CARP0361-008 05/01/2006

CARLTON, COOK, ITASCA, KOOCHICHING, LAKE, ST LOUIS COUNTIES

Rates Fringes

Lather..................................$ 25.17 12.31

CARP0596-001 06/01/2006

AREA 1: CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST LOUIS COUNTIES

AREA 2: REMAINING AREA

Soft Floor Layer Rates Fringes Area 1...................................$ 24.05 13.69

Area 2...................................$ 28.55 13.22

CARP0606-001 05/01/2006

ITASCA, KOOCHICHING, LAKE (Northern part, including Sawbill Landing) & ST. LOUIS (Excluding Duluth Area) COUNTIES

Carpenters:

Rates

Fringes Carpenter, Piledriverman........$ 23.90 11.54

CARP0606-007 05/01/2006

ITASCA, KOOCHICHING, LAKE (Northern half, excluding Two Harbors, Isabella & Finland), AND ST LOUIS (N.E. 2/3 including Cook, Cusson, Ely; and western strip including Chisholm, Orr and Greaney) COUNTIES

Carpenter (Site Preparation, Rates Fringes Excavation, and Incidental

Paving) Carpenter & Piledriverman...$ 28.43 11.54

CARP1348-001 05/01/2006

CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES:

Rates Fringes

Millwright............................$ 26.45 11.85

ELEC0242-002 06/01/2006

CARLTON, COOK, ITASCA (Southerly 12 Twps. including Harris, Feely, Blackberry, Spang, Coodland, Sago & Wawina), LAKE & ST. LOUIS (South part bounded on the north by the north line of Kelsey Township extended east & west) COUNTIES

Rates Fringes

Electrician.............................$ 29.00 56.9%

ELEC0294-002 06/01/2006

ITASCA (Excluding section South of a line extending East & West of the South line of Grand Rapids & Trout Lake Twps), KOOCHICHING (Western part bounded on the east by a line extending north and south from the easternmost point of the city limits of Grand Rapids)

Cable splicer........................$ 29.55 57.85%

Electricians:

Jobs under $3,244,800........$ 21.95 5.29+34.5%

ELEC0294-006 06/01/2006

KOOCHICHING (East of a line extending North and South from the easternmost point of City limits of Grand Rapids), & ST. LOUIS (North part bounded on the south by the south line of Ellsburg Township, extended east & west) COUNTIES

Rates Fringes

Electrician............................$ 29.00 57.85%

IRON0563-002 05/01/2005

CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES

Rates Fringes

Ironworker............................$ 26.24 15.27

LABO1091-003 05/01/2006

CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES

Rates Fringes

Laborer (Asbestos Abatement)$ 24.45 8.96

LABO1097-001 05/01/2006

ITASCA, KOOCHICHING & ST. LOUIS (North of T 55N) COUNTIES:

Rates Fringes

Laborers: .............................$ 22.22 9.56

Construction; Carpenter Tender, Concrete & Cement, Concrete Vibrator; Demolition & Wrecking, Pneumatic & Electric Tool, Jackhammer, Chipping Hammer, Tamper Operator.

PAIN0106-001 05/01/2006

CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES:

Rates Fringes

Glazier.................................$ 22.60 11.05+a

FOOTNOTE: 1 to 4 years service - 1 week paid vacation; 5 to 11 years - 2 weeks paid vacation; 11 years or more - 3 weeks paid vacation

PAIN0106-011 05/01/2006

CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES:

Painters:

New:

Brush; Roller........................$ 25.81 11.27

Taping..................................$ 26.41 11.27

Repaint:

Brush; Roller; & Lead

Base Paint Removal &

Abatement with Basic Hand

Tools such as Scrapers….....$ 24.31 11.27

Taping; Lead Base

Paint Removal/Abatement with Other Than Basic

Hand Tools.........................$ 24.91 11.27

PAIN1324-006 06/01/2005

ANOKA, CARVER, DAKOTA, HENNEPIN, ITASCA, KOOCHICHING, RAMSEY, SCOTT, SHERBURNE, & WASHINGTON COUNTIES

Rates Fringes

Glazier...................................$ 30.86 11.40

PLAS0633-024 05/01/2006

ITASCA & ST. LOUIS (North of White Face River) COUNTIES

Rates Fringes

Cement Mason.......................$ 23.55 11.50

PLAS0663-003 05/01/2006

CARLTON, COOK, ITASCA, LAKE AND ST. LOUIS COUNTIES

Rates Fringes

Plasterer..................................$ 26.94 12.42

PLUM0589-001 06/01/2006

COOK (Except a strip 20 miles inland along the shores of Lake Superior), ITASCA, KOOCHICHING, LAKE (Except a strip 20 miles inland along the shores of Lake Superior) & ST. LOUIS (North of an East-West line drawn through Cotton) COUNTIES Rates Fringes

Plumber/Pipefitter/Steamfitter...$ 31.55 13.27

SHEE0010-046 05/01/2006

ITASCA, KOOCHICHING & ST. LOUIS (Northern two-thirds) COUNTIES

Rates Fringes

Sheet metal worker................$ 28.03 14.44

TEAM1097-004 05/01/2006

ITASCA (West of T.H. 36), AND KOOCHICHING COUNTIES

Rates Fringes

Truck Driver..........................$ 22.22

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to beprevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .