1_AmendmentAttachmentIISECTION15410.doc

DOC document 31 KB Posted

Attached to
Grand Rapids Aquatics Lab Renovation Federal contract opportunity
Solicitation number
AG-63PX-S-07-0006
Issued by
Department of Agriculture Forest Service Research Service Northern Research Station

About this file

Attachment II - Section 15410 Plumbing

View the file

Other files for this federal contract opportunity

Other files attached to Grand Rapids Aquatics Lab Renovation, newest first.
File Type Posted
SF-30IVAmendment.rtf RTF text file
Resilientflooring.doc DOC document
20070905115845.zip ZIP file
20070828104342.zip ZIP file
SF-30IIIAmendmentCorrections.rtf RTF text file
AmendmentAttachmentIISECTION15410.doc DOC document
AmendmentAttachmentI.doc DOC document
AmendmentAtachmentVII VIIIDrawings.pdf PDF
1_Questions AnswersatPre-bidMtg.doc DOC document
AmendmentCommericalFaucetSpec.pdf PDF
1_SF-30_AmendmentCover.rtf RTF text file
20070827150102.zip ZIP file
1_AmendmentAtachmentVII VIIIDrawings.pdf PDF
1_AmendmentCommericalFaucetSpec.pdf PDF
1_AmendmentAttachmentI.doc DOC document
20070827151841.zip ZIP file
Questions AnswersatPre-bidMtg.doc DOC document
AttachmentVII.pdf PDF
SF-30_AmendmentCover.rtf RTF text file
AttachmentVI.doc DOC document
AttachmentIV.doc DOC document
AttachmentI.doc DOC document
Solication.doc DOC document
AttachmentV.doc DOC document
20070819185151.zip ZIP file
AttachmentII.zip ZIP file
AttachmentIII.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-63PX-S-07-0006

Aquatics Lab Renovation (Revised 8/27/2007) Attachment II

SECTION 15410

PLUMBING FIXTURES

PART 1 GENERAL

1.01 Section Includes A.

Sinks.

1.02 References A.

ASME A112.18.1 - Plumbing Fixture Fittings; The American Society of Mechanical Engineers; 2005.

1.03 Submittals A.

See Section 01330 - Submittals, for submittal procedures.

B.

Product Data: Provide catalog illustrations of fixtures, sizes, rough-in dimensions, utility sizes, trim, and finishes.

C.

Manufacturer's Instructions: Indicate installation methods and procedures.

D.

Maintenance Data: Include fixture trim exploded view and replacement parts lists.

E.

Warranty: Submit manufacturer warranty and ensure forms have been completed in Owner's name and registered with manufacturer.

1.04 Quality Assurance A.

Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this section, with minimum three years of documented experience.

1.05 Delivery, Storage and Protection A.

Accept fixtures on site in factory packaging. Inspect for damage.

B.

Protect installed fixtures from damage by securing areas and by leaving factory packaging in place to protect fixtures and prevent use.

PART 2 PRODUCTS

2.01 Sinks A. Manufacturers:

Elkay: www.elkay.com. Model SS8260LR

Substitutions: Not permitted.

B.

Double Compartment Bowl:

1.

ASME A112.19.3; 30 x 24 x 14 inch outside dimensions, each bowl with right and left drain boards; 14 gage thick, Type 304 stainless steel, self rimming and undercoated, with ledge back drilled for two faucets.

a.

Drain: 3-1/2 inch crumb cup and tailpiece.

C.

Trim: ASME A112.18.1; chrome plated brass supply with swing gooseneck spout, Elkay Model: LK940AT12T4S (see attached specification sheet) water economy aerator with maximum 2.2 gpm flow, indexed lever handles.

D.

Accessories: Chrome plated 17 gage brass sediment trap with clean-out plug and arm with escutcheon, wheel handle stop, flexible supplies.

PART 3 EXECUTION

3.01 Examination A.

Verify that walls and floor finishes are prepared and ready for installation of fixtures.

B.

Confirm that millwork is constructed with adequate provision for the installation of sinks.

3.02 Preparation A.

Rough-in fixture piping connections in accordance with minimum sizes indicated in fixture rough-in schedule for particular fixtures.

3.03 Installation A.

Install each fixture with trap, easily removable for servicing and cleaning. Scullery sink shall be equipped with sediment trap.

B.

Provide chrome plated rigid or flexible supplies to fixtures with stops, reducers, and escutcheons.

C.

Install components level and plumb.

D.

Install and secure fixtures in place with wall supports or wall carriers and bolts.

E.

Seal fixtures to wall and floor surfaces with sealant, color to match fixture.

3.04 Interface with work of other sections

A.

Review millwork shop drawings. Confirm location and size of fixtures and openings before rough-in and installation.

3.05 Adjusting A.

Adjust stops or valves for intended water flow rate to fixtures without splashing, noise, or overflow.

3.06 Cleaning and Protection A.

Clean plumbing fixtures and equipment.

B.

Do not permit use of fixtures.

END OF SECTION

File details come from the government source that posted it. Updated .