Questions AnswersRevised.docx
DOCX document 13 KB Posted
- Attached to
- Portable Foam Depopulation Units Federal contract opportunity
- Solicitation number
- AG-6395-S-16-0101
About this file
Updated questions and answers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Depopulation_Unit_SOW.docx | DOCX document | |
| Questions Answers.docx | DOCX document | |
| Depopulation_Unit_SOW.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q: If we use an enclosed type trailer system for cold weather concerns, instead of a “metal floor with punch set holes for draining”; can we use a complete chemical resistant interior to keep heat in, but still be easily cleaned?
A: If the surface can be sealed for decontamination it would be considered.
Q: Is the overall size of the trailer firm?
A: The trailer length may be changed as long as the trailer is still functional and manageable.
Q: As length has been changed, may we make this “total overall size” as the width may very as well.
A: Yes, as long as the trailer is still functional and manageable.
Q: What was changed in the SOW on 5/6/2016?
A1: The last sentence for the Fire Pump listed a block heating source for cold weather operations, it has been modified to include other methods as long as it maintains above freezing temperatures.
A2: The nozzle section was found to be redundant of need as it is covered in the decontamination section and the last sentence removed due to this fact.
A3: Other supplies and services for each unit packaging the phrase was added “or replacement mechanical seals”.