- Trenton Wetland Reserve Program (WRP) Wetland Restoration Project, Trenton Township, Dodge County, WI
- Solicitation number
- AG-5F48-S-13-0006
About this file
Attachment 5 - Construction Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Results_for_Posting_6-10-13.xlsx | XLSX spreadsheet | |
| Signed_Amendment_1.pdf | ||
| Solicitation _Offer _and_Award-Standard_Form_1442 _Section_A.pdf | ||
| Att_3_WI15_dvb.mht | MHT file | |
| Att_6_SAM_Guide.doc | DOC document | |
| Solicitation_Sections_B_through_M.docx | DOCX document | |
| Att_4_WRP_SPECS_TRENTON2013.pdf | ||
| Att_2_Trenton_WRP_location_map2.jpg | JPG image | |
| Att_1_Trenton_WRP_location_map.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUANTITY
0.4
4,5
4,12
50. ORGANIC FILL FOR
4,13 DITCH FILLS OR FILLING
2. EXCAVATION
4,8
4,9
4,10
LN FT
ACRE
4,11
4,13
4,5
CY
CY
CY
TILE BREAK
FILL
DITCH PLUG 1
DITCH PLUG 2
SPOIL PLACEMENT
LN FT
(DISTURBED AREAS)
CY
CY
CY
CY
SCRAPE 5
CY
SCRAPE 4
TILE SEARCH
SEEDING
7. MOBLILIZATION & DEMOB.
1. CLEARING
5. CONSTR. SITE POLLUTION
CONTROL
4, 14-15
PER JOB
ACRE
LN FT
BRUSH & TREE CLEARING
SILT FENCE
ESTIMATED QUANTITIES
ITEM UNIT
SHEET
NUMBER
WI CONSTRUCTION SPEC. OR
JOB SHEET NUMBER
MOBILIZATION
EXCAVATION
SCRAPE 1
SCRAPE 2
SCRAPE 3
EXISTING GROUND
FINISH GRADE
EXSITNG GROUND ‐ 40' FROM CL
LEGEND
SCRAPE BOUNDARY
SCRAPE BOUNDARY
APPROX. EASEMENT BOUNDARY
U.S. DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION SERVICE
Disturbed Area Seeding Estimated Total Acres = 16
Location Areas disturbed during construction shall be seeded. Areas shall be finish graded prior to seeding.
See disturbed area planview on page 4.
Site Preparation Areas should be finish graded prior to seeding. Ensure a smooth seedbed and to facilitate future mowing. It may necessary to go over areas with a drag or cultipacker prior to seeding.
Seed Mix Required Oz Per Total Oz Total Lbs
Scientific Name Common Name Acre Required Required Agrostis gigantea Redtop 24 391.2 24.45 Trifolium pratense Red Clover 96 1564.8 97.8 Elymus virginicus Virginia Wild Rye 96 1564.8 97.8 Poa palustris Swamp bluegrass 48 782.4 48.9
Seed shall be free of non-seed debris and free of noxious weeds. Seed quantitites and quality must be verified by NRCS before seeds are sown.
Seeding Dates Seeding shall occur immediately after construction and within the following windows
Spring: April 1st through May 15th Fall: August 7th through August 29th Dormant: After hard frost; do not seed if snow cover exceeds 3 inches
If construction is completed outside of these stated seeding windows, but prior to October 1st, temporary cover seeded immediately after construction. Temporary cover to be seeded is:
Oz Per Total Oz Total Lbs Scientific Name Common Name Acre Required Required
Lolium multiflorum Annual Rye 64 1043.2 65.2
If temporary seeding occurs, permanent seed may be broadcast over this residue at next permanent window
Seeding:
Sowing shall be accomplished by broadcast method. Hydroseeding is not an acceptable method of broadcasting.
Air-seeding is an acceptable method of broadcasting seed. For traditional broadcasting, a ratio of 1-part moist sand or sawdust to 1-part seed mix by by volume may be used. Other broadcast mediums shall be approved by NRCS prior to application. If no broadcast medium is used, proper calibration shall be verified by NRCS prior to commencement.
If air-seeded, broadcast medium shall NOT contain nitrogenous fertilizer