Watershed and Wildlife Improvement RFP.doc
DOC document 1 MB Posted
- Attached to
- Forest wide Watershed and Wildlife Improvement
- Solicitation number
- AG-52B1-S-09-0016
About this file
Solicitation for Request for Proposals
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Watershed and Wildlife Improvement Amend1.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
IAS:
ORB: 09-3048
PAGE OF
1 of 101 pages
2. CONTRACT NO.
3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
AG-52B1-S-09-0016
6. SOLICITATION
ISSUE DATE
March 5, 2009
| 7. FOR SOLICITATION INFORMATION CALL: |
| a. NAME |
Contract Admin: Roger Manning Technical Information: Zach Rigg
b. TELEPHONE NUMBER (no collect calls)
(812) 275-5987
(812) 275-5987
8. OFFER DUE DATE/ LOCAL TIME
4/7/009 3:00p.m. e.s.t.
9. ISSUED BY CODE
USDA-FOREST SERVICE
OHIO RIVER BASIN PROCUREMENT CLUSTER
HOOSIER NATIONAL FOREST
811 CONSTITUTION AVE
BEDFORD, IN 47421
10. THIS ACQUISITION IS
FORMCHECKBOX
UNRESTRICTED OR
SET ASIDE 100% FOR:
XX SMALL BUSINESS
FORMCHECKBOX
EMERGING SMALL
HUBZONE SMALL
BUSINESS
BUSINESS
SERVICE DISABLED VETERAN-
8(A)
OWNED SMALL BUSINESS
NAICS: 237990
SIZE STANDARD $31 million
11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED
FORMCHECKBOX
SEE SCHEDULE
12. DISCOUNT
TERMS
FORMCHECKBOX
13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700) 13b. RATING
14. METHOD OF SOLICITATION
RFQ FORMCHECKBOX
IFB FORMCHECKBOX
RFP
15. DELIVER TO CODE
SEE DESCRIPTION OF SUPPLIES/SERVICES
16. ADMINISTERED BY CODE
SEE BLOCK 9
17a. CONTRACTOR/ CAGE CODE FACILITY
OFFEROR CODE
TELEPHONE NO:
FAX NO:
18a. PAYMENT WILL BE MADE BY CODE National Finance Center 13800 Old Gentilly Road
New Orleans, LA 70129
PAYMENT INQUIRY: (800) 421-0323
FORMCHECKBOX
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED FORMCHECKBOX
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
INDEFINITE DELIVERY- INDEFINITE QUANTITY TO PROVIDE WATERSHED AND WILDLIFE IMPROVEMENT SERVICES THROUGHOUT THE HOOSIER NATIONAL FOREST IN ACCORDANCE WITH THE FOLLOWING PAGES.
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (FOR GOVT USE ONLY)
X 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 5.212-3 & 52.212-5 ARE ATTACHED. ADDENDA X ARE FORMCHECKBOX
ARE NOT ATTACHED.
FORMCHECKBOX
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, FAR 42.212-5 IS ATTACHED. ADDENDA FORMCHECKBOX
ARE FORMCHECKBOX
ARE NOT ATTACHED.
| X 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPY TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN. |
| FORMCHECKBOX |
29. AWARD OF CONTRACT: REFERENCE
OFFER DATED . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SINGATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER
31c. DATE SIGNED
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
FORMCHECKBOX
RECEIVED
FORMCHECKBOX
INSPECTED
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER
34. VOUCHER NUMBER
35. AMOUNT VERIFIED CORRECT FOR
36. PAYMENT
FORMCHECKBOX
COMPLETE
FORMCHECKBOX
PARTIAL
FORMCHECKBOX
FINAL
37. CHECK NUMBER
FORMCHECKBOX
PARTIAL FORMCHECKBOX
FINAL
38. S/R ACCOUNT NUMBER
39. S/R VOUCHER NUMBER
40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
42 a. RECEIVED BY (Print)
| 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER |
| 41c. DATE |
42b. RECEIVED AT (Location)
42c. DATE REC’D (YY/MM/DD)
42d. TOTAL CONTAINERS
FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Items.
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(2) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Pub. L. 108-77, 108-78)
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jul 1995), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).
__ (2) 52.219-3, Notice of Total HUBZone Set-Aside (Jan 1999) (15 U.S.C. 657a).
__ (3) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (July 2005) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (4) [Reserved]
XX (5)(i) 52.219-6, Notice of Total Small Business Set-Aside (June 2003) (15 U.S.C. 644).
__ (ii) Alternate I (Oct 1995) of 52.219-6.
__ (iii) Alternate II (Mar 2004) of 52.219-6.
__ (6)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
__ (ii) Alternate I (Oct 1995) of 52.219-7.
__ (iii) Alternate II (Mar 2004) of 52.219-7.
__ (7) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)).
__ (8)(i) 52.219-9, Small Business Subcontracting Plan (July 2005) (15 U.S.C. 637(d)(4).
__ (ii) Alternate I (Oct 2001) of 52.219-9.
__ (iii) Alternate II (Oct 2001) of 52.219-9.
__ (9) 52.219-14, Limitations on Subcontracting (Dec 1996) (15 U.S.C. 637(a)(14)).
__ (10)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Sept 2005) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).
__ (ii) Alternate I (June 2003) of 52.219-23.
__ (11) 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting (Oct 1999) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
__ (12) 52.219-26, Small Disadvantaged Business Participation Program—Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
__ (13) 52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (May 2004).
XX (14) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
XX (15) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2006) (E.O. 13126).
XX (16) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).
XX (17) 52.222-26, Equal Opportunity (Apr 2002) (E.O. 11246).
XX (18) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Dec 2001) (38 U.S.C. 4212).
XX (19) 52.222-36, Affirmative Action for Workers with Disabilities (Jun 1998) (29 U.S.C. 793).
XX (20) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Dec 2001) (38 U.S.C. 4212).
XX (21) 52.222-39, Notification of Employee Rights Concerning Payment of Union Dues or Fees (Dec 2004) (E.O. 13201).
__ (22)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Aug 2000) (42 U.S.C. 6962(c)(3)(A)(ii)).
__ (ii) Alternate I (Aug 2000) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)).
__ (23) 52.225-1, Buy American Act—Supplies (June 2003) (41 U.S.C. 10a-10d).
__ (24)(i) 52.225-3, Buy American Act—Free Trade Agreements—Israeli Trade Act (Jan 2006) (41 U.S.C. 10a-10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, Pub. L. 108-77, 108-78, 108-286).
__ (ii) Alternate I (Jan 2004) of 52.225-3.
__ (iii) Alternate II (Jan 2004) of 52.225-3.
__ (25) 52.225-5, Trade Agreements (Jan 2006) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
__ (26) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2006) (E.o.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (27) 52.225-15, Sanctioned European Union Country End Products (Feb 2000) (E.O. 12849).
__ (28) 52.225-16, Sanctioned European Union Country Services (Feb 2000) (E.O. 12849).
__ (29) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
__ (30) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
XX (31) 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration (Oct 2003) (31 U.S.C. 3332).
__ (32) 52.232-34, Payment by Electronic Funds Transfer—Other than Central Contractor Registration (May 1999) (31 U.S.C. 3332).
__ (33) 52.232-36, Payment by Third Party (May 1999) (31 U.S.C. 3332).
__ (34) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
__ (35)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
__ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
XX (1) 52.222-41, Service Contract Act of 1965, as Amended (July 2005) (41 U.S.C. 351, et seq.).
XX (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Multiple Year and Option Contracts) (May 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Feb 2002) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
__ (5) 52.222-47, SCA Minimum Wages and Fringe Benefits Applicable to Successor Contract Pursuant to Predecessor Contractor Collective Bargaining Agreements (CBA) (May 1989) (41 U.S.C. 351, et seq.).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in paragraphs (i) through (vii) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $500,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(ii) 52.222-26, Equal Opportunity (Apr 2002) (E.O. 11246).
(iii) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Dec 2001) (38 U.S.C. 4212).
(iv) 52.222-36, Affirmative Action for Workers with Disabilities (June 1998) (29 U.S.C. 793).
(v) 52.222-39, Notification of Employee Rights Concerning Payment of Union Dues or Fees (Dec 2004) (E.O. 13201).
(vi) 52.222-41, Service Contract Act of 1965, as Amended (July 2005), flow down required for all subcontracts subject to the Service Contract Act of 1965 (41 U.S.C. 351, et seq.).
(vii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
ADDITIONAL INFORMATION AND INSTRUCTIONS
CONTRACT ADMINISTRATION DATA
(Addendum to Standard Form 18, blocks 5, 16, 17, and 18.)
1. CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individuals: (Offeror to complete this section.)
OFFEROR:
EMAIL:
TIN:
DUNS:
ti
2. GOVERNMENT: ADMINISTRATIVE CONTRACTING OFFICE:
USDA FOREST SERVICE
OHIO RIVER BASIN PROCUREMENT CLUSTER
c/o HOOSIER NATIONAL FOREST
ATTN: MARK CORSE
811 CONSTITUTION AVE
BEDFORD, IN 47421
(812) 276-4729
3.
CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor under this contract will be made in accordance with Electronic Funds Transfer (EFT) methods referenced in this solicitation. All required information must be in the Central Contractor Registration (CCR) at www.ccr.gov. To check on payments once a contract has been awarded, contact the Miscellaneous Payments Section of the National Finance Center at 1-800-421-0323.
4.
INVOICES: Invoices shall be submitted in arrears, no advance payments will be authorized. Unless otherwise noted on the individual Task Orders, contractors shall submit invoices for payment as follows:
A. If the work performance period cited in the individual Task Order is 30 days or less the contractor shall submit an invoice to the government at the end of the performance period. No partial payments are authorized.
B. If the work performance period cited in the individual Task Order is greater than 30 days partial payments may be authorized on a monthly basis and upon completion of the ordered work.
C. GOVERNMENT INVOICE ADDRESS: All invoices from the contractor shall be mailed to the following address:
USDA FOREST SERVICE
HOOSIER NATIONAL FOREST
ATTN: ZACH RIGG
811 CONSTITUTION AVE
BEDFORD, IN 47421
D. In accordance with the Prompt Payment Act, payment will be due 30 days after:
a. Receipt of services; or
b. Receipt of proper invoice.
Whichever is later.
E. If payment is not received with 5 working days following the due date, notify the Contracting Officer’s Representative or Contracting Officer.
F. Contractors are encouraged to Contact PAYMENT INQUIRY at the National Finance Center (800) 421-0323 concerning status of past due invoices.
G. Contractors are encouraged to subscribe to the US Treasury website for Payment Advice Internet Delivery (PAID) at https://fmsapps.treas.gov/paid/ This service is free and provides vendors with advance notification of payments processed through EFT.
5. VETS-100 PROGRAM
Offerors should address questions concerning VETS-100 reporting and reporting requirements to the Office of Veterans Employment and Training Services offices at the following address:
U. S. Department of Labor
VETS-100 Reporting
4200 Forbes Blvd., Suite 202
Lanham, MD 20703
Telephone: (301) 306-6752
Website: www.vets100.cudenver.edu
Reporting Questions: HelpDesk@vets100.com
Reporting Verification: Verify@vets100.com
ADDENDUM TO 52-212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS
Vendors shall submit the following information with their offer to allow the Forest Service to evaluate proposals for award. Failure to provide the requested information may result in your offer not being considered for award.:
· A list of projects over the past three years you have performed that are similar to this project in scope and size. Please provide the name of the owner, address, telephone number and contact point for the project.
(This Information will be used in the evaluation under the past performance section)
· Provide brief resumes for the following personnel: Project Superintendent, Equipment Operators (This Information will be used in the evaluation under the technical capability section)
· Provide evidence of the understanding, appropriateness, and soundess of accomplishing the work, including understanding of objectives, demonstrated familiarity with forest area and resource base, thoroughness and appropriateness of approach and methods, and reasonableness of level of effort
(This Information will be used in the evaluation under the technical capability section)
· Provide a list of the equipment you intend to use on this project including, type of equipment, horse-power, size, model, year, accessories.
(This Information will be used in the evaluation under the equipment section)
· Quality Control Plan that includes the process you intent to use to ensure work is to the AQL. (This Information will be used in the evaluation under the technical capability section)
· Safety Plan – General information on how you will protect employees and the public in general. (This Information will be used in the evaluation under the technical capability section)
· Certifications/Representations required in FAR 52-212-3 Offeror Representations and Certifications - Commercial Items.
· Although the FS provides the incentives/disincentives for this project it will consider suggestions for additional or replacement incentives/disincentives to improve the quality and cost effectiveness of the work. If you have suggestions, you should submit them as alternatives included in your offer.
The award is being considered using a best value approach. Failure to provide this requested information may result in your offer not being considered for award.
PART I—THE SCHEDULE
SECTION B -SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
BROWNSTOWN RANGER DISTRICT – BASE PERIOD
Line Item No.
(CLIN)
| Title |
| Description |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
Price
| B001 |
| EROSION CONTROL |
| PROVIDE ALL LABOR AND EQUIPMENT TO PROVIDE WATERSHED SERVICES AS DIRECTED. |
| B001.1 |
| Seeding and Mulching |
| Contractor will prepare a seedbed to ensure good soil to seed contact. Seed will be provided by Gov't. Seed may be broadcast or drilled. Straw mulch will be evenly applied at a rate of 1 ton/acre and adequately crimped to bind to soil. Mulch will be free of weeds and exotic plants. |
| 5 |
| Acres |
| $____________ |
| $_____________ |
| B001.1a |
| Hydro Seeding |
| Contractor will prepare a seedbed to ensure good soil to seed contact. Seed will be provided by Gov't. This item is to be used for critical area plantings and to restore steep unvegetated grades. Fertilizer shall be included at a rate of 60-60-60 lb/acre N-P-K. |
| 1 |
| Acre |
| $____________ |
| $____________ |
| B001.1b |
| No-till Drill Seeding |
| Drill must have a native seed agitator or equivalent mechanism to evenly apply native grass seed. Drill must have capability to adjust seed rate from 7-100 lbs. seed/acre. Seed furrows must have a row spacing of less than 12". When possible seeding will occur on contours. Conditions may vary from bare mineral soil to heavy growing herbaceous vegetation. |
| 25 |
| Acres |
| $____________ |
| $____________ |
| B001.2 |
| Earthfill |
| Place and compact earthen material. Borrow area will not exceed 300 feet from where it is placed. Earthfill must have enough moisture to form a ball when squeezed in hand prior to compaction. |
| 100 |
| Cubic Yard |
| $____________ |
| $_____________ |
| B001.3 |
| Roller Compacted Earthfill |
| Place and compact earthen material. Borrow area will not exceed 300 feet from where it is placed. Earthfill must have enough moisture to form a ball when squeezed in hand prior to compaction. Compaction will be achieved by no less than 2 passes with a sheep's-foot roller, liquid filled, perpendicular to the flow line of runoff water. Lifts will not exceed 12 inches before they are compacted. |
| 50 |
| Cubic Yard |
| $____________ |
| $_____________ |
| B001.4 |
| Excavation |
| Remove material from designated location. Material is primarily natural earth, but may include log jams, woody debris, and trash. |
| 50 |
| Cubic Yard |
| $____________ |
| $_____________ |
| B001.5 |
| Fabric Check Dams |
| Excavate 2-3 foot deep channel perpendicular to erosional gullies. Install 6-8 ounce/square yard, non-woven geotextile on the upstream side of ditch. Fabric should be long enough to touch the bottom of the excavated ditch and overlap the ground surface by 6 inches. Trench backfill will be designated as earthfill or rip rap placement. |
| 50 |
| Linear Foot |
| $____________ |
| $_____________ |
| B001.6 |
| Aggregate (INDOT #1’s) |
| Provide and Place Aggregate meeting INDOT #1 limestone aggregate at locations and to the depth requested in the Task Order. |
| 22 |
| Ton |
| $____________ |
| $_______________ |
| B001.7 |
| Aggregate (INDOT #2’s) |
| Provide and Place Aggregate meeting INDOT #2 limestone aggregate at locations and to the depth requested in the Task Order. |
| 22 |
| Ton |
| $____________ |
| $_______________ |
| B001.8 |
| Aggregate (INDOT #4’s) |
| Provide and Place Aggregate meeting INDOT #4 limestone aggregate at locations and to the depth requested in the Task Order. |
| 22 |
| Ton |
| $____________ |
| $_______________ |
| B001.9 |
| Riprap (INDOT Type A) |
| Provide and Place Riprap, INDOT Class A limestone at locations as requested in the TO. Rock to meet INDOT specification. |
| 44 |
| Ton |
| $____________ |
| $_______________ |
| B001.10 |
| Mobilization |
| Mobilize equipment and materials to site and between sites if required by task order. |
| TBD |
| TBD |
| TBD |
| TBD |
| B001.11 |
| Silt Fence |
| Install silt fence to reduce sediment entering watercourses. |
| 25 |
| Linear foot |
| $____________ |
| $_______________ |
| B001.12 |
| Geotextile Barrier |
| Supply and install 6-8 ounce/square yard, non-woven geotextile fabric. A minimum of 12 inches of fabric will be keyed into existing ground with a 12 in trench on the upstream side and then backfilled to secure it. |
| 20 |
| Sq Yard |
| $____________ |
| $_______________ |
| B002 |
| PIPE INSTALLATION |
| PROVIDE PIPE/CULVERT INSTALLATION AND REPAIR SERVICE AS DIRECTED |
| B002.1 |
| Culvert and Pipe Installation |
| A smooth bed, sloping to remove water from upstream, will be prepared to lay pipe in. One to two feet of fill, unless otherwise specified, will be placed over pipe and compacted with a wheeled vehicle perpendicular to water flow. |
| 25 |
| Linear Foot |
| $____________ |
| $_______________ |
| B002.2 |
| Culvert and Pipe |
| Culvert Pipe will be purchased and mobilized to the site by contractor. Pipe size will vary from 4 to 36 inches. Pipe material will vary depending on application. This will also include a variety of fittings and pipe accessories that will be specified in Task Order. |
| TBD |
| TBD |
| TBD |
| TBD |
| B002.3 |
| Pipe and Drain Component Installation and Repair |
| Contractor will provide specified components for repair and installation. This line item also includes all installation as specified in task order. Components are not limited to, but include: grating, valves, control structures, outlet protection, fittings, and collars. |
| TBD |
| TBD |
| TBD |
| TBD |
| B003 |
| Ground and Surface Water Protection |
| PROVIDE WATER PROTECTION SERVICES AS DIRECTED |
| B003.1 |
| Dump Site Cleanup |
| Removal and proper disposal of trash. |
| TBD |
| TBD |
| TBD |
| TBD |
| B003.2 |
| Cap Wells |
| A rebar reinforced concrete cap of a minimum 3.75 inch thickness will be installed over well opening |
| 25 |
| Ea |
| $____________ |
| $_______________ |
| B003.3 |
| Mobilization of Fill to Wells |
| Aggregate and topsoil from off site will be mobilized to site in a manner that does not disturb vegetation or heritage resources |
| 5 |
| Miles |
| $____________ |
| $_______________ |
| B003.4 |
| Well Filling |
| Wells will be filled within the upper 2-3 feet of surrounding surface with aggregate. Topsoil will be used to complete fill. At lest 6 inches of additional topsoil shall be placed to allow for settling. (Aggregate is covered in items 10 or 11.) |
| 8 |
| Each |
| $____________ |
| $_______________ |
| B004 |
| Erosion Prevention |
| INSTALL GOVERNMENT PROVIDED GATES AND POSTS, AS DIRECTED |
| B004.1 |
| Gate Installation |
| Install Forest Service gates at designated locations. Gates and associated posts and signs will provided by the Gov't. |
| 2 |
| Ea |
| $____________ |
| $_______________ |
| B004.2 |
| Barrier Post Installation |
| Install barrier posts to a depth ranging from 2 to 4 feet as specified by COTR. Posts will be treated pine or weather resistant species (red cedar or locust), 5 inch diameter and 8 feet in length. Posts may be secured with concrete or hand tamped in place. |
| 5 |
| Ea |
| $____________ |
| $_______________ |
| B005 |
| Wildlife Management |
| PROVIDE WILDLIFE MANAGEMENT SERVICES AS DIRECTED |
| B005.1 |
| Tractor and Implement Operation - Towable |
| Task is designed to account for standard operation of implements with a range of 80-120 horsepower. Desired implement width will be between 4' and 12' wide, however others outside this range may be acceptable for certain task orders. Specific implements such as: discs, chain harrows, cultipackers, shank rippers, or others may be specified for a task order. Other task orders may describe a desired condition, leaving methodology up to contractor. |
| 25 |
| Acres |
| $____________ |
| $_______________ |
| B005.2 |
| Tractor and Implement Operation – Power take off |
| Task is designed to account for standard operation of implements with a range of 80-120 horsepower. Desired implement width will be between 4' and 12' wide, however others outside this range may be acceptable for certain task orders. Specific implements such as: rotary tillers, rotary brush mowers, or others may be specified for a task order. Other task orders may describe a desired condition, leaving methodology up to contractor. |
| 25 |
| Acres |
| $____________ |
| $_______________ |
| B005.3 |
| Clearing: Early successional |
| Above ground vegetation will be felled/removed without below ground disturbance. Task order may specify varying height requirements from 3" to 36" of vegetation to remain. This line item, when prescribed for wildlife habitat improvement, may specify species, designate particular vegetation, or describe fractions of areas to be treated in a task order. Vegetation in this task order will be less than 3" diameter breast height. Operations to occur when Ground conditions are suitable to prevent rutting. |
| 10 |
| Acres |
| $____________ |
| $_______________ |
| B005.3.a |
| Clearing: Mid successional |
| Above ground vegetation will be felled/removed without below ground disturbance. Task order may specify varying height requirements from 3" to 36" of vegetation to remain. This line item, when prescribed for wildlife habitat improvement, may specify species, designate particular vegetation, or describe fractions of areas to be treated in a task order.. Vegetation in this task order will be a range of 3"-9" diameter breast height. Operations to occur when Ground conditions are suitable to prevent rutting. |
| 10 |
| Acres |
| $____________ |
| $_______________ |
| B005.3.b |
| Clearing: Forest |
| Above ground vegetation will be felled/removed without below ground disturbance. Task order may specify varying height requirements from 3" to 36" of vegetation to remain. This line item, when prescribed for wildlife habitat improvement, may specify species, designate particular vegetation, or describe fractions of areas to be treated in a task order. Vegetation in this task order will be greater than 9" diameter breast height. Operations to occur when Ground conditions are suitable to prevent rutting. |
| 10 |
| Acres |
| $____________ |
| $_______________ |
| B005.3.c |
| Clearing and Grubbing |
| Removal of all above ground biomass and roots greater than 3" diameter. Task order will specify pile locations within 150' of clearing and grubbing. |
| 5 |
| Acres |
| $____________ |
| $_______________ |
| B005.3.d |
| Snag Creation |
| Girdle trees at specified tree height to ensure plant circulation is disrupted. Girdling may be required at heights ranging from 3 to 60'. |
| 5 |
| Each |
| $____________ |
| $_______________ |
| B005.3.e |
| Habitat Piles |
| Loosely pile or mound woody vegetation at a minimum height of 3'. Piles shall be 5-10' in diameter. Piles should not contain more than 20% soil. This line item will accompany a clearing practice. |
| 20 |
| Each |
| $____________ |
| $_______________ |
| B006 |
| Pest Infestation Sanitation |
| PROVIDE CUTTING, GRINDING, CHIPPING SERVICE AS DIRECTED |
| B006.1 |
| Pest Infestation Sanitation - Small |
| Trees identified by the Government by a paint mark will be cut down leaving a one foot or less stump height, moved to a central location and ground or chipped. The size of the chip must be less than one inch on any side. Any limbs that fall off in the process of moving to the final processing location must be picked up. Chips will be left on site. Trees will be less than six inches diameter breast height (DBH) DBH is measured at 4.5 feet above ground on the tree |
| 100 |
| Each |
| $____________ |
| $_______________ |
| B006.1.a |
| Pest Infestation Sanitation - Medium |
| Trees identified by the Government by a paint mark will be cut down leaving a one foot or less stump height, moved to a central location and ground or chipped. The size of the chip must be less than one inch on any side. Any limbs that fall off in the process of moving to the final processing location must be picked up. Chips will be left on site. Trees will be six inches to less than 12 inches diameter breast height (DBH) DBH is measured at 4.5 feet above ground on the tree |
| 100 |
| Each |
| $____________ |
| $_______________ |
| B006.1.b |
| Pest Infestation Sanitation - Large |
| Trees identified by the Government by a paint mark will be cut down leaving a one foot or less stump height, moved to a central location and ground or chipped. The size of the chip must be less than one inch on any side. Any limbs that fall off in the process of moving to the final processing location must be picked up. Chips will be left on site. Trees will be 12 inches and greater diameter breast height (DBH) DBH is measured at 4.5 feet above ground on the tree |
| 100 |
| Each |
| $____________ |
| $_______________ |
PART I—THE SCHEDULE
SECTION B -SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
BROWNSTOWN RANGER DISTRICT – OPTION PERIOD ONE
Line Item No.
(CLIN)
| Title |
| Description |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
Price
| B101 |
| EROSION CONTROL |
| PROVIDE ALL LABOR AND EQUIPMENT TO PROVIDE WATERSHED SERVICES AS DIRECTED. |
| B101.1 |
| Seeding and Mulching |
| Contractor will prepare a seedbed to ensure good soil to seed contact. Seed will be provided by Gov't. Seed may be broadcast or drilled. Straw mulch will be evenly applied at a rate of 1 ton/acre and adequately crimped to bind to soil. Mulch will be free of weeds and exotic plants. |
| 5 |
| Acres |
| $____________ |
| $_____________ |
| B101.1a |
| Hydro Seeding |
| Contractor will prepare a seedbed to ensure good soil to seed contact. Seed will be provided by Gov't. This item is to be used for critical area plantings and to restore steep unvegetated grades. Fertilizer shall be included at a rate of 60-60-60 lb/acre N-P-K. |
| 1 |
| Acre |
| $____________ |
| $____________ |
| B101.1b |
| No-till Drill Seeding |
| Drill must have a native seed agitator or equivalent mechanism to evenly apply native grass seed. Drill must have capability to adjust seed rate from 7-100 lbs. seed/acre. Seed furrows must have a row spacing of less than 12". When possible seeding will occur on contours. Conditions may vary from bare mineral soil to heavy growing herbaceous vegetation. |
| 25 |
| Acres |
| $____________ |
| $____________ |
| B101.2 |
| Earthfill |
| Place and compact earthen material. Borrow area will not exceed 300 feet from where it is placed. Earthfill must have enough moisture to form a ball when squeezed in hand prior to compaction. |
| 100 |
| Cubic Yard |
| $____________ |
| $_____________ |
| B101.3 |
| Roller Compacted Earthfill |
| Place and compact earthen material. Borrow area will not exceed 300 feet from where it is placed. Earthfill must have enough moisture to form a ball when squeezed in hand prior to compaction. Compaction will be achieved by no less than 2 passes with a sheep's-foot roller, liquid filled, perpendicular to the flow line of runoff water. Lifts will not exceed 12 inches before they are compacted. |
| 50 |
| Cubic Yard |
| $____________ |
| $_____________ |
| B101.4 |
| Excavation |
| Remove material from designated location. Material is primarily natural earth, but may include log jams, woody debris, and trash. |
| 50 |
| Cubic Yard |
| $____________ |
| $_____________ |
| B101.5 |
| Fabric Check Dams |
| Excavate 2-3 foot deep channel perpendicular to erosional gullies. Install 6-8 ounce/square yard, non-woven geotextile on the upstream side of ditch. Fabric should be long enough to touch the bottom of the excavated ditch and overlap the ground surface by 6 inches. Trench backfill will be designated as earthfill or rip rap placement. |
| 50 |
| Linear Foot |
| $____________ |
| $_____________ |
| B101.6 |
| Aggregate (INDOT #1’s) |
| Provide and Place Aggregate meeting INDOT #1 limestone aggregate at locations and to the depth requested in the Task Order. |
| 22 |
| Ton |
| $____________ |
| $_______________ |
| B101.7 |
| Aggregate (INDOT #2’s) |
| Provide and Place Aggregate meeting INDOT #2 limestone aggregate at locations and to the depth requested in the Task Order. |
| 22 |
| Ton |
| $____________ |
| $_______________ |
| B101.8 |
| Aggregate (INDOT #4’s) |
| Provide and Place Aggregate meeting INDOT #4 limestone aggregate at locations and to the depth requested in the Task Order. |
| 22 |
| Ton |
| $____________ |
| $_______________ |
| B101.9 |
| Riprap (INDOT Type A) |
| Provide and Place Riprap, INDOT Class A limestone at locations as requested in the TO. Rock to meet INDOT specification. |
| 44 |
| Ton |
| $____________ |
| $_______________ |
| B101.10 |
| Mobilization |
| Mobilize equipment and materials to site and between sites if required by task order. |
| TBD |
| TBD |
| TBD |
| TBD |
| B101.11 |
| Silt Fence |
| Install silt fence to reduce sediment entering watercourses. |
| 25 |
| Linear foot |
| $____________ |
| $_______________ |
| B101.12 |
| Geotextile Barrier |
| Supply and install 6-8 ounce/square yard, non-woven geotextile fabric. A minimum of 12 inches of fabric will be keyed into existing ground with a 12 in trench on the upstream side and then backfilled to secure it. |
| 20 |
| Sq Yard |
| $____________ |
| $_______________ |
| B102 |
| PIPE INSTALLATION |
| PROVIDE PIPE/CULVERT INSTALLATION AND REPAIR SERVICE AS DIRECTED |
| B102.1 |
| Culvert and Pipe Installation |
| A smooth bed, sloping to remove water from upstream, will be prepared to lay pipe in. One to two feet of fill, unless otherwise specified, will be placed over pipe and compacted with a wheeled vehicle perpendicular to water flow. |
| 25 |
| Linear Foot |
| $____________ |
| $_______________ |
| B102.2 |
| Culvert and Pipe |
| Culvert Pipe will be purchased and mobilized to the site by contractor. Pipe size will vary from 4 to 36 inches. Pipe material will vary depending on application. This will also include a variety of fittings and pipe accessories that will be specified in Task Order. |
| TBD |
| TBD |
| TBD |
| TBD |
| B102.3 |
| Pipe and Drain Component Installation and Repair |
| Contractor will provide specified components for repair and installation. This line item also includes all installation as specified in task order. Components are not limited to, but include: grating, valves, control structures, outlet protection, fittings, and collars. |
| TBD |
| TBD |
| TBD |
| TBD |
| B103 |
| Ground and Surface Water Protection |
| PROVIDE WATER PROTECTION SERVICES AS DIRECTED |
| B103.1 |
| Dump Site Cleanup |
| Removal and proper disposal of trash. |
| TBD |
| TBD |
| TBD |
| TBD |
| B103.2 |
| Cap Wells |
| A rebar reinforced concrete cap of a minimum 3.75 inch thickness will be installed over well opening |
| 25 |
| Ea |
| $____________ |
| $_______________ |
| B103.3 |
| Mobilization of Fill to Wells |
| Aggregate and topsoil from off site will be mobilized to site in a manner that does not disturb vegetation or heritage resources |
| 5 |
| Miles |
| $____________ |
| $_______________ |
| B103.4 |
| Well Filling |
| Wells will be filled within the upper 2-3 feet of surrounding surface with aggregate. Topsoil will be used to complete fill. At lest 6 inches of additional topsoil shall be placed to allow for settling. (Aggregate is covered in items 10 or 11.) |
| 8 |
| Each |
| $____________ |
| $_______________ |
| B104 |
| Erosion Prevention |
| INSTALL GOVERNMENT PROVIDED GATES AND POSTS, AS DIRECTED |
| B104.1 |
| Gate Installation |
| Install Forest Service gates at designated locations. Gates and associated posts and signs will provided by the Gov't. |
| 2 |
| Ea |
| $____________ |
| $_______________ |
| B104.2 |
| Barrier Post Installation |
| Install barrier posts to a depth ranging from 2 to 4 feet as specified by COTR. Posts will be treated pine or weather resistant species (red cedar or locust), 5 inch diameter and 8 feet in length. Posts may be secured with concrete or hand tamped in place. |
| 5 |
| Ea |
| $____________ |
| $_______________ |
| B105 |
| Wildlife Management |
| PROVIDE WILDLIFE MANAGEMENT SERVICES AS DIRECTED |
| B105.1 |
| Tractor and Implement Operation - Towable |
| Task is designed to account for standard operation of implements with a range of 80-120 horsepower. Desired implement width will be between 4' and 12' wide, however others outside this range may be acceptable for certain task orders. Specific implements such as: discs, chain harrows, cultipackers, shank rippers, or others may be specified for a task order. Other task orders may describe a desired condition, leaving methodology up to contractor. |
| 25 |
| Acres |
| $____________ |
| $_______________ |
| B105.2 |
| Tractor and Implement Operation – Power take off |
| Task is designed to account for standard operation of implements with a range of 80-120 horsepower. Desired implement width will be between 4' and 12' wide, however others outside this range may be acceptable for certain task orders. Specific implements such as: rotary tillers, rotary brush mowers, or others may be specified for a task order. Other task orders may describe a desired condition, leaving methodology up to contractor. |
| 25 |
| Acres |
| $____________ |
| $_______________ |
| B105.3 |
| Clearing: Early successional |
| Above ground vegetation will be felled/removed without below ground disturbance. Task order may specify varying height requirements from 3" to 36" of vegetation to remain. This line item, when prescribed for wildlife habitat improvement, may specify species, designate particular vegetation, or describe fractions of areas to be treated in a task order. Vegetation in this task order will be less than 3" diameter breast height. Operations to occur when Ground conditions are suitable to prevent rutting. |
| 10 |
| Acres |
| $____________ |
| $_______________ |
| B105.3.a |
| Clearing: Mid successional |
| Above ground vegetation will be felled/removed without below ground disturbance. Task order may specify varying height requirements from 3" to 36" of vegetation to remain. This line item, when prescribed for wildlife habitat improvement, may specify species, designate particular vegetation, or describe fractions of areas to be treated in a task order.. Vegetation in this task order will be a range of 3"-9" diameter breast height. Operations to occur when Ground conditions are suitable to prevent rutting. |
| 10 |
| Acres |
| $____________ |
| $_______________ |
| B105.3.b |
| Clearing: Forest |
| Above ground vegetation will be felled/removed without below ground disturbance. Task order may specify varying height requirements from 3" to 36" of vegetation to remain. This line item, when prescribed for wildlife habitat improvement, may specify species, designate particular vegetation, or describe fractions of areas to be treated in a task order. Vegetation in this task order will be greater than 9" diameter breast height. Operations to occur when Ground conditions are suitable to prevent rutting. |
| 10 |
| Acres |
| $____________ |
| $_______________ |
| B105.3.c |
| Clearing and Grubbing |
| Removal of all above ground biomass and roots greater than 3" diameter. Task order will specify pile locations within 150' of clearing and grubbing. |
| 5 |
| Acres |
| $____________ |
| $_______________ |
| B105.3.d |
| Snag Creation |
| Girdle trees at specified tree height to ensure plant circulation is disrupted. Girdling may be required at heights ranging from 3 to 60'. |
| 5 |
| Each |
| $____________ |
| $_______________ |
| B105.3.e |
| Habitat Piles |
| Loosely pile or mound woody vegetation at a minimum height of 3'. Piles shall be 5-10' in diameter. Piles should not contain more than 20% soil. This line item will accompany a clearing practice. |
| 20 |
| Each |
| $____________ |
| $_______________ |
| B106 |
| Pest Infestation Sanitation |
| PROVIDE CUTTING, GRINDING, CHIPPING SERVICE AS DIRECTED |
| B106.1 |
| Pest Infestation Sanitation - Small |
| Trees identified by the Government by a paint mark will be cut down leaving a one foot or less stump height, moved to a central location and ground or chipped. The size of the chip must be less than one inch on any side. Any limbs that fall off in the process of moving to the final processing location must be picked up. Chips will be left on site. Trees will be less than six inches diameter breast height (DBH) DBH is measured at 4.5 feet above ground on the tree |
| 100 |
| Each |
| $____________ |
| $_______________ |
| B106.1.a |
| Pest Infestation Sanitation - Medium |
| Trees identified by the Government by a paint mark will be cut down leaving a one foot or less stump height, moved to a central location and ground or chipped. The size of the chip must be less than one inch on any side. Any limbs that fall off in the process of moving to the final processing location must be picked up. Chips will be left on site. Trees will be six inches to less than 12 inches diameter breast height (DBH) DBH is measured at 4.5 feet above ground on the tree |
| 100 |
| Each |
| $____________ |
| $_______________ |
| B106.1.b |
| Pest Infestation Sanitation - Large |
| Trees identified by the Government by a paint mark will be cut down leaving a one foot or less stump height, moved to a central location and ground or chipped. The size of the chip must be less than one inch on any side. Any limbs that fall off in the process of moving to the final processing location must be picked up. Chips will be left on site. Trees will be 12 inches and greater diameter breast height (DBH) DBH is measured at 4.5 feet above ground on the tree |
| 100 |
| Each |
| $____________ |
| $_______________ |
SCHEDULE OF ITEMS
BROWNSTOWN RANGER DISTRICT – OPTION PERIOD TWO
Line Item No.
(CLIN)
| Title |
| Description |
| Estimated Annual Quantity |
| Unit |
| Unit |
Price Total
Price
| B201 |
| EROSION CONTROL |
| PROVIDE ALL LABOR AND EQUIPMENT TO PROVIDE WATERSHED SERVICES AS DIRECTED. |
| B201.1 |
| Seeding and Mulching |
| Contractor will prepare a seedbed to ensure good soil to seed contact. Seed will be provided by Gov't. Seed may be broadcast or drilled. Straw mulch will be evenly applied at a rate of 1 ton/acre and adequately crimped to bind to soil. Mulch will be free of weeds and exotic plants. |
| 5 |
| Acres |
| $____________ |
| $_____________ |
| B201.1a |
| Hydro Seeding |
| Contractor will prepare a seedbed to ensure good soil to seed contact. Seed will be provided by Gov't. This item is to be used for critical area plantings and to restore steep unvegetated grades. Fertilizer shall be included at a rate of 60-60-60 lb/acre N-P-K. |
| 1 |
| Acre |
| $____________ |
| $____________ |
| B201.1b |
| No-till Drill Seeding |
| Drill must have a native seed agitator or equivalent mechanism to evenly apply native grass seed. Drill must have capability to adjust seed rate from 7-100 lbs. seed/acre. Seed furrows must have a row spacing of less than 12". When possible seeding will occur on contours. Conditions may vary from bare mineral soil to heavy growing herbaceous vegetation. |
| 25 |
| Acres |
| $____________ |
| $____________ |
| B201.2 |
| Earthfill |
| Place and compact earthen material. Borrow area will not exceed 300 feet from where it is placed. Earthfill must have enough moisture to form a ball when squeezed in hand prior to compaction. |
| 100 |
| Cubic Yard |
| $____________ |
| $_____________ |
| B201.3 |
| Roller Compacted Earthfill |
| Place and compact earthen material. Borrow area will not exceed 300 feet from where it is placed. Earthfill must have enough moisture to form a ball when squeezed in hand prior to compaction. Compaction will be achieved by no less than 2 passes with a sheep's-foot roller, liquid filled, perpendicular to the flow line of runoff water. Lifts will not exceed 12 inches before they are compacted. |
| 50 |
| Cubic Yard |
| $____________ |
| $_____________ |
| B201.4 |
| Excavation |
| Remove material from designated location. Material is primarily natural earth, but may include log jams, woody debris, and trash. |
| 50 |
| Cubic Yard |
| $____________ |
| $_____________ |
| B201.5 |
| Fabric Check Dams |
| Excavate 2-3 foot deep channel perpendicular to erosional gullies. Install 6-8 ounce/square yard, non-woven geotextile on the upstream side of ditch. Fabric should be long enough to touch the bottom of the excavated ditch and overlap the ground surface by 6 inches. Trench backfill will be designated as earthfill or rip rap placement. |
| 50 |
| Linear Foot |
| $____________ |
| $_____________ |
| B201.6 |
| Aggregate (INDOT #1’s) |
| Provide and Place Aggregate meeting INDOT #1 limestone aggregate at locations and to the depth requested in the Task Order. |
| 22 |
| Ton |
| $____________ |
| $_______________ |
| B201.7 |
| Aggregate (INDOT #2’s) |
| Provide and Place Aggregate meeting INDOT #2 limestone aggregate at locations and to the depth requested in the Task Order. |
| 22 |
| Ton |
| $____________ |
| $_______________ |
| B201.8 |
| Aggregate (INDOT #4’s) |
| Provide and Place Aggregate meeting INDOT #4 limestone aggregate at locations and to the depth requested in the Task Order. |
| 22 |
| Ton |
| $____________ |
| $_______________ |
| B201.9 |
| Riprap (INDOT Type A) |
| Provide and Place Riprap, INDOT Class A limestone at locations as requested in the TO. Rock to meet INDOT specification. |
| 44 |
| Ton |
| $____________ |
| $_______________ |
| B201.10 |
| Mobilization |
| Mobilize equipment and materials to site and between sites if required by task order. |
| TBD |
| TBD |
| TBD |
| TBD |
| B201.11 |
| Silt Fence |
| Install silt fence to reduce sediment entering watercourses. |
| 25 |
| Linear foot |
| $____________ |
| $_______________ |
| B201.12 |
| Geotextile Barrier |
| Supply and install 6-8 ounce/square yard, non-woven geotextile fabric. A minimum of 12 inches of fabric will be keyed into existing ground with a 12 in trench on the upstream side and then backfilled to secure it. |
| 20 |
| Sq Yard |
| $____________ |
| $_______________ |
| B202 |
| PIPE INSTALLATION |
| PROVIDE PIPE/CULVERT INSTALLATION AND REPAIR SERVICE AS DIRECTED |
| B202.1 |
| Culvert and Pipe Installation |
| A smooth bed, sloping to remove water from upstream, will be prepared to lay pipe in. One to two feet of fill, unless otherwise specified, will be placed over pipe and compacted with a wheeled vehicle perpendicular to water flow. |
| 25 |
| Linear Foot |
| $____________ |
| $_______________ |
| B202.2 |
| Culvert and Pipe |
| Culvert Pipe will be purchased and mobilized to the site by contractor. Pipe size will vary from 4 to 36 inches. Pipe material will vary depending on application. This will also include a variety of fittings and pipe accessories that will be specified in Task Order. |
| TBD |
| TBD |
| TBD |
| TBD |
| B202.3 |
| Pipe and Drain Component Installation and Repair |
| Contractor will provide specified components for repair and installation. This line item also includes all installation as specified in task order. Components are not limited to, but include: grating, valves, control structures, outlet protection, fittings, and collars. |
| TBD |
| TBD |
| TBD |
| TBD |
| B203 |
| Ground and Surface Water Protection |
| PROVIDE WATER PROTECTION SERVICES AS DIRECTED |
| B203.1 |
| Dump Site Cleanup |
| Removal and proper disposal of trash. |
| TBD |
| TBD |
| TBD |
| TBD |
| B203.2 |
| Cap Wells |
| A rebar reinforced concrete cap of a minimum 3.75 inch thickness will be installed over well opening |
| 25 |
| Ea |
| $____________ |
| $_______________ |
| B203.3 |
| Mobilization of Fill to Wells |
| Aggregate and topsoil from off site will be mobilized to site in a manner that does not disturb vegetation or heritage resources |
| 5 |
| Miles |
| $____________ |
| $_______________ |
| B203.4 |
| Well Filling |
| Wells will be filled within the upper 2-3 feet of surrounding surface with aggregate. Topsoil will be used to complete fill. At lest 6 inches of additional topsoil shall be placed to allow for settling. (Aggregate is covered in items 10 or 11.) |
| 8 |
| Each |
| $____________ |
| $_______________ |
| B204 |
| Erosion Prevention |
| INSTALL GOVERNMENT PROVIDED GATES AND POSTS, AS DIRECTED |
| B204.1 |
| Gate Installation |
| Install Forest Service gates at designated locations. Gates and associated posts and signs will provided by the Gov't. |
| 2 |
| Ea |
| $____________ |
| $_______________ |
| B204.2 |
| Barrier Post Installation |
| Install barrier posts to a depth ranging from 2 to 4 feet as specified by COTR. Posts will be treated pine or weather resistant species (red cedar or locust), 5 inch diameter and 8 feet in length. Posts may be secured with concrete or hand tamped in place. |
| 5 |
| Ea |
| $____________ |
| $_______________ |
| B205 |
| Wildlife Management |
| PROVIDE WILDLIFE MANAGEMENT SERVICES AS DIRECTED |
| B205.1 |
| Tractor and Implement Operation - Towable |
| Task is designed to account for standard operation of implements with a range of 80-120 horsepower. Desired implement width will be between 4' and 12' wide, however others outside this range may be acceptable for certain task orders. Specific implements such as: discs, chain harrows, cultipackers, shank rippers, or others may be specified for a task order. Other task orders may describe a desired condition, leaving methodology up to contractor. |
| 25 |
| Acres |
| $____________ |
| $_______________ |
| B205.2 |
| Tractor and Implement Operation – Power take off |
| Task is designed to account for standard operation of implements with a range of 80-120 horsepower. Desired implement width will be between 4' and 12' wide, however others outside this range may be acceptable for certain task orders. Specific implements such as: rotary tillers, rotary brush mowers, or others may be specified for a task order. Other task orders may describe a desired condition, leaving methodology up to contractor. |
| 25 |
| Acres |
| $____________ |
| $_______________ |
| B205.3 |
| Clearing: Early successional |
| Above ground vegetation will be felled/removed without below ground disturbance. Task order may specify varying height requirements from 3" to 36" of vegetation to remain. This line item, when prescribed for wildlife habitat improvement, may specify species, designate particular vegetation, or describe fractions of areas to be treated in a task order. Vegetation in this task order will be less than 3" diameter breast height. Operations to occur when Ground conditions are suitable to prevent rutting. |
| 10 |
| Acres |
| $____________ |
| $_______________ |
| B205.3.a |
| Clearing: Mid successional |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .