Revised_SOI.xls
XLS spreadsheet 22 KB Posted
- Attached to
- Black River Harbor Stair, Railing, & Platform Repair Federal contract opportunity
- Solicitation number
- AG-569R-S-09-0012
About this file
Revised Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit.doc | DOC document | |
| Amendment_01.doc | DOC document | |
| hubzone_brochure.pdf | ||
| Drawings.pdf | ||
| Contractor_Return.doc | DOC document | |
| RFP.doc | DOC document | |
| wage_decision.htm | HTM file | |
| location_maps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20090522 revised SOI
| Schedule of Items - Revised | ||||||
| Black River Harbor Recreation Site Repairs | ||||||
| Item / Description | Quantity | Unit | Unit Price | Total Cost | ||
| 15101 | 1 | LS | ||||
| Mobilization | ||||||
| 25101 | 14 | CY | ||||
| Rock Placement, north end of suspension bridge | ||||||
| 62001 | 125 | SF | ||||
| Wall cap Repair | ||||||
| 62001 | 100 | SF | ||||
| Tuck Pointing and face rock replacement | ||||||
| 051 West half | 8 | EA | ||||
| 051 East half | 5 | EA | ||||
| Rainbow Falls 12" pier replacement, west half | 1 | to | 4 | EA | ||
| Rainbow Falls 12" pier replacement, East half | 1 | to | 20 | EA | ||
| 052 West half | 1 | EA | ||||
| 052 East half | 3 | |||||
| Rainbow Falls 20" Pier replacement, West half | 1 | to | 2 | EA | ||
| Rainbow Falls 20" Pier replacement, East half | 1 | to | 7 | EA | ||
| 053 | 4 | EA | ||||
| Rainbow Falls Railpost Splice | 5 | to | 8 | EA | ||
| 05 | 1 | LS | ||||
| Rainbow Falls Carriage and Joist replacement | ||||||
| 05 | 1 | LS | ||||
| Rainbow Falls Stair remove stump | ||||||
| 06 | 650 | LF | ||||
| Safety Rail Placement | 748 | to | 900 | LF | ||
| 07 | 1880 | LF | ||||
| Guard Rail Replacement | 2162 | to | 2300 | LF | ||
| 08 | 1 | LS | ||||
| Removal of Gorge Stairs and Bridge X | ||||||
| 09 | 160 | LF | ||||
| Removal of Guard Rails and Misc. Stairs | ||||||
| 10 | 130 | SF | ||||
| Replacement of part of Observation Deck #3 | 150 | to | 450 | SF | ||
| 11 | 1 | LS | ||||
| Placement of Bridge #1, 22' | ||||||
| 12 | 1 | LS | ||||
| Placement of Bridge #2, 28' | ||||||
| Total |
File details come from the government source that posted it. Updated .