AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or

(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

This form was electronically produced by USDA/ARS/OCIO/ADB.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date,etc.)

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

J 1 2

Amendment 3 05/21/2010

USDA-ARS-MWA

1815 N. University Street Peoria, IL 61604

Same as Block 6

AG-5114-S-10-AA11

04/12/2010

N/A

RECOVERY-Repair Building 17 Finishes, ADOL, East Lansing, MI

Technical Amendment titled Addendum No. 2 dated May 21, 2010 is attached.

Task Order No. AG-5114-D-09-0078 Contract No. AG-3K15-53-3K15-4-1500

BIDDING & CONTRACT REQUIREMENTS

Addendum No. 2

DATE: 5/21/2010

United States Department of Agriculture Agricultural Research Service

Bailey Edward Design, Inc.

35 E. Wacker Dr., Suite 2800 Chicago, IL 60601

SUBJECT: ADDENDUM NO. 2 TO THE BIDDING DOCUMENT FOR:

REPAIR BUILDING 17 FINISHES

USDA-ARS

AVIAN DISEASE AND ONCOLOGY LABORATORY (ADOL)

EAST LANSING, MI

Task Order No. AG-5114-D-09-0078

Contract No. AG-3K15-53-3K15-4-1500

CLARIFICATIONS:

1. The ice melt is required for the gutters, the downspouts, and the roof eave, continuously.

2. The ice melt cable should extend 12” up slope from the face of the exterior wall, to the edge of the eaves

SPECIFICATIONS:

1. Section 07 72 00 Snow Melting System

A. Paragraph 1.2.A. to be modified as follows:

“1.2 HEATING CABLE

A. Furnish Heating Cable with the following properties:

1. Single TWIN conductor, series resistance type.

2. Integral full-length foil shield and copper ground conductor.

3. Insulated by

4. Surrounded with an extruded PVC outer jacket. Fluoropolymer type XLPE cross-linked polyethylene.

5. Precut to correct length with 12-gage cold junction conductors integrally welded to the resistance wire at the factory. Field or factory manual crimping of lead wire is not acceptable.

6. Sized to produce a maximum of 8 15.2 Watts/ft, (max 55 watts sq. ft.) when energized

7. Insulation to be tested and documented before shipment with a 500-megohm meter; insulation resistance less than 10 megohm shall be rejected.

8. UL listed

9. Designed to meet current NEC regulations when properly installed.

10. Warranty of ten years minimum.

11. Twin conductor and self-regulating cable is not acceptable.”

This addendum consists of 1 page.

10_0521 Addendum 1.pdf
Single TWIN conductor, series resistance type.
Integral full-length foil shield and copper ground conductor.
Insulated by Utype XLPE cross-linked polyethylene.
Surrounded with an extruded PVC outer jacket. Fluoropolymer
Precut to correct length with 12-gage cold junction conductors integrally welded to the resistance wire at the factory. Field or factory manual crimping of lead wire is not acceptable.
Sized to produce a maximum of 8 15.2 Watts/ft, (max 55 watts sq. ft.) when energized
Insulation to be tested and documented before shipment with a 500-megohm meter; insulation resistance less than 10 megohm shall be rejected.
UL listed
Designed to meet current NEC regulations when properly installed.
Warranty of ten years minimum.
Twin conductor and self-regulating cable is not acceptable.”
10_0521 Addendum 2.pdf
Single TWIN conductor, series resistance type.
Integral full-length foil shield and copper ground conductor.
Insulated by Utype XLPE cross-linked polyethylene.
Surrounded with an extruded PVC outer jacket. Fluoropolymer
Precut to correct length with 12-gage cold junction conductors integrally welded to the resistance wire at the factory. Field or factory manual crimping of lead wire is not acceptable.
Sized to produce a maximum of 8 15.2 Watts/ft, (max 55 watts sq. ft.) when energized
Insulation to be tested and documented before shipment with a 500-megohm meter; insulation resistance less than 10 megohm shall be rejected.
UL listed
Designed to meet current NEC regulations when properly installed.
Warranty of ten years minimum.
Twin conductor and self-regulating cable is not acceptable.”