Amendment One.pdf
PDF 4 MB Posted
- Solicitation number
- AG-5114-S-10-AA04
About this file
This amendment shows corrections and replaces the original drawings uploaded with a corrected set of drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment Three.pdf | ||
| Amendment Two.pdf | ||
| Final Drawings.pdf | ||
| Final Specifications.pdf | ||
| Solicitation.pdf | ||
| Return Bid Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by USDA/ARS/OCIO/ADB.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date,etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
J 1 15
Amendment 1 02/11/2010
USDA-ARS-MWA
1815 N. University Street Peoria, IL 61604
Same as Block 6
AG-5114-S-10-AA04
02/02/2010
N/A
RECOVERY-Building 1-Repair Electrical Distribution System, Avian Disease and Oncology Laboratory, East Lansing, MI
Correct Section F.1 of the solicitation to read 150 calendar days not 90.
Pages Two through Four of the amendment is Addendum No. 1 and contains corrections to the specifications.
Pages Five through Fifteen of the amendment are updated drawings which replace the original drawing that were uploaded.
This amendment becomes part of the contract documents.
Task Order No. AG-5114-D-09-0085 Contract No. AG-3K15-53-3K15-4-1500
BIDDING & CONTRACT REQUIREMENTS
Addendum No. 1
DATE: 2/12/2010
United States Department of Agriculture Agricultural Research Service
Bailey Edward Design, Inc.
35 E. Wacker Dr., Suite 2800 Chicago, IL 60601
SUBJECT: ADDENDUM NO. 1 TO THE BIDDING DOCUMENT FOR:
BUILDING 1 – REPAIR ELECTRICAL DISTRIBUTION SYSTEM
USDA-ARS
AVIAN DISEASE AND ONCOLOGY LABORATORY (ADOL)
EAST LANSING, MI
Task Order No. AG-5114-D-09-0085
Contract No. AG-3K15-53-3K15-4-1500
SPECIFICATIONS:
1. Section 01 11 00 Summary of Work A. Paragraph 1.4.A. to be modified as follows: “The work is located at Building 1 and Building 6 of the U.S. Department of Agriculture’s Agricultural Research Facilities, Avian Disease and Oncology Laboratory (ADOL), East Lansing, Michigan.”
B. Delete Paragraph 1.5.B.
2. Section 01 33 00 Submittal Procedures
A. End of this section to include the following attachment:
Submittal Log.PDF. (Attachment is part of Addendum 1.)
3. Section 01 40 00 Quality Requirements
A. Paragraph 1.1.C. to be modified as follows: “See Divisions 2 through 31 Sections and Drawings for specific test and inspection requirements.”
B. Delete Paragraph 1.3.
C. Delete Paragraphs 1.5.E. and 1.5.F.
D. Paragraph 1.6.B.1. to be modified as follows: “Quality control services are the Contractor's responsibility. Where specified in Division 2 through Division 31 Sections and where indicated on the Drawings, engage a qualified testing agency to perform these quality-control services.”
4. Section 01 50 00 Temporary Construction Facilities and Controls A. Paragraph 3.1.A. to be modified as follows: “The Contractor
Contract No. AG-3K15-53-3K15-4-1500 shall be responsible for requiring each employee engaged on the work to display identification provided by the Location.
Prescribed identification shall immediately be delivered to the Location for cancellation upon release of any employee.
Contractor and subcontractor personnel shall wear identifying markings on hard hats clearly identifying the company for whom the employee works.”
B. Delete Paragraph 3.5.B.
5. Section 07 92 00 Joint Sealants A. Delete paragraph 1.5.A.
B. Delete paragraph 1.5.B.
6. Section 09 23 00 Plaster A. Paragraph 2.1.B.1. to be modified as follows: “Self-Furred
Diamond Mesh Lath: 3.4 lbs / sq. yd.”
B. Paragraph 2.3.D. to include the following sub-paragraphs as follows: “1. For fastening to concrete, use 3/8” diameter shank, ¾” in length.” and “2. For fastening to masonry back-up, including hollow terracotta, hardened concrete nails and power driven fasteners at the furring dimples, length to suit application.”
C. Paragraph 3.1 to include the following sub-paragraph as follows: “C. Plaster finish will be applied over existing hollow clay tile.”
D. Paragraph 3.3.A.1. to be modified as follows: “Partition Framing and Vertical Furring: Install self-furred diamond mesh lath.”
E. Paragraph 3.5.D.1. to be modified as follows: “Existing plaster finish is a smooth finish. Provide new plaster finish to match existing.”
F. Paragraph 3.6. to include the following sub-paragraph as follows: “B. Where finish coat has delaminated from the substrate, apply bonding agent to the base coat before applying the new finish coat.”
DRAWINGS: A complete drawing set is re-issued as an Addendum 1 item. All changes are indicated by a delta 1 on the drawings. The drawing set includes the following sheets: A100, A101, A102, E1, E2, E3, E4, E5, E6, E7, and E8.
ATTACHMENTS:
1. Submittal Log.PDF
This addendum consists of 2 pages plus 1 page of attachments and 1 drawing set consisting of 11 sheets.
United States Department of Agriculture
Bailey Edward Project No: 0413-08-10 Agency: Agricultural Research Service
Project Location - East Lansing, Michigan Pending Secondary Review Building 1 - Repair Electrical Distribution System Complete Incomplete Revise and Resubmit
SECTION #
TITLE
SHOP DWG.
OR
SAMPLE
DIVISION 01
01 77 00 Closeout Procedures X X X
DIVISION 07
07 92 00 Joint Sealants X X X X X X X
DIVISION 09
09 23 00 Plaster X X
O th er
S ee s p ec if ic at io n se ct io n
M an u fa ct u re r' s C er ti fi ca ti o n
M an u fa ct u re r
In st ru ct io n
M ix
D es ig n
M o ck -u p s
L E
E D
S u b m it ta ls
O p er at io n
M ai n te n an ce M an u al
P ro d u ct D at a
S am p le s
W ar ra n ti es
B o n d s
S ch ed u le s architecture
BAILEY EDWARD
S p ar e
P ar ts
In sp ec ti o n s, T es t
R ep o rt s
S h o p
D ra w in g s
C o lo r
C h ar ts
09 91 00 Painting X
Submittal Log