SECTION B- SCHEDULE OF ITEMS. To complete for pricing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HMNF_Pavement_Preservation_Q A_7-16-14.pdf | ||
| AG-569R-S-14-0037_SOLICITATION_REV_TO_POST.pdf | ||
| MI140001_6-27-14.pdf | ||
| SectionC.pdf | ||
| SectionM.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY14 Pavement Rehabilitation
SECTION B- SCHEDULE OF ITEMS
FY 2014 PAVEMENT REHABILITION
HURON-MANISTEE NATIONAL FORESTS
Basis of Award:
Bidders shall enter an amount for each item. The Government intends to award one contract for the items listed below to the Contractor who provides the best overall value to the Government. The Government reserves the right to award all, part or none of the contract.
Item No.
Description Pay Unit
Quantity Unit Price
Total Price
1 Rainbow Rapids LPSM 1
2 M-20 ORV Trailhead LPSM 1
3 M-37 Little O Trailhead LPSM 1
4 Blacksmith Bayou Boat Lanch LPSM 1
5 Red Bridge Boat Launch LPSM 1
6 Kneff Lake LPSM 1
7 Mio Ranger District Parking LPSM 1
8 Loon Lake LPSM 1
9 Island Lake LPSM 1
10 Wagner Lake LPSM 1
TOTAL BID =
LPSM = Lump Sum Quantity
FY14 Pavement Rehabilitation
Optional Bid Items
Item No.
Description Pay Unit
Quantity Unit Price
Total Price
11 Loon Lake Option LPSM 1
12 M-33 Trailhead LPSM 1
13 Wagner Lake Option LPSM 1
14 Eagle Run LPSM 1
15 Canoers Memorial LPSM 1
16 Westgate Scenic Overlook LPSM 1
TOTAL BID =
LPSM = Lump Sum Quantity
NOTES:
1. The contractor shall build all costs associated with the contract to include but not limited to;
providing labor, superintendence, materials, supplies, equipment, and fees into the Schedule of Items. There will be no separate reimbursement for any costs not included within the schedule of items. The contractor must provide costs for all base and optional items to be considered for award.
2. In accordance with FAR Clause 52.217-4 the Government will evaluate total price for the basic requirement (base bid) together with any option(s) exercised at time of the award. In accordance with FAR Clause 52.217-7 the government reserves the right to award additional option(s) up to 180 days after contract award. The award of the options may occur in any order or combination.