specifications.pdf
PDF 365 KB Posted
- Attached to
- Dane County Parks Wetland Restoration Program (WRP) Construction Project, Dane County, Wisconsin
- Solicitation number
- AG-5F48-S-11-0002
About this file
Project Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FBO-Bid Results.xlsx | XLSX spreadsheet | |
| Site Visit Questions Answers.docx | DOCX document | |
| Site Visit Participants.docx | DOCX document | |
| UPDATED DISTURBED AREA Seeding.pdf | ||
| SF-30 Amendment 1.pdf | ||
| WI19_dvb.htm | HTM file | |
| drawings.pdf | ||
| price schedule.xlsx | XLSX spreadsheet | |
| Solicitation Sections C through M.docx | DOCX document | |
| Solicitation Offer and Award-Standard Form 1442 Section A post.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DANE COUNTY PARKS
WETLAND RESTORATION
AG-5F48-S-11-0001
APPLICABLE WISCONSIN CONSTRUCTION SPECIFICATIONS
WCS 2. Excavation
WCS 3. Earthfill
WCS 5. Construction Site Pollution Control
WCS 7. Mobilization and Demobilization
WCS 9. Rock Riprap
WCS 13. Geotextiles
2-1 USDA-NRCS-Wisconsin Section IV, Technical Guide 7/08
WISCONSIN CONSTRUCTION SPECIFICATION
2. EXCAVATION
1. SCOPE
The work shall consist of the excavation of all materials necessary for the construction of the work.
2. USE OF EXCAVATED MATERIALS
To the extent that they are needed, all suitable materials removed from the specified excavations shall be used in the construction of the required earthfill. The suitability of materials for specific purposes will be determined by the Technician. The Contractor shall not waste or otherwise dispose of suitable excavated materials.
3. DISPOSAL OF WASTE MATERIALS
All surplus or unsuitable excavated materials will be designated as waste and shall be disposed of at the locations shown on the drawings or as approved by the Technician.
Waste materials shall not be placed in wetlands.
Material placed in designated waste disposal areas shall be left in a neat and sightly condition and sloped to provide positive drainage. Compaction of the waste materials will not be required unless specified by the construction plans.
Waste material excavated from channels may be deposited in leveled spoilbanks or areas adjacent to the channel work (if permissible). The shape and slopes of the spoilbanks shall be indicated on the drawings or as approved by the Technician. Spoil piles shall be located a minimum of 12 feet from the top of the channel side slope.
Spoil piles or disposal areas shall be protected to minimize site erosion and the production of sediment. Protective measures may include but are not limited to diversions, seeding, mulching, sediment basins, and silt fences.
4. SPECIAL REQUIREMENTS FOR STRUCTURE AND TRENCH EXCAVATION
The required dimensions and side slopes of all structure and trench excavations shall be as shown on the drawings.
Excavation beyond the limits of the specified lines and grades shall be corrected by filling the resulting voids with approved compacted materials.
Excavation for the installation of pipes shall follow the practices contained in the Occupational Safety and Health Administration (OSHA) Subpart P, Excavation, of 29 CFR 1926.650, .651 and .652.
Side slopes shall be excavated or braced to safeguard the work and workers. When bracing or supporting is required, the width of the excavation shall be adjusted to allow for the space
USDA-NRCS-Wisconsin 2-2
7/08 occupied by the sheeting, bracing, or other supporting installations. The Contractor shall furnish, place, and subsequently remove such supporting installations.
5. REMOVAL OF WATER
The Contractor shall construct and maintain all necessary cofferdams, channels, flumes, pumping equipment, and/or other temporary diversion and protective work for dewatering the various parts of the work. Foundations, cutoff trenches, and other parts of the work shall be maintained free from water as required for constructing each part of the work. After having served their purpose, all cofferdams and other temporary protective works shall be removed, or leveled to give a sightly appearance and so as not to interfere in any way with the operation, usefulness, or stability of the permanent structure.
6. BORROW EXCAVATION
When the quantities of suitable materials obtained from specified excavations are insufficient to construct the specified fill portions of the permanent works, additional materials shall be obtained from the designated borrow areas.
When shown on the drawings, sediment basins, terraces, diversions, or other measures shall be constructed to protect the borrow areas from erosion and retain sediment within the borrow area.
The upper six (6) inches shall be stripped from all borrow areas. This stripping shall be performed immediately prior to use of the borrow material to reduce the time the area is exposed to erosion. For large borrow areas, only a portion of the area should be stripped at a time. This material shall be redistributed over the area from which it came after borrow excavation is completed.
The extent of excavation and the selection of materials from the borrow area shall be as directed by the Technician. On completion of excavation, all borrow pits shall be left in a neat and sightly condition. All borrow areas shall be graded to blend with existing topography and sloped to prevent ponding and provide positive drainage.
WISCONSIN CONSTRUCTION SPECIFICATION
3. EARTHFILL
1. SCOPE
The work shall consist of placing the earthfill required by the drawings. This specification does not apply to the earthfill required for waste storage facilities.
2. MATERIALS
All fill materials shall be obtained from required excavations and designated borrow areas.
The selection, blending, routing, and disposition of materials in the various fills shall be subject to approval by Technician.
Fill materials shall contain no sod, brush, roots, frozen soil, or other perishable materials.
Stones larger than two-thirds of the uncompacted layer thickness shall be removed from the materials prior to compaction of the fill.
3. FOUNDATION PREPARATION
The foundation area shall be cleared of trees, stumps, roots, brush, rubbish, and stones having a maximum dimension greater than six (6) inches. Foundations shall be stripped to remove vegetation and other unsuitable materials or to the depth shown on the drawings, whichever is greater. Topsoil shall be stripped from the foundation area and stockpiled for use as a top dressing for vegetation establishment unless otherwise shown on the drawings.
Earth foundations shall be graded to remove surface irregularities and slopes steeper than 1:1.
The foundation surfaces shall be scarified parallel to the centerline of the fill to a minimum depth of 2 inches. The moisture content of the scarified materials shall be maintained as specified for the earthfill. The surface materials of the foundation shall be compacted and bonded with the first layer of earthfill as specified for subsequent layers of earthfill.
4. PLACEMENT
Fill shall not be placed until the required excavation and preparation of the underlying foundation is completed and inspected and approved by the Technician. No fill shall be placed upon a frozen surface nor shall snow, ice, or frozen material be incorporated in the fill.
Fill shall be placed in approximately horizontal layers beginning at the lowest elevation of the foundation. The thickness of each layer of fill prior to compaction shall be as specified in Table 1. Materials placed by dumping in piles or windrows shall be spread uniformly to not more than the specified layer thickness prior to compaction.
Adjacent to structures, earthfill shall be placed in 4-inch lifts (prior to compaction) in a manner adequate to prevent damage to the structure and to allow the structure to gradually and uniformly assume the backfill loads.
3-1 USDA-NRCS-Wisconsin
6/05
The height of the fill shall be increased at approximately the same rate on all sides of the structure.
Placement of fill adjacent to concrete structures may begin after the concrete has cured for the minimum time specified.
Earthfill in dams, levees, and other structures designed to impound water shall be placed to meet the following additional requirements:
a. The distribution of materials throughout each zone shall be essentially uniform, and the fill shall be free from lenses, pockets, streaks, or layers of material differing substantially in texture, moisture content, or gradation from the surrounding material.
b. The embankment top shall be maintained approximately level during construction except for sectional construction as described in Section 7.
c. Dam embankments shall be constructed in continuous layers from abutment to abutment, except where openings to facilitate construction or to allow passage of stream flow during construction are specified.
d. If the surface of any layer becomes too hard and smooth to achieve a suitable bond with the succeeding layer, it shall be scarified parallel to the axis of the fill to a depth of not less than 2 inches before the next layer is placed.
5. CONTROL OF MOISTURE CONTENT
Fill materials shall have a moisture content sufficient to insure the required compaction.
When kneaded in the hand, the soil will form a ball which does not readily separate and will not extrude out of the hand when squeezed tightly. The adequacy of the moisture content will be determined by the Technician.
Fill material or the top surface of the preceding layer of compacted fill that becomes too dry to permit suitable bond shall either be removed or scarified and wetted by sprinkling to an acceptable moisture content prior to placement of the next layer of fill.
Fill material that is too wet when deposited or the top surface of the preceding layer of compacted fill that becomes too wet shall be either removed or allowed to dry to an acceptable moisture content before compaction or placing additional layers of fill.
6. COMPACTION
The Contractor shall furnish and operate the types and kinds of equipment necessary to compact the fill materials.
Unless otherwise specified on the plans or approved by the Technician, compaction requirements for each layer of fill material are as shown in Table 1.
Each pass shall consist of at least one complete coverage by the wheel, track, or roller over the entire surface of the fill layer in a direction parallel to the main axis of the fill.
USDA-NRCS-Wisconsin 3-2 Section IV, Technical Guide 6/05
Adjacent to structures or in confined areas, compaction of the fill shall be accomplished by means of manually directed power tampers or plate vibrators or hand tamping, unless otherwise specified. The Technician shall determine if adequate compaction is being achieved. Heavy equipment shall not be operated within 2 feet of any structure.
Compaction by means of drop weights operating from a crane or hoist of any type will not be permitted.
7. SPECIAL REQUIREMENTS FOR SECTIONAL CONSTRUCTION OF EMBANKMENTS
When sectional (or phase) construction of embankments is authorized, the work shall be accomplished in the following manner:
Each section of the embankment that is constructed in the first phase shall be so placed that a slope not steeper than 3 feet horizontal to 1 foot vertical is maintained at the end of the embankment section adjacent to the gap in construction or closure section.
Prior to placement of the closure sections, the surfaces of completed fills and excavations that will be in contact with the closure shall be stripped of all loose material, scarified, moistened, and recompacted as necessary.
3-3 USDA-NRCS-Wisconsin
6/05
USDA-NRCS-Wisconsin 3-4
6/05
Table 1 - Equipment Compaction Requirements
Equipment Type Applicable Soils1 Maximum
Fill Height2
(feet)
Layer Thickness3
(inches)
Minimum Passes4
Sheepsfoot roller (10,000 lb. min. operating weight)
ML, MH, CL, CH
or
SM, SC, GM, GC
with >20% fines
None 9 1
Vibratory tamping roller (9,000 lb. min. operating weight)
SM, SC, GM, GC None 9 2
Rubber-tired scraper (fully loaded)
GM, GC, SM, SC,
ML, MH, CL, CH 20 9 1
Rubber-tired front end loader (fully loaded)
GM, GC, SM, SC,
ML, MH, CL, CH 20 6 1
Track-type crawler (standard tracks)
GM, GC, SM, SC,
ML, CL 10** 6 2
30,000 lb. min. SP, SW, GP, GW 6** 12 4
CL, ML, SC, SM 15## 3 2
less than 30,000 lb.
GM, GC, GP, GW,
SM, SC, SP, SW,
ML, CL
6** 6 2
Farm tractor (2,400 lb. min.)
GM, GC, SM, SC,
ML, MH, CL, CH 15 6 2
Steel drum vibratory roller (10,000 lb. min.) SP, SW, GP, GW None** 12 2
1 Unified Soil Classification System.
2 Measured from the top of the fill to the lowest point along the centerline of the fill.
3 Prior to Compaction.
4 The Technician shall determine if adequate compaction is being achieved. Additional passes may be required.
** The fill shall not have a permanent body of water stored against it.
## This method may only be used for embankments that will not have the potential for a permanent body of water stored against it that is greater than 1/4 acre in surface area or more than 6 feet deep.
USDA-NRCS-Wisconsin
5-1 3/06
5. CONSTRUCTION SITE POLLUTION CONTROL
1. SCOPE
The work shall consist of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
2. MEASURES
Erosion and sediment control measures and works shall be installed to prevent or minimize sediment production and transport offsite. The measures and works shall include, but are not limited to, the following:
a. Diversions - Divert water from work areas and collect water from work areas for treatment and safe disposition. Temporary diversions shall be removed and the area restored to its near original condition when the diversions are no longer required or when permanent measures are installed.
b. In-Channel Sediment Control - Sediment produced within the stream channel during construction will be retained in the work area. Sediment retention will be accomplished by using a temporary, excavated sediment trap and/or a barrier constructed of geotextile and hay bales. Turbid water in the retention area may be pumped to a well-vegetated area away from the stream. The vegetation will serve to filter the sediments before the flow returns to the stream. Discharge areas from all pump hoses shall be stabilized. At no time shall the pump discharge be allowed to cause erosion at the discharge point.
c. Mulching - Mulch provides temporary protection of the soil surface from erosion. The method of application is specified on the construction drawings
d. Sediment Basins - Sediment basins collect, settle, and eliminate sediment from eroding areas from impacting properties and streams below the construction site(s). These basins are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
e. Sediment Filters - Straw bale filters or geotextile sediment fences (silt fence) trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under or around them. These filters are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed. The method is shown on the construction drawings.
f. Seeding - Seeding to protect disturbed areas shall occur as soon as reasonably possible following completion of that earthwork activity. All seeding operations shall be performed in such a manner that the seeds are applied in the specified quantities
3/06 5-2 uniformly in the designated areas. The method and rate of seed application are specified on the construction drawings
g. Silt Curtain or Turbidity Barrier - Silt Curtain and Turbidity Barriers can be used to minimize the transport of sediment from an area where construction activities are occurring within or directly adjacent to a waterway or waterbody. The fabric shall be removed after the construction activities have ceased and the sediment has settled.
Care should be taken to prevent the re-suspension of sediment during removal.
h. Staging of Earthwork Activities - The excavation and moving of soil materials shall be staged to minimize the area disturbed and the time these locations are vulnerable to erosion.
i. Stockpiling Material - The stockpiled materials shall be protected from concentrated flows and/or flooding, to minimize sediment movement offsite.
j. Stream Crossings - Culverts or bridges should be used where equipment crosses streams. They are temporary and shall be removed and the area restored to its near original condition when the crossings are no longer required or when permanent measures are installed.
k. Waterways - Waterways shall be used to safely dispose of runoff from fields, diversions, and other structures or measures. These works are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
l. It is the responsibility of the contractor or their designee for the cleanup or removal of sediment transported offsite due to failure to maintain erosion control measures during all phases of the construction.
3. CHEMICAL POLLUTION
The contractor shall safely dispose of chemical pollutants (such as drained lubricating or transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a byproduct of the construction activities) off site. The contractor is responsible for reporting and clean up of all accidental spills and leaks.
In the event a piece of equipment develops a leak during the construction work, the leak shall be repaired before work continues. All excess fluids will be cleaned from the machine prior to its return to the work area.
If a leak occurs when equipment is working in or near a waterbody, the machine shall be immediately moved a safe distance away from the waterbody.
4. AIR POLLUTION
The burning of brush or slash and the disposal of other materials shall adhere to state and local regulations.
5-3 3/06
Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained.
All public access or haul roads used by the contractor during construction of the project shall be treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the technician before the first application.
5. MAINTENANCE, REMOVAL, AND RESTORATION
All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed and the site restored to near original condition.
All equipment used within the construction site shall be well maintained. All equipment lines and fittings shall be checked on a daily basis to ensure that they are in good working order.
7-1 5/08
WISCONSIN CONSTRUCTION SPECIFICATION
7. MOBILIZATION AND DEMOBILIZATION
1. SCOPE
The work consists of the mobilization and demobilization of the Contractor's forces and equipment necessary for performing the work required.
2. EQUIPMENT AND MATERIAL
Mobilization shall include:
• All activities and associated costs for transportation of the Contractor's personnel, equipment, and operating supplies to the site;
• Establishment of offices, buildings, and other necessary general facilities for the Contractor's operations at the site
• Premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable
• Construction and maintenance of haul roads and equipment parking areas
• Other job related items
Demobilization shall include:
• All activities and costs for transportation of personnel, equipment, and supplies not utilized in the project from the site
• Disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site.
• Repair of access roads, temporary haul roads, and equipment parking areas leaving the project site in the same or better condition than at the start of the project.
• General cleanup and house keeping needed to restore a neat and orderly project site.
Access to the site, equipment parking, and staging areas are limited to that shown on the drawings or as approved by the technician.
9-1 7/08
9. ROCK RIPRAP
1. SCOPE
The work shall consist of testing, furnishing, transporting, and placing rock riprap, including filter, bedding or geotextile materials where specified, in the construction of loose rock riprap revetments, blankets, rock toes, crossings, rock chutes, channel linings and other similar structures.
2. QUALITY OF MATERIALS
The rock shall be obtained from specified sources or sources as approved by the Technician. Rock sources used for streambank protection, lined waterways, rock chutes, or other similar major projects (Job Class II and above) shall be tested prior to use. A test is required a minimum of every five (5) years. The Technician may require a more current test.
Rock riprap from igneous or metamorphic origins such as granite, basalt, and quartzite may be used without testing. Dolomite from quarries within the map legend units shown in Figure 1 may also be used without testing:
• Dolomite (Sd) - all counties.
• Sinnipee Group (Os) and Prairie du Chien (Opc) - Marinette, Oconto, Shawano, Brown, Outagamie, Calumet, Winnebago, Green Lake, and Fond du Lac.
The Technician shall inspect and approve sources of these rock types prior to use and determine if testing is required.
Rock for equipment or cattle channel crossings, access roads, heavy use area protection or similar minor structures need not be tested.
Individual rock fragments shall be dense, sound and free from cracks, seams and other defects conducive to accelerated weathering. The rock fragments shall be angular to subrounded in shape. The least dimension of each individual rock fragment shall be not less than one-third the greatest dimension of the fragment. It should also be free from dirt, clay, sand, rock fines and other materials not meeting the gradation limits. Rock shall be excavated, selected and handled as necessary to meet the grading requirements stated in the construction plans.
Representative samples of rock requiring testing shall conform to the following requirements:
Bulk Specific Gravity (saturated surface-dry basis). Not less than 2.50 when tested in accordance with ASTM Specification C 127 on samples prepared as described for soundness testing.
Absorption. Not more than four (4.0) percent when tested in accordance with ASTM Specification C 127 on samples prepared as described for soundness testing.
Soundness. The weight loss in five cycles shall not be more than 28 percent when tested by the sodium sulfate soundness test method. Losses in excess of 20 percent are acceptable only when the design D50 rock size has been increased by 10 percent for a loss of 20-23.9 percent or 20 percent for a loss of 24-28 percent.
7/08 9-2
3. METHODS OF TESTING
Bulk Specific Gravity and Absorption shall be determined by ASTM Method C 127 on samples prepared as described for rock cube soundness testing.
Rock Cube Soundness. Soundness testing shall be performed by ASTM Method C 88 for coarse aggregate modified as follows:
The sodium sulfate soundness test shall be performed on a test sample of 5000 ± 300 grams of rock fragments, reasonably uniform in size and cubical in shape and weighing, after sampling, approximately 100 grams each. The test sample shall be obtained from rock samples that are representative of the total rock mass, as noted in ASTM Specification D 4992, and that have been sawed into slabs as described in ASTM Specification D 5121.
The samples shall be further reduced in size by sawing the slabs into cubic blocks. The thickness of the slabs and the size of the sawed blocks shall be determined by the size of the available test apparatus and as necessary to provide, after sawing, the approximate 100 gram samples.
Due to internal defects, some of the cubes may break during the sawing process or during the initial soaking period. Cubes that break during this preparatory process shall not be tested. Such breakage, including an approximation of the percentage of cubes that break, shall be noted in the test report.
After the sample has been dried, following completion of the final test cycle and washing to remove the sodium sulfate, the loss of weight shall be determined by subtracting from the original weight of the sample the final weight of all fragments which have not broken into three or more fragments. The test report shall show the percentage loss of the weight.
4. GRADATION
The gradation of the rock riprap and filter or bedding material shall be as shown in the construction plans.
Rock used for streambank protection, lined waterways, rock chutes, or other similar major projects (Job Class II and above) shall have a gradation verification be done by one of the following methods.
Method A
Measurement of a random truck load of stone (reference sample) according to the procedure outlined in EFH-17, Procedure for Determining Rock Weights, Sizes, and Gradations; or ASTM D5519, Standard Test Methods for Particle Size Analysis of Natural and Man-Made Riprap Materials (Test Method A).
Method B
Creation of reference samples of rock of at least 0.5 tons, made according to the procedure outlined in EFH-17 (Tables 1 - 5), creating the envelope limits of the gradation specified.
Control of project gradation will be by visual inspection comparing rock delivered to the reference samples.
The reference sample(s) may be used as part of the finished riprap or remain at the quarry.
9-3 7/08
Any difference of opinion between the Technician and the Contractor shall be resolved by dumping and checking (by measurement) the gradation of a random truck load of stone by Method A. Mechanical equipment, a sorting site, and labor needed to assist in checking gradation shall be provided by the Contractor at no additional cost.
5. SUBGRADE PREPARATION
The subgrade surfaces on which the riprap, filter or bedding material is to be placed shall be cut or filled and graded to the lines and grades as shown on the drawings or as directed by the Technician. When fill to subgrade lines is required, it shall consist of approved materials and shall be compacted as specified in Wisconsin Construction Specification 3, Earthfill.
Riprap, filter, bedding or geotextile shall not be placed until the foundation preparation is completed, and approved by the Technician.
6. FILTER AND BEDDING
Filter or bedding material, when required, shall be spread uniformly on the prepared subgrade surfaces to the depth shown on the drawings. The surfaces of the layers shall be finished reasonably free of mounds, dips or windrows and shall meet the gradation shown on the plans or as specified in Wisconsin Construction Specification 8.
Geotextile, when required, shall meet the requirements shown on the drawings and as specified in Wisconsin Construction Specification 13, Geotextiles.
7. PLACING ROCK RIPRAP
The rock riprap shall be placed by equipment on the surfaces and to the depths specified.
The rock riprap shall be installed to the full course thickness in one operation and in such a manner as to avoid displacement of underlying materials. The rock for riprap shall be delivered and placed in a manner that will ensure that the riprap in-place shall be reasonably homogeneous with the larger rocks uniformly distributed and firmly in contact one to another with the smaller rocks and spalls filling the voids between the larger rocks. Some hand placing may be required to provide a neat and uniform surface or to prevent damage to structures.
8. VEGETATED ROCK RIPRAP
If the rock riprap is to be vegetated, topsoil shall be placed by equipment in the riprap voids (surface) and on the surface of the rock to the depth specified. The topsoil placement shall not take place before the placement of the rock riprap is approved by the Technician.
Topsoil shall be placed in such a manner as to avoid displacement of the underlying rock.
The topsoil may extend from the top of the riprap down to the bankfull elevation (OHWM) or as shown on the drawings. Care shall be taken so topsoil is retained on the rock and is not allowed into the water body. The area shall be seeded and mulched within 12 hours following topsoil placement.
7/08 9-4
Fi gu re
13-1 5/10
WISCONSIN CONSTRUCTION SPECIFICATION
13. GEOTEXTILES
1.
This work shall consist of furnishing all materials, equipment, and labor necessary for the installation of geotextiles.
SCOPE
2.
The class and type of geotextile shall be as shown on the drawings.
MATERIALS
Geotextiles shall be manufactured from synthetic long chain or continuous polymeric filaments or yarns composed of at least 95 percent by weight of polypropylene, polyethylene, polyester, polyamide, or polyvinylidene-chloride. Fibers shall contain stabilizers and/or inhibitors to enhance its resistance to ultraviolet light. The geotextile shall be formed into a stable network of filaments or yarns that retain dimensional stability relative to each other, including selvages. The geotextile shall be free of any chemical treatment or coating that might significantly reduce its permeability and shall have no flaws or defects that significantly alter its physical properties.
Thread used for factory or field sewing shall be of a contrasting color to the fabric and made of polypropylene, polyester, or polyamide thread. The sewing thread shall have a minimum breaking strength of 28 pounds when tested in accordance to ASTM D 2256. The thread shall be as resistant to ultraviolet light as the geotextile being sewn.
Additional requirements for geotextile materials are as follows:
a.
Slit tape geotextile shall conform to the physical properties listed in Table 1. The slit tape geotextile shall be manufactured from a filament that is woven. The edges of the material shall be selvaged or otherwise finished to prevent the outer filament from unraveling.
Slit Tape Geotextile b.
Woven geotextile shall conform to the physical properties listed in TABLE 1. The woven geotextile shall be manufactured from monofilament yarn that is woven into a uniform pattern with distinct and measurable openings. The fabric shall be manufactured so that the yarns will retain their relative position with regard to each other. The edges of the material shall be selvaged or otherwise finished to prevent the outer yarn from unraveling.
Woven Geotextile c.
Nonwoven geotextile shall conform to the physical properties listed in TABLE 2. Nonwoven geotextile shall be manufactured from randomly oriented fibers that have been bonded together by needle-punching.
Nonwoven Geotextile
5/10 13-2
3.
Geotextiles labeling, shipment, and storage shall follow ASTM D 4873. Product labels shall clearly show the manufacturer or supplier name, style name, and roll number. Each geotextile roll shall be wrapped with a material that will protect the geotextile, including the ends of the roll, from damage due to shipment, water, sunlight, and contaminants. The protective wrapping shall be maintained during periods of shipment and storage.
SHIPPING AND STORAGE
Prior to use, the geotextile shall be inspected and approved by the Technician, then stored in a clean, dry, place, out of direct sunlight, not subject to temperature extremes, and with the manufacturer's protective cover in place.
4.
The surface on which the geotextile is to be placed shall be graded to the neat lines and grades as shown on the drawings. The surface shall be reasonably smooth and free of holes, vegetation, excessive mud, and projections. The surface preparation will be inspected and approved by the Technician prior to placing the geotextile.
SURFACE PREPARATION
5.
a.
PLACEMENT
The geotextile shall be placed on the approved, prepared surface at the locations and in accordance with the details shown on the drawings. The geotextile shall be unrolled along the placement area and loosely laid (not stretched) in such a manner that it will conform to the surface irregularities when the stone or other material is placed on or against it. The geotextile may be folded and overlapped to permit proper placement in the designated area.
General
No cuts, punctures, tears, or gaps in sewn or overlapped joints will be permitted in the geotextile.
The panel length shall be placed parallel to the direction of water flow, except as stated below in paragraph b. Slope Protection and d. Road Stabilization.
The geotextile panels may be joined by overlapping the roll ends 36 inches and sides a minimum of 18 inches and securing the overlap against the underlying foundation materials.
The fabric shall be restrained as needed to prevent lifting and displacement during construction.
Allowable restrainment methods include backfilled trenches, stitching, sandbags, rocks, and securing pins that are approved and provided by the geotextile manufacturer. The upstream or up-slope geotextile shall overlap the abutting down-slope geotextile.
The geotextile panels may be joined by machine sewing using thread described under 2.
Materials. The seam shall conform to Federal Standard SSa-2, SSn-2 or SSd-2.The sewing shall consist of two parallel stitched rows spaced approximately 1 inch apart. Each row of stitching shall be located a minimum of 2 inches from the geotextile edge. The seam type and sewing machine to be used shall produce a seam strength, in the specified geotextile, that provides a minimum of 90 percent of the tensile strength in the weakest principal direction of the geotextile being used, when tested in accordance with ASTM D 4884. The seams may be
13-3 5/10 factory or field sewn. All seaming and stitching of woven geotextiles shall be in the selvage.
Non-woven geotextiles shall be sewn a minimum of ½ inch from the edge. Geotextile shall be installed with the sewn seams pointing up.
The geotextile shall be restrained as needed during placement of overlying materials to prevent slippage, folding, or other movements of the geotextile.
Prior to covering, the geotextile shall be inspected by the Technician to ensure that the geotextile has not been damaged during construction. Backfill shall be placed by end dumping onto the geotextile from the edge of the geotextile or over previously placed backfill. Vehicles shall not be allowed directly on the geotextile. Materials shall be placed on the geotextile without causing tears, punctures, or separations of overlaps or sewn joints. Should such damage occur, the backfill around the damaged or displaced area will be removed and the subgrade restored to the original approved condition. Repair of the area shall consist of a patch of the same type of geotextile overlaying the existing geotextile. The patch shall extend a minimum of 2 feet from the edge of any damaged area.
b.
The geotextile shall not be placed until it can be anchored and protected with the intended covering within 48 hours. Temporary cover, for protection from ultraviolet light, may be used if the 48-hour limit will be exceeded. Material will not be dropped from a height of more than 3 feet on to uncovered geotextile. In lakeshore applications, the geotextile may be unrolled parallel or perpendicular to the bank. The geotextile shall be joined by machine sewing if the panel length is placed perpendicular to the direction of water flow (wave runup).
Slope Protection c.
The geotextile shall not be placed until drainfill or other material can be used to cover it within the same working day. Material will not be dropped from a height of more than 5 feet on to the geotextile and sharp, angular aggregates will not be used unless the drawing details state otherwise.
Subsurface Drains d.
The geotextile shall be unrolled in a direction parallel to the roadway centerline in a loose manner permitting it to conform to surface irregularities when the roadway fill material is placed on it. Overlap shall be in the direction of construction. The minimum overlap of geotextile panels joined without sewing shall be 24 inches. The geotextile may be temporarily secured with pins recommended by the manufacturer. They shall be removed prior to placement of the covering material. Slit tape geotextile shall not be used in a wet location.
Material will not be dropped from a height of more than 5 feet on to uncovered geotextile.
Road Stabilization
5/10 13-4
Table 1. Requirements for Woven Geotextiles by Use
Property Test Method Slope Protection Road Stabilization
Unprotected (Class I)
Protected (Class II) (Class IV) Slit Tape
Tensile Strength (lbs.)1
ASTM D
4632 Grab
Test
≥ 250 in any principal direction
≥ 120 in any principal direction
≥ 180 in any principal direction
≥ 200 in any principal direction
Elongation at failure (Percent)1
ASTM D
4632 Grab
Test ≤ 20 ≤ 35 ≤ 35 ≤ 10
Puncture (lbs.) 1 ASTM D 6241 ≥ 900 ≥ 350 ≥ 350 ≥ 700
Ultraviolet Light (percent residual tensile strength)
ASTM D
150 hours exposure
70 min. 70 min. 70 min. 70 min.
Apparent Opening Size (AOS)
ASTM D
≥ #100 (.150 mm) and ≤ #70
(.212 mm) 3
≥ #100 (.150 mm) and ≤ #70
(.212 mm) 3
≥ #100 (.150 mm) and ≤ #70
(.212 mm) 3
As specified or a min. size
> #50 3
Percent Open Area (POA) CW-02215 2 4.0 min. 4.0 min. 1.0 min. N/A
Permittivity (1/seconds) (gal/sq. ft./min.)
ASTM D
0.20 min.
15 min.
0.10 min.
7.5 min.
0.05 min.
3.8 min.
1 Minimum average roll values (MARV); calculated as the mean minus two standard deviations, yielding a 95 percent confidence level that the table value will be equaled or exceeded.
2 Test Methods prepared by U. S. Army Corps of Engineers 3 U. S. Standard Sieve Size
13-5 5/10
Table 2. Requirements for Nonwoven Geotextiles by Use
Property Test Method Slope Protection Subsurface
Drainage Road
Stabilization Unprotected
(Class I) Protected (Class II) (Class III) (Class IV)3
Tensile Strength (lbs.) 1
ASTM D
4632 Grab
Test ≥ 180 ≥ 120 ≥ 90 ≥ 180
Elongation At failure(percent)1
ASTM D
4632 Grab
Test ≥ 50 ≥ 50 ≥ 50 ≥ 50
Puncture(lbs.) 1 ASTM D 6241 ≥ 350 ≥ 250 ≥ 200 ≥ 200
Ultra- Violet Light(percent residual tensile strength)
ASTM D
150 hours exposure
70 min. 70 min. 70 min. 70 min.
Apparent Opening Size (AOS)
ASTM D
As specified or max. #40 2
As specified or max. #40 2
As specified or max. #40 2
As specified or max. #40 2
Permittivity (1/seconds) (gal/sq. ft./min.)
ASTM D
0.70 min.
52.5 min.
1 minimum average roll values (MARV); calculated as the mean minus two standard deviations, yielding a 95 percent confidence level that the table value will be equaled or exceeded.
2 U. S. Standard Sieve Size.
3 Heat-bonded or resin-bonded geotextile may be used.