Project Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| sf_30_PrebidAnswers.docx | DOCX document | |
| General Decision Number.pdf | ||
| Drawings Sheet 1.pdf | ||
| Appendix A.pdf | ||
| kr_keep.pdf | ||
| kr_return.pdf | ||
| Drawings Sheet 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
TOWER RESTORATION AND BUILDING PAINTING
POINT IROQUOIS LIGHTHOUSE
USDA-FOREST SERVICE, HIAWATHA NATIONAL FOREST
BRIMLEY, MICHIGAN
U.S. Department of Agriculture Forest Service
SPECIFICATION INDEX .................................................................................. Page
DIVISION 01 - GENERAL REQUIREMENTS
01 10 10 – Summary of the Work 01 10 20 – Quality Control 01 13 00 - Submittals 01 17 10 - Clean-up and Disposal
DIVISION 04 – MASONRY
04 01 25 Unit Masonry Restoration
DIVISION 07 - SEALANTS
07 92 00 Joint Sealants
DIVISION 08 – OPENINGS
08 11 13 Steel Doors and Frames 08 71 00 Door Hardware 08 80 00 Glazing 08 95 17 Wall Vent Rehabilitation
DIVISION 09 - FINISHES
09 90 00 Painting and Coating
SECTION 01 10 10 SUMMARY OF THE WORK
PART 1 - GENERAL
1.01 LOCATION
This project is located at the Point Iroquois Light House, approximately 8 miles west of Brimley, Michigan on Lake Shore Drive.
1.02 INTENT OF CONTRACT
The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work.
1.02 DESCRIPTION OF WORK
The work items described below will not be separately measured for payment, each shall be performed on a lump sum basis unless noted otherwise.
1. Tower Restoration and Building Painting - All work shown on the drawings and described in the specifications for lighthouse tower restoration and lighthouse tower and building painting; excluding the work described under work items 2 through 5.
2. Brick Replacement - Removal and disposal of existing deteriorated brick and replacement with new brick. The quantity is estimated to be 200 sq. ft. for bidding purposes. The actual areas will be identified after the paint is removed and will be measured and paid as an AQ (actual quantity) item.
3. Mortar Joint Rehabilitation and Repointing – Inspect and rehabilitate mortar joints on the tower, remove and dispose of loose, cracked, and/or deteriorated mortar, rake joints, and repoint joints.
4. Tower Entrance Door Replacement - Remove and dispose of existing exterior tower entry door, frame, and hardware. Furnish and install new door, frame, hardware, and storm proof louver.
5. Cleaning Interior Relief Vents and Exterior Wall Relief Hoods – Clean all interior wall relief vents. Clean all exterior relief hoods and install insect screens at relief hood openings.
1.03 PROJECT LAYOUT
A. Contractor shall layout the work based on reference points indicated on the Drawings. Obtain approval of layout from Contracting Officer before beginning each portion of the work.
B. Verify grades, lines, levels, locations, and dimensions as shown on the
Drawings, and inspect surfaces that are to receive work before proceeding with fabricating, assembling, fitting, or erecting. Notify
Contracting Officer in writing in case of unsuitable conditions, defective substrates, or discrepancies in Contract Documents. Starting of work shall imply acceptance of conditions.
C. Correct any errors or defects due to faulty measurements, improper layout, or failure to report discrepancies. Remove and replace work applied to defective substrates at no additional cost.
1.04 SPECIFICATIONS
A. The specifications establish the construction procedures and materials be employed throughout.
B. Some variation in construction details will be allowed for offsite construction of subsystems or total units, provided that the final product is equal to or superior to that shown and specified. Use of the finish materials shall remain as specified or as shown on the drawings.
C. Submit shop drawings for approval for all components that are in variance from that specified or shown on the drawings or that vary in dimension, slope, configuration, etc. The Government retains the right to reject any component or system that in its opinion is not fully comparable to that specified herein.
1.05 CONTRACTOR OFFICE: The contractor may have one self-contained trailer at the project site for an office.
1.06 CONTRACTOR USE OF PREMISES
A. The Government will conduct a pre-construction survey with the Contractor to review and document the existing project conditions prior to construction.
B. Work shall be performed Monday-Friday, 8:00 AM through 6:00 PM unless otherwise authorized in writing by the C.O. Work on federally recognized holidays is not allowed unless authorized in writing by the C.O.
C. The Government will occupy the site during construction. The site will be open to the public during construction, although partial and temporary closures are expected to take place. The contractor will develop and submit to the Government for approval an operation plan showing how they will coordinate and separate their operations from areas open to the public.
Staging areas, storage areas, access points, partial closures, closure methods and devices, and safety will be part of this plan.
D. Repair damage caused by construction operations. Take precautions to protect the public during the construction period.
E. Space on the premises is available for the Contractor's storage and related activities.
F. Existing materials and equipment that are removed as part of the construction operations, and that are not reused or salvaged as Government property, shall become the property of the Contractor and shall be promptly removed from the site.
D. Water, electricity and toilet facilities are available at the site for construction work, free of charge.
1.07 STANDARDS AND CODES: All work shall comply with the latest edition of applicable standards and codes of the following:
ASA American Standards Association ASTM American Society of Testing Materials NECA Standards for Installation NEMA Standards for Materials and Products NFPA Life Safety Code - NFPA 101 OSHA Occupational Safety and Health Act IBC International Building Code IMC International Mechanical Code EPA Lead-Based Paint Disposal
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 – EXECUTION (NOT APPLICABLE)
PART 4 – SCHEDULES (NOT APPLICABLE)
END OF SECTION
SECTION 01 10 20 QUALITY CONTROL
1.01 DESCRIPTION OF THE WORK
This work shall consist of providing quality control in conformance with the inspection of construction provisions (FAR 52.246-12) of this contract and to ensure compliance with the drawings, specifications and related provisions of the contract.
1.02 QUALITY CONTROL SYSTEM
A. Contractor Responsibility:
1. The quality of all work shall be the responsibility of the Contractor.
2. Sufficient inspection and testing of all kinds of work, including that of Subcontractors, to ensure conformance to applicable specifications and drawings, considering quality of materials, workmanship, construction, finish, functional performance and identification shall be performed on a continuing basis.
3. Quality control shall be adequate to cover all construction operations and materials, shall be keyed to the proposed construction sequence and shall be coordinated by the Contractor.
B. Quality Control Staff:
1. The Contractor shall provide sufficient quality control staff to ensure that all services, supplies, and construction required under this contract conform to the contract requirements.
2. The QC (Quality Control) or another member-of the quality control staff shall be employed full time at the project site whenever contract work is in progress.
3. The cost of providing the QC and other members of the quality control staff, including incidental expenses, shall be borne by the Contractor
C. Quality Control Plan Content. The Contractor shall submit the following, in writing, to the CO:
1. Quality Control's name, quality control experience and qualifications.
2.· Inspector(s) designated by the QC, indicating name(s), quality control experience and qualifications.
3.· The name and location of the material-testing firm(s) designated by the
QC with a description of their testing capabilities and qualifications.
D. Quality Control Plan Approval:
1. The Contractor's proposed quality control plan shall be submitted to the CO for review prior to the Contractor commencing work.
2 Within 14 days of receipt of plan, the CO shall notify the Contractor whether the plan adequately covers quality control requirements.
Construction work shall not be performed prior to Contractor's receipt of written approval of the proposed plan.
E. Quality Control Plan Changes:
1. Quality control shall be conducted as required in the contract specifications. If changes are necessary, they shall be brought to the attention of the CO.
2. Proposed changes shall not be put into effect until approved in writing by the CO.
PART 2 - PRODUCTS NOT APPLICABLE
PART 3 - EXECUTION
3.01 SAMPLING, TESTING AND INSPECTION
A. The QC shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. The QC and/or other member(s) of the quality control staff shall take samples and perform inspections and tests necessary to verify the quality of construction required by the contract.
B. The QC and designated Inspector(s) shall have a copy of the contract drawings and specifications at the jobsite where and when quality control work is being conducted.
3.02 RECORD OF INSPECTIONS, TESTING AND MEASUREMENT
A. Inspection reports documenting the record of results of field inspections for compliance or non-compliance with contract specifications shall be prepared for each site visit. The report shall be signed by the QC and submitted to the CO and the Contractor. The inspection reports shall be submitted not less than weekly to the CO and shall include test results and certifications.
B. The inspection reports shall contain sufficient detail to allow the Government to determine what was inspected and whether or not the work was in compliance with the requirements of the drawings and the specifications.
Any unsatisfactory work shall be noted in the inspection report(s) and shall be brought promptly to the attention of the CO.
C. By signing the inspection report, the QC is certifying that all inspections, tests and measured quantities were personally observed, or observed by designated Inspectors and were performed in accordance with the drawings and contract specifications.
D. As-Built Drawings: The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the CO.
3.03 OFFSITE PRODUCED MATERIALS:
A. The Contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements shown on the drawings or stated in the specifications. Incidental purchases needed to remedy minor shortages of materials shall be certified by the Contractor.
SECTION 01 13 00 SUBMITTALS
1.01 REQUIREMENTS
A. It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow 10 calendar days for processing of submittals by the Government.
B. A detailed work schedule is required for this contract. If work gets off schedule, the schedule will be promptly updated and re-submitted to the Government.
C. Partial list of other submittals required:
1. Quality Control Plan
2. Operation plan related to site management and access
3. Mechanical Tool for mortar removal if proposed
4. Replacement brick
5. Mortar mix design
6. Joint cleaner, joint primer/sealer, caulking
7. Steel door, frame, door stop, and associated shop drawings
8. Door louvers
9. Door primer and paint
10. Door hardware
11. Glazing
12. Insect Screening
13. Paint removers
14. Lead paint removal and disposal plan
15. Patching materials
16. Emulsion Conditioner
17. Primer, paint, and color charts
1.02 MANUFACTURER'S LITERATURE AND SHOP DRAWINGS
A. Submit (1) one copy to the CO for approval on the items required herein.
Literature which is not marked or otherwise designated to show the exact model, size, etc., the contractor proposed to use, will be returned by the CO "without action." Circle or check items on submittals. Highlighter pens may print black or not at all when copied.
B. Information must be adequate to determine compliance with specifications.
C. Submit (3) five copies of materials that cannot reasonably be copied on typical copy machines
D. Submittals which are received from sources other than through contractor's office will be returned by the CO "without action."
1.03 SAMPLES
A. Submit two samples of each color, style, etc. One sample of selected color, etc., will be retained. All other samples and all hardware samples will be returned.
SECTION 01 17 10 CLEAN UP AND DISPOSAL
1.01 CLEAN UP
A. The contractor shall keep the work site free from accumulation of waste materials and rubbish resulting from the work.
B. Before final acceptance of the project by the Government, the contractor shall remove from Government land all waste materials and rubbish, resulting from this work.
1.02 DISPOSAL
A. Trash and Garbage:
1. Haul to State-approved sanitary landfill.
B. Washing waste material down sewers or into waterways shall not be permitted.
SECTION 04 01 25 UNIT MASONRY RESTORATION
PART 1 GENERAL
1.01 SUMMARY
A. Provide unit masonry restoration as shown and as specified. The exact amount of brick replacement and repointing will not be known until after the paint is removed and the tower is inspected by the contractor with input from the Contracting Officer.
B. Work includes the following:
1. Removing vegetation (if any).
2. Removing existing paint (see Section 09 90 00).
3. Removing deteriorated brick and replacing with new brick.
4. Removing deteriorated mortar and raking joints for tuckpointing.
5. Removing existing caulk joints and replacing backer rod.
6. Repointing cracked, eroded, or crumbling mortar joints.
7. Recaulking joints.
8. Drilling weep holes.
1.02 SUBMITTALS
A. Product Data: Submit product data for proposed replacement brick.
B. Test Reports:
1. Submit gradation of proposed aggregate for mortar.
2. Submit mix proportions and certified test reports of compressive strength and water retention for mortar.
C. Make submittals in accordance with Section 01 13 00, Submittals, on page 8.
1.03 PROJECT CONDITIONS
A. Do not repoint mortar joints or repair masonry unless air temperature is between 40 deg F and 80 deg F and will remain so for at least 48 hours after completion of work.
B. Prevent mortar from adhering to face of masonry to be left exposed. Remove immediately grout or mortar in contact with masonry.
C. Protect sills, ledges, and projections from droppings of mortar.
PART 2 PRODUCTS
2.01 BRICK
A. Deteriorated brick shall be replaced with new brick physical properties (strength and absorption rate), surface texture, size and shape to match existing brick.
2.02 MORTAR
A. General: Replacement mortar shall match original mortar in texture, strength, and hardness (density and porosity).
B. Portland Cement: ASTM C150, Type I or III.
C. Hydrated Lime: ASTM C207, Type S.
D. Aggregate for Mortar: Natural sand or manufactured sand obtained by crushing stone or gravel, ASTM C144.
E. Water: Clean and free from deleterious amounts of acid, alkali, or organic material.
F. Admixtures: Antifreeze compounds shall not be used in mortar. Plasticizers, such as Master Builders "Omicron Om", Tamms "Hydratite Plus", American Colloid Co. "Easy Spred", or approved equal, may be added to mortar for unit masonry.
G. Mortar Cement: Mortar cement may be used in lieu of portland cement and lime at Contractor's option.
H. Masonry Cement: Masonry cement may not be used.
2.03 CAULK
A. Replacement caulk shall match existing caulking in color. Refer to Section 07 92 00 for caulk (sealant) material requirements.
2.04 WEEP MESH MATERIAL
A. UV-stabilized, polyester mesh material suitable for allowing drainage through weepholes.
PART 3 EXECUTION
3.01 EXAMINATION
A. Examine areas and conditions under which masonry restoration and cleaning work is to be conducted and notify of conditions detrimental to proper and timely completion of the work. Do not proceed with the work until satisfactory conditions have been adequately corrected.
3.02 REMOVING VEGETATION
A. Remove plant, moss, and shrub growth completely from masonry surfaces.
Carefully remove plants, creepers, and vegetation by cutting at roots and allowing to dry as long as possible prior to removal. Remove loose soil or debris from open masonry joints to whatever depth it occurs.
3.03 REMOVING PAINT
A. See Section 09 90 00.
3.04 REMOVING EXISTING MASONRY
A. Remove deteriorating mortar joints and brick using hand or mechanical tools.
Use care and avoid damaging existing bricks or enlarging width of joints.
Contractor shall be responsible for work and costs associated with replacing adjacent masonry units that become damaged during removal process.
B. Mechanical tools will be permitted only on specific written approval of Contracting Officer and demonstrated ability by operators to use them without damage to masonry. Bricks which have more than 1/16 in. of material removed by mortar removal process shall be replaced at the contractor’s expense.
C. Remove existing mortar back a minimum of 3/4 in. in each joint. Thoroughly remove loose material from joints using a hose stream under normal pressure or by low-pressure compressed air.
3.05 REMOVING CAULK
A. Remove existing caulk from joints where masonry abuts dissimilar materials.
B. Replace backer rod.
3.06 MORTAR MIXING
A. Add only enough water to dry mix ingredients to produce a damp, workable mix.
Keep mortar in dampened condition for 1 to 2 hours, and then add sufficient water to bring it to proper consistency.
3.07 REPLACING BRICK
A. Brick surfaces in the wall shall be dampened before new units are placed.
Masonry shall have absorbed all surface moisture to ensure a good bond.
B. Appropriate surfaces of surrounding brick and replacement brick shall be buttered with mortar prior to placement. Bond pattern shall match existing wall construction; header units shall be provided where they previously existed.
C. Excess mortar shall be removed with a trowel. Replacement brick shall be pointed to ensure full head and bed joints.
D. When mortar is "thumbprint" hard, joints shall be tooled to match the original profile.
3.08 TUCKPOINTING
A. After carefully routing and cleaning joints, wet joints thoroughly and then apply fresh, pre-hydrated mortar. Allow water to soak into joints, but joints should not be visibly wet with standing water during tuckpointing.
B. Fill mortar joints in layers not over 3/8 in. thick, with each layer applied with pressure as soon as previous layer has partially dried. Do not tool each layer smooth; leave surface rough to help bond of subsequent layers. Compress final packing as much as possible to completely fill joint. Compact joints solidly before final tooling.
C. Tool joints to match existing unless otherwise indicated. Take care to not spread mortar over edges of brick/stone onto exposed surfaces. Do not featheredge mortar. Cure mortar by maintaining in a damp condition for 5 days.
D. Inspect existing weepholes, if any, to determine if they are clogged. Clean out clogged weepholes by probing with a thin wood dowel or stiff wire.
3.09 RECAULKING JOINTS
A. Recaulk all joints. Comply with provisions of Section 07 92 00.
3.10 INSTALLING WEEPHOLES
A. Drill new weepholes in masonry as indicated on Drawings. Ensure that completed weephole is at invert of interior horizontal space and drains to exterior of structure.
B. Insert weep mesh material into exterior of weepholes to a depth of approximately 4 in.
SECTION 07 92 00 JOINT SEALANTS
PART 1 GENERAL
1.01 SUMMARY
A. Provide joint sealant work as shown and as specified.
1.02 SUBMITTALS
A. Product Data: Submit manufacturer's product data, recommendations, and installation instructions for each type of sealer and associated materials.
Include manufacturer's published data, and letter of certification or certified test laboratory report that each material complies with requirements and is intended for applications shown.
B. Color Samples: Furnish color charts and actual material color samples; color will be selected from manufacturer's colors.
C. Make submittals in accordance with Division 01.
1.03 QUALITY ASSURANCE
A. Obtain elastomeric materials from manufacturers who will, if requested, send a qualified technical representative to advise installer of proper procedures and precautions for use of materials.
B. Employ only skilled, experienced workers for sealant application.
PART 2 PRODUCTS
2.01 GENERAL BUILDING SEALANTS
A. Urethane, one-part, air curing, elastomeric sealant, complying with ASTM C920, Type S, Grade NS, Class 25; Tremco "Dymonic", Pecora "Dynatrol I", Sika "Sikaflex 1a", Sonneborn "Sonolastic NP1", or approved equal.
2.02 JOINT CLEANER
A. Provide type of joint cleaner recommended by sealant manufacturer for the particular joint sealant.
2.03 JOINT PRIMER/SEALER
A. Provide type of joint primer/sealer recommended by sealant manufacturer for the particular joint sealants and substrates.
2.04 BOND BREAKER TAPE
A. Polyethylene tape or other plastic tape, as recommended by sealant manufacturer, to be applied to sealant contact surfaces where bond to substrate or joint filler must be avoided for performance of sealant. Provide self-adhesive tape where applicable.
2.05 SEALANT BACKER ROD
A. Compressible closed-cell rod stock of polyethylene foam, polyethylene jacketed polyurethane foam, butyl rubber foam, neoprene foam or other flexible, permanent durable non-absorptive material recommended by sealant manufacturer. Provide size and shape of rod which will control joint depth for sealant placement, break bond of sealant and form optimum shape of sealant bead on back side, and provide a highly compressible backer to minimize sealant extrusion when joint is compressed.
PART 3 EXECUTION
3.01 INSTALLATION, GENERAL
A. Provide sealing and caulking to produce weathertight conditions throughout.
Caulk around exterior and interior masonry openings; seal construction joints as shown. Joints shall be caulked before painting adjacent work.
B. Examine joint surfaces, backing and anchorage of units forming sealant rabbet, and conditions under which sealant work is to be performed; notify of conditions detrimental to proper and timely completion of work and performance of sealants. Do not proceed until unsatisfactory conditions are corrected.
3.02 WEATHER CONDITIONS
A. Do not proceed with installation of sealants when adverse weather conditions are forecasted, nor when temperatures are outside manufacturer's recommended limitations. Proceed only when conditions are favorable for proper cure and development of bond strength. Wherever joint width is affected by ambient temperature variations, install elastomeric sealants only when temperatures are in the lower third of manufacturer's recommended installation temperature range, so that sealant will not be subjected to excessive elongation and bond stress at subsequent low temperatures.
3.03 JOINT SURFACE PREPARATION
A. Clean joint surfaces immediately before installation of sealant or caulking compound. Remove dirt, unsecure coatings, moisture and other substances which would interfere with bond of sealant or caulking compound.
B. Masonry and wood shall be sound and dry. Cure concrete a minimum of 28 days. Etch concrete and masonry joint surfaces to remove excess alkalinity, unless sealant manufacturer's printed instructions indicate that alkalinity does not interfere with sealant bond and performance. Etch with 5% solution of muriatic acid; neutralize with dilute ammonia solution, rinse thoroughly with water and allow to dry before sealant installation.
C. Roughen joint surfaces on vitreous coated and similar non-porous materials, wherever sealant manufacturer's data indicates lower bond strength than for porous surfaces. Rub with fine abrasive cloth or wool to produce a dull sheen.
3.04 INSTALLATION
A. Comply with sealant manufacturer's instructions except where more stringent requirements are shown or specified. Prime or seal joint surfaces as recommended by sealant manufacturer. Do not allow primer/sealer to spill or migrate onto adjoining surfaces.
B. Install sealant backer rod for liquid elastomeric sealants, except where shown to be omitted or as recommended by sealant manufacturer.
C. Employ only proven installation techniques, which will ensure that sealants will be deposited in uniform, continuous ribbons without gaps or air pockets, with complete "wetting" of the joint bond surfaces equally on opposite sides. Except as otherwise indicated, fill sealant rabbet to a slightly concave surface, slightly below adjoining surfaces. Horizontal joints between a horizontal surface and a vertical surface shall be filled to form a slight cove, so that joint will not trap moisture and dirt.
D. Install sealants to depths as shown, or if not shown, as recommended by sealant manufacturer but within the following general limitations, measured at the center (thin) section of bead.
1. For normal moving joints sealed with elastomeric sealants, but not subject to traffic, fill joints to a depth equal to 50% of joint width, but neither more than ½ in. deep nor less than ¼ in. deep.
E. Do not allow sealants or compounds to overflow or spill onto adjoining surfaces, or to migrate into the voids of adjoining surfaces including rough textures such as exposed aggregate panels. Use masking tape or other devices to prevent staining of adjoining surfaces, by either the primer/sealer or the sealant/caulking compound.
F. Remove excess and spillage of compounds promptly as the work progresses.
Clean the adjoining surfaces by whatever means may be necessary to eliminate evidence of spillage, without damage to the adjoining surfaces or finishes.
3.05 CURING
A. Cure sealants and caulking compounds in compliance with manufacturer's instructions and recommendations to obtain high early bond strength, internal cohesive strength and surface durability.
B. Protect sealants and caulking compounds during construction period to prevent deterioration or damage (other than normal wear and weathering).
SECTION 08 11 13 STEEL DOORS AND FRAMES
PART 1 GENERAL
1.01 SUMMARY
A. Provide steel doors and frames as shown and as specified.
1.02 SUBMITTALS
A. Shop Drawings: Submit shop drawings indicating location, elevation of door, frame type (wall thickness and corners), materials, methods of assembling, requirements for hardware, joints, and connections.
B. Make submittals in accordance with Division 01.
1.03 QUALITY ASSURANCE
A. General: Provide doors and frames complying with ANSI A250.8 "Recommended Specifications for Standard Steel Doors and Frames" and as herein specified.
PART 2 PRODUCTS
2.01 MATERIALS
A. Metallic-Coated Steel Sheet: ASTM A653, Commercial Steel (CS), Type B; with minimum A40 (ZF120) zinc-iron-alloy (galvannealed) coating designation.
2.02 STEEL DOORS
A. General: Provide steel doors complying with ANSI A250.8 for level and model and ANSI A250.4 for physical endurance level indicated, 1-3/4 in. thick, unless otherwise indicated.
B. Exterior Doors: Doors meeting requirements for Level 3 and Physical Performance Level A (extra heavy duty), Model 2 (seamless), and the following:
1. Face Sheets: Metallic-coated steel sheet.
2. Core Construction: Manufacturer's standard material. Insulation is not required.
3. Top Closure: Flush with door top.
C. Clearance: Clearance for doors shall be 1/8 in. at jambs and heads, 1/8 in. at meeting stiles of doors, 3/4 in. between bottom of doors and finished floor and 3/8 in. between bottom of door and top of threshold unless indicated otherwise.
Verify clearance requirements for floor coverings.
2.03 STEEL FRAMES
A. General: Provide welded steel frames for doors, sidelights, and borrowed lights conforming to size and shape as shown.
B. Exterior Frames: Fabricate of 0.067 in. (14 ga) metallic-coated steel sheet.
C. Welding: Frame joints shall be mitered or butted and continuously arc-welded for full depth and width of frame, with welds on exposed surfaces dressed smooth and flush.
D. Reinforcement: Reinforce joints between members with concealed clip angles of same thickness as frame.
E. Anchors: Each jamb shall be provided with 16 ga steel angle floor clips punched with 5/16 in. holes. Frames shall be provided with three jamb anchors per jamb, of type suitable for conditions. Provide bolt-thru anchorage consisting of prepunched countersunk bolt holes in face of stop, frame sleeve and backplate and 5/16 in. expansion bolts with flat Philips head.
2.04 STOPS
A. Doors and frames receiving air transfer grilles shall be equipped with plain rectangular steel stops and trim as required. Screws shall be countersunk, flat Philips head type.
B. Unless specifically shown otherwise, frames shall be designed with loose stops on interior or room side of frame.
2.05 DOOR LOUVERS
A. Provide door louvers (grilles) of size as indicated; see drawings.
B. Louvers shall be stormproof Z-blade type, galvanized steel, 18 ga frame and blades in prime finish, with 18-by-18 stainless steel insert screen in frame on interior side.
2.06 FABRICATION
A. Manufacturer shall provide cut-outs as required, closed with channel or plate, and reinforced as required. Confirm hardware requirements before fabrication and make adjustments required to accommodate hardware specified.
B. Frames shall be mortised and reinforced for hardware. Mortised hardware reinforcements shall be factory-drilled and tapped. Surface applied hardware may be field drilled.
2.07 FINISH
A. Clean steel doors and frames of dirt, grease, oil and foreign substances.
Remove mill scale and rust from uncoated steel in accordance with SSPC-SP3 or SSPC-SP6. Repair surfaces of galvanized steel in accordance with ASTM A780.
B. Apply one coat of manufacturer's standard lead and chromate-free, rust inhibitive primer. Primed surfaces shall meet acceptance criteria of ANSI A250.10. Finish paint shall be applied under Section 09 90 00.
PART 3 EXECUTION
3.01 INSTALLATION, GENERAL
A. Install frames and doors in accordance with shop drawings, manufacturer's recommendations, and as specified herein. Hardware shall be installed under Section 08 71 00.
3.02 FRAMES
A. Erect hollow metal frames in a straight, plumb, true, and secure manner.
Provide bracing to hold frames in proper place until built into structure or partition where shown. No less than three anchors shall be installed at each jamb of each frame for securing frame to wall construction.
B. Type of anchorage items shall be determined by wall and head construction and as recommended by frame manufacturer. Anchor each jamb and mullion to floor through standard or special attached clip angles, using 1/4 in. expansion bolt or 1/4 in. power driven stud. Do not remove angle spreaders until entire installation is complete.
3.03 DOORS
A. Install doors with equal width spaces on each side, to fit snugly without binding.
After doors are fitted, remove them to allow painter to finish tops and bottoms as well as faces and edges. Rehang doors in proper manner.
SECTION 08 71 00 DOOR HARDWARE
PART 1 GENERAL
1.01 SUMMARY
A. Provide door hardware as shown and as specified.
1.02 SUBMITTALS
A. Product Data: Submit 2 copies of manufacturer's product data for each item of door hardware. Include information to show compliance with specified requirements.
B. Templates: Furnish hardware templates to each fabricator of doors, frames, and other work to be factory-prepared for installation of hardware. Upon request, check shop drawings of such other work to confirm that adequate provisions are made for proper installation of hardware.
C. Make submittals in accordance with Division 01.
1.03 PRODUCT HANDLING
A. Tag each item or package separately, with identification related to final hardware schedule, and include basic installation instructions in package.
Deliver individually packaged hardware items at proper times and locations (shop or field) for installation.
B. Provide secure lockup for hardware delivered to project, but not yet installed.
Control handling and installation of hardware items which are not immediately replaceable, so that completion of work will not be delayed by hardware losses.
1.04 WARRANTY
A. Closers shall be warranted by manufacturer for a period of 2 years from date of substantial completion. Other items shall have standard 1 year manufacturer's warranty.
PART 2 PRODUCTS
2.01 ACCEPTABLE MANUFACTURERS
A. Products identified in this Section by reference to a specific manufacturer and product name/number are identified for the purpose of establishing a standard of quality, type, and function. Unless otherwise indicated, products of the following manufacturers, or approved equal, may be substituted for those listed, provided the substitution is equal in quality, type, and function and meets the specified requirements:
1. Butts and Hinges: Stanley, Hager, McKinney.
2. Push Plates and Pulls: Hiawatha, Quality, Ives, Burns, Rockwell.
3. Closers: Corbin Russwin, LCN, Norton, Sargent, Yale.
4. Thresholds and Weatherstripping: Zero, Reese, Pemko.
2.02 BASE METALS
A. Produce hardware units of basic metal indicated, using manufacturer's standard metal alloy, composition, temper and hardness.
2.03 FORMING
A. Form base metal into required shapes and sizes by manufacturer's standard production method for class or quality of hardware units required.
2.04 FASTENERS
A. Manufacture hardware to conform to published templates, generally prepared for machine screw installation. Do not provide hardware which has been prepared for self-tapping sheet metal screws, except as specifically indicated.
B. Furnish screws for installation with each hardware item. Provide Phillips flathead screws, except as otherwise indicated. Finish exposed screws to match hardware finish.
C. Provide concealed fasteners for hardware units which are exposed when door is closed. Do not use through bolts for installation where bolt head or nut on opposite face is exposed under any condition.
D. Provide fasteners which are compatible with both unit fastened and substrate, and which will not cause corrosion or deterioration of hardware, base material or fastener.
2.05 FINISHES
A. Match finish of hardware units at each door or opening to greatest extent possible. In general, match finish of latch and lockset for color and texture.
B. Designations used in schedules and elsewhere to indicate hardware finishes are those of ANSI/BHMA A156.18 "Materials and Finishes" and traditional U.S.
finishes used by certain manufacturers.
2.06 KEYING
A. Deadlock and keys will be furnished by Government.
PART 3 EXECUTION
3.01 HARDWARE MOUNTING HEIGHTS
A. Mount door hardware units at heights indicated in following applicable publications, unless specifically indicated or required to comply with governing regulations:
1. Standard Steel Doors and Frames: Door and Hardware Institute's
"Recommended Locations for Architectural Hardware for Standard Steel Doors and Frames".
3.02 INSTALLATION
A. Install hardware items in compliance with manufacturer's instructions and recommendations. Wherever cutting and fitting is required to install hardware onto or into surfaces which are later to be painted or finished, install each item completely and then remove and store in a secure place. After completion of finishes, reinstall each item.
B. Adjust and check each operating item of hardware and each door, to ensure proper operation or function. Lubricate moving parts with type of lubrication recommended by manufacturer; use graphite-type if no other type is recommended. Replace units which cannot be adjusted and lubricated to operate freely and smoothly.
C. Instruct Government's personnel in proper operation and maintenance of hardware and hardware finishes during final adjustment of hardware.
PART 4 SCHEDULES
4.01 HARDWARE SCHEDULE
A. Group 1 - Exterior Single Steel:
1-1/2 Pair Hinges: Stanley FBB 199 4-1/2 x 4-1/2 x NRP 626 1 Deadlock: Yale 1152 Inset Insert Deadbolt Lockset * 626 1 Push: 8 in. x 16 in. x 16 ga 630 1 Pull: Rockwood 111 630 1 Closer with Hold Open: Corbin Russwin DC3000 Series x A5 689 1 Threshold: Reese S427A Clear Alum.
1 Set Weatherstrip: Reese 961 (jambs); Reese 755 (head) Clear Alum.
1 Sweep: Reese 967 Clear Alum.
* Furnished by Government for installation by Contractor.
SECTION 08 80 00 GLAZING
PART 1 GENERAL
1.01 SUMMARY
A. Provide glazing work as shown and as specified.
1.02 SUBMITTALS
A. Product Data: Upon request, submit product data and installation instructions for each type of glass. Include data substantiating that glass complies with specified requirements.
B. Make submittals in accordance with Division 01.
1.03 QUALITY ASSURANCE
A. Glazing Publications: Installation procedures shall comply with following publication(s), except as indicated otherwise, and except as specifically recommended otherwise by manufacturers of glass and glazing materials.
1. Glazing Association of North America "Glazing Manual".
1.04 DELIVERY, HANDLING, AND STORAGE
A. Protect glass from edge damage during handling and installation.
PART 2 PRODUCTS
2.01 FLOAT GLASS
A. ASTM C1036, Type I (transparent, flat), Class 1 (clear), Quality q3 (glazing select), 1/4 in. thick, except as otherwise indicated.
2.02 GLAZING MATERIALS
A. Provide glazing tape, shims, setting blocks, glazing compound, caulking materials, and neoprene strip as required to complete glazing work as indicated.
PART 3 EXECUTION
3.01 PREPARATION
A. Glazing channel shall provide for necessary minimum bite on glass, minimum edge clearance and adequate sealant thicknesses, with reasonable tolerances.
Provide correct glass size for each opening, within tolerances and necessary dimensions established.
B. Examine framing and glazing channel surfaces, backing, removable stops and conditions under which glazing is to be performed. Notify of conditions detrimental to proper and timely completion of work. Do not proceed with glazing until unsatisfactory conditions have been corrected.
C. Do not proceed with installation of sealants during adverse weather or when temperatures exceed manufacturer's recommended limitations.
3.02 INSTALLATION, GENERAL
A. Watertight and airtight installation of each piece of glass is required. Installation shall withstand normal temperature changes, wind loading, and impact loading (for operating sash and doors) without failure of any kind, including loss or breakage of glass, failure of sealants or gaskets to remain watertight and airtight, deterioration of glazing materials and other defects in the work.
3.03 GLASS INSTALLATION
A. Clean glazing channel and framing members to receive glass. Remove coatings and glazing compounds which are not firmly bonded to substrate.
Remove lacquer from metal surfaces where elastomeric sealants are used.
Apply primer or sealer to joint surfaces as recommended by sealant manufacturer.
B. Do not attempt to cut, seam, nip or abrade glass which is tempered, heat strengthened, or coated. Inspect each piece of glass immediately before installation, and reject any which has edge damage or face imperfections.
C. Install setting blocks of proper size at quarter points of sill rabbet. Set blocks in thin course of heel-bead compound.
D. Provide spacers inside and out, of proper size and spacing, for glass sizes larger than 50 united in. (length plus height). Provide 1/8 in. minimum bite of spacers on glass. Use thickness equal to sealant width, except with sealant tape use thickness equal to final compressed thickness of tape.
E. Unify appearance of each series of lights by setting each piece to match others as nearly as possible. Inspect each piece and set with pattern, draw and bow oriented in the same direction as other pieces.
3.04 GLAZING
A. Comply with recommendations of glass manufacturer and manufacturer of sealants and other materials used in glazing, except where more stringent requirements are shown or specified.
B. Exterior glazing shall be performed using pre-shimmed tape, proper setting blocks, and liquid sealants to form a flexible weathertight seal.
C. Force sealants into channel to eliminate voids and to ensure complete "wetting" or bond of sealant.
D. Tool exposed surface of sealants to provide a substantial "wash" away from glass. Install tapes to protrude slightly out of channel, so as to eliminate dirt and moisture pockets.
E. Clean and trim excess glazing materials from glass and stops or frames promptly after installation, and eliminate stains and discolorations.
3.05 PROTECTION AND CLEANING
A. Protect exterior glass from breakage immediately upon installation by attachment of crossed streamers to framing held away from glass. Do not apply markers to surfaces of glass.
B. Remove and replace glass which is broken, chipped, cracked, abraded or damaged in any other way during construction period, including natural causes, accidents and vandalism.
C. Maintain glass in a reasonably clean condition during construction so that it will not be damaged by corrosive action and will not contribute (by wash-off) to deterioration of glazing materials and other surfaces.
D. Wash and polish glass on both faces not more than 4 days prior to Contracting Officer's acceptance of the work in each area. Comply with glass manufacturer's recommendations.
SECTION 08 95 17 WALL VENT REHABILITATION
PART 1 GENERAL
1.01 SUMMARY
A. Provide wall vent rehabilitation as shown and as specified.
1.02 FIELD MEASUREMENTS
A. Take measurements prior to fabrication of screening for each exterior vent.
Allow for trimming and fitting to make field adjustments. Correct defects resulting from failure to take proper measurements.
PART 2 PRODUCTS
2.01 INSECT SCREENING
A. Stainless steel, 18-by-18 mesh, 0.009 in. wire screening.
B. Furnish stainless steel hardware for attachment to existing exterior vents.
PART 3 EXECUTION
3.01 DEBRIS REMOVAL
A. Remove insect nests and other debris from existing exterior and interior wall vents. Wipe clean to remove dirt.
B. Workers shall wear protective gear appropriate for the work to be done.
3.02 SCREEN INSTALLATION
A. Securely fasten insect screening to exterior opening of each vent.
SECTION 09 90 00 PAINTING AND COATING
PART 1 GENERAL
1.01 SUMMARY
A. Provide painting and coating as shown and as specified.
1.02 RELATED SECTIONS
Division 08: For primer for steel doors and frames.
1.03 WORK INCLUDED
A. Work includes painting and finishing items and surfaces throughout the project as designated on Drawings and in Specifications.
1.04 WORK NOT INCLUDED
A. Finished Metal Surfaces: Metal surfaces of anodized aluminum, stainless steel, chromium plate, copper, bronze, and similar finished materials do not require finish painting, except as otherwise indicated.
B. Operating Parts: Do not paint moving parts of operating units, sliding and bearing surfaces, and mechanical and electrical parts, such as valve and damper operators, linkages, sensing devices, and motor and fan shafts, unless otherwise indicated.
C. Labels: Do not paint over code-required labels, such as Underwriters Laboratories and Factory Mutual, or any equipment identification, performance rating, name, or nomenclature plates.
1.05 DEFINITIONS
A. "Paint" as used herein means all coating systems materials, including primers, emulsions, enamels, stains, sealers, and fillers, and other applied materials whether used as prime, intermediate, or finish coats.
B. "DSD" shall mean degree of surface deterioration based on criteria indicated in the MPI Maintenance Repainting Manual. In general the MPI DSD ratings and descriptions are as follows:
1. DSD-0: Sound Surface (may include visual (aesthetic) defects that do not affect film's protective properties).
2. DSD-1: Slightly Deteriorated Surface (may show fading; gloss reduction, slight surface contamination, minor pin holes, scratches, etc.). Minor cosmetic defects (runs, sags, etc.).
3. DSD-2: Moderately Deteriorated Surface (small areas of peeling, flaking, slight cracking, staining, etc.).
4. DSD-3: Severely Deteriorated Surface (heavy peeling, flaking, cracking, checking, scratches, scuffs, abrasion, small holes and gouges).
5. DSD-4: Substrate Damage (repair or replacement of surface required).
1.06 SUBMITTALS
A. Product Data: Submit manufacturer's product data, including label analysis and application instructions for each material specified.
B. Color Charts: Furnish color charts of proposed products for verification of colors.
C. Make submittals in accordance with Division 01.
1.07 DELIVERY, STORAGE, AND PROTECTION
A. Deliver materials in original, unopened packages and containers bearing labels as follows:
1. Name or title of material.
2. Fed. Spec. number, if applicable.
3. Manufacturer's stock number.
4. Manufacturer's name.
5. Contents by volume, for major pigment and vehicle constituents.
6. Thinning instructions.
7. Application instructions.
PART 2 PRODUCTS
2.01 CLEANING MATERIALS
A. Water: Potable.
B. Hot Water: Water heated to a temperature of 140 to 160 deg F.
C. Detergent Solution: Solution prepared by mixing 2 cups of tetrasodium polyphosphate, 1/2 cup of laundry detergent that contains no ammonia, 5 quarts of 5 percent sodium hypochlorite bleach, and 15 quarts of warm water for each 5 gal. of solution required.
D. Mildewcide: Commercial proprietary mildewcide or a job-mixed solution prepared by mixing 1/3 cup of household detergent that contains no ammonia, 1 quart of 5 percent sodium hypochlorite bleach, and 3 quarts of warm water.
E. Abrasives for Ferrous Metal Cleaning: Aluminum oxide paper, emery paper, fine steel wool, steel scrapers, and steel-wire brushes of various sizes.
2.02 PAINT REMOVERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following, or approved equal.
1. ABR Products, Inc.
2. Back to Nature Products Company.
3. Cathedral Stone Products, Inc.
4. Dumond Chemicals, Inc.
5. Hydroclean; Hydrochemical Techniques, Inc.
6. PROSOCO, Inc.
B. Alkaline-Paste Paint Remover: Manufacturer's standard alkaline-paste formulation for removing paint and coatings from masonry, stone, wood, plaster, and metal; and containing no methylene chloride.
2.03 PATCHING MATERIALS
A. Wood Patching Compound: Two-part, epoxy-resin patching system; knife-grade formulation as recommended by manufacturer for type of wood repair indicated, tooling time required for the detail of work, and site conditions.
Compound shall be designed for filling voids in damaged wood materials that have deteriorated due to weathering and decay. Compound shall be capable of filling deep holes and spreading to feather edge.
1. Products: Subject to compliance with requirements, provide one of the following, or approved equal.
a. Abatron, Inc.; LiquidWood with WoodEpox.
b. Advanced Repair Technology, Inc.; Primatrate with Flex-Tec HV.
c. ConServ Epoxy LLC; Flexible Epoxy Consolidant 100 with Flexible
Epoxy Patch 200.
d. Polymeric Systems, Inc.; QuickWood.
e. West System Inc.; West System.
f. Wood Care Systems; ROTFIX with SCULPWOOD.
B. Metal Patching Compound: Two-part, polyester-resin metal patching compound; knife-grade formulation as recommended by manufacturer for type of metal repair indicated, tooling time required for the detail of work, and site conditions. Compound shall be produced for filling metal that has deteriorated due to corrosion. Filler shall be capable of filling deep holes and spreading to feather edge.
C. Cementitious Patching Compounds: Cementitious patching compounds and repair materials specifically manufactured for surface preparation and sanding of cementitious substrates prior to repainting; formulation as recommended by manufacturer for type of cementitious substrate indicated, exposure to weather and traffic, detail of work, and site conditions.
D. Gypsum-Plaster Patching Compound: Finish coat plaster and bonding compound according to ASTM C 842 and manufacturer's written instructions.
2.04 PAINT AND COATINGS
A. Subject to compliance with the specified requirements, provide products by one of the following, or approved equal:
1. Sherwin-Williams Co. (S-W).
2. Benjamin Moore & Co.
3. Coranado Paint.
4. Diamond Vogel Paints.
5. ICI Paints.
6. PPG Architectural Finishes, Inc.
7. Pratt & Lambert Paints.
B. Contractor shall submit a specific list of products it wishes to use if manufactured by a company other than that noted in Painting Schedules.
C. Refer to Drawings and Painting Schedules for finishes and coating systems to be applied to various surfaces throughout project.
D. Contractor shall bear responsibility for compatibility of shop primers and field-applied finish coatings. When shop primer and finish coats are products of different manufacturers, manufacturer of finish coats shall certify in writing to the compatibility of products, or shall recommend a suitable barrier or intermediate tie coat to be applied prior to finish coats. Otherwise, provide recommended undercoat paint produced by same manufacturer as finish coats. Use only thinners approved by paint manufacturer, and within recommended limits.
E. Provide best quality grade of coatings as regularly manufactured by approved paint manufacturers. Materials not displaying manufacturer's identification as a standard, best-grade product will not be acceptable.
PART 3 EXECUTION
3.01 EXAMINATION
A. Examine substrates and conditions for compliance with requirements for maximum moisture content and other conditions affecting performance of the painting work. Comply with paint manufacturer's written instructions for inspection.
B. Maximum Moisture Content of Substrates: Do not begin application of coatings unless moisture content of exposed surface is below the maximum value recommended in writing by paint manufacturer and not greater than the following maximum values when measured with an electronic moisture meter appropriate to the…