Prebidamendment.docx

DOCX document 18 KB Posted

Attached to
Renovation of the Sylvania Clark Lake Day-Use Facility
Solicitation number
AG-569R-S-13-0040
Issued by

About this file

Pre-bid Question and Answers

View the file

Other files

File Type Posted
attendee_list.pdf PDF
amend2_sf_30.doc DOC document
Amendment_01.rtf RTF text file
sol_pkg.pdf PDF
Final_ClarkLakeDayUseProject_DWG-PKG.pdf PDF
7-15-13_Signed-Clark-Lake-Cover-Sheet.pdf PDF
Final_ClarkLakeProject7specs.10.13.pdf PDF
General_Decision_Number.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment No. 2 AG-569R-S-13-0040

SYLVANIA CLARK LAKE DAY USE FACILITY RENOVATION

OTTAWA NATIONAL FOREST

Pre-Bid Meeting Question and Answers Pre Bid held on 8/2/2013.

Q: Will the FS pay for plowing and heat for the building?

A: No to both items.

Q: Does the FS job trailer and signs in Section 015000.

A: No to both items. Any traffic control and the signs required by the CO to be posted on the site are still required.

Clarification: All rafter tails that are existing/protruding will be trimmed to match the details in the plans.

Q: Does the contractor need to draw permits from the state for the construction. Not DEQ permits.

A: No, the state has no jurisdiction. The FS will be using the ICC collection for code enforcement of the job.

Q: Do I need a PE to sign off on the mechanical and electrical submittals.

A: No, a Master Plumber or Master Electrician will be sufficient.

Clarifications:

1. Self-Leveling caulk will be used in the control joints.

2. The building is to be assumed asbestos and lead free. The FS is taking care of the analysis, if there is either present, this will be a change condition.

3. The contractors will not be paying for entrance fees.

4. There is rebar in the ramp on the backside of the building. Detail 1/C3.0.

5. COR phone number for questions, 231.357.2582

Q: How does the road contract affect this contract?

A: Both contracts will be noted that coordination between the two is required. That way there will be minimal conflicts.

Q: Can we do the work in the spring of 2014?

A: Yes, Please note on your pricing sheet if you plan on doing it in the spring, fall and spring, or fall. This will not affect the selection. It will allow the FS to have an idea on the coordination of the two contracts.

Q: Do we need any DEQ permits?

A: No