Q&A#1

AG‐6395‐S‐12‐0134

9/7/12

Q1. The 6 inch PVC vents for each unit, per the proposal were to be cut and capped below the roof. Is this correct?

A1. Cap the 6” PVC pipes at the underside of the roof.

Q2. There are three blowers located on the roof, and bolted thru the roof, we were not able to get on the roof to see these units, and they are not listed in the scope, are these units to be removed from the roof?

A2. No, equipment located on the roof is not within the scope of this contract.

Q3. What is the weight of the units?

A3. We estimate each chamber weighs between 7,000 and 8,000 pounds.

Q4. Is it ok to contact the manufacturer of these units?

A4. Yes

Q5. Are the units, and all associated blowers, pumps, controls, etc. to be scrapped only or can they be resold for reuse?

A5. The contract is for removal and disposal, any scrap value to be obtained should be considered within the competitive quote.