Amendment One.pdf
PDF 228 KB Posted
- Attached to
- Repair Greenhouse #401 Stub Wall
- Solicitation number
- AG-5114-S-09-AA16
About this file
Amendment extends bid date and includes questions/answers from prebid meeting along with a revised Davis Bacon Wage Determination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications.pdf | ||
| Return Bid Package.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by USDA/ARS/OCIO/ADB.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date,etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
J 1 29
Amendment 1 08/22/2009
USDA-ARS-MWA
1815 N. University Street Peoria, IL 61604
Same as Block 6
AG-5114-S-09-AA16
07/25/2009
N/A
Repair Greenhouse #401 Stub Wall, USDA, ARS, MWA, CDL, St. Paul, MN
BID OPENING DATE HAS BEEN EXTENDED TO 2:00 PM CENTRAL TIME ON SEPTEMBER 3, 2009.
Pages Two through Six of the amendment is Addendum No. 1 and contains questions and answers from the prebid meeting including attendance sign in sheet. This amendment becomes part of the contract documents.
Page Six through Twenty-nine of the amendment replaces Davis Bacon Wage Determination MN20080007 dated July 17, 2009 with Davis Bacon Wage Determination MN20080007 dated August 14, 2009.
Midwest Area Engineer, 1815 North University Street, Peoria, IL 61604
Phone 309-681-6124 Fax: 309-681-6683 email:wayne.myers@.ars.usda.gov
Research, Education and Economics Agricultural Research Service
August 22, 2009
Addendum #1 Repair Greenhouse #401 Stub Wall Cereal Disease Laboratory USDA-ARS, St. Paul, MN
General: The following items reflect modifications and clarifications to the Bidding Documents and to part of the Work for the above project. Acknowledge receipt of this Amendment on Bid Form. Failure to acknowledge receipt of Amendment may subject the Bidder to disqualification. All requirements of the original drawings and specifications shall remain in force except as modified by Amendment.
Item #1:
Regarding Contractor questions: Does scope of work address capping off the stub wall to stop moisture penetration? Does the scope of work address replacing deteriorated block? Clarify extent of grouting of CMU cores.
Government response: The capping off of the stub wall shall be addressed via grouting of the CMU cores. All CMU cores of stub walls (greenhouse and alley house) shall be fully grouted in accordance with ASTM in their entirety from footing to top of stub wall (see Statement of Work - paragraph 9.d.). Based on existing plans available to the Government, the existing CMU extends 4’-8” from finished grade to footing. See Statement of Work – paragraph 7 for stub wall heights above finished grade. Awarded Contractor shall field verify and notify the Government of any discrepancies between existing conditions and conditions indicated above prior to performing the grouting. Replacement of deteriorated block shall not be included in Contractor’s bid. It is intended that broken masonry units will be corrected with the grouting of the CMU cores to provide the proper surface for the plaster coating. After abrasively cleaning the stub walls and prior to grouting CMU cores; Contractor shall notify the Government of any suspect CMU installations that will not provide the proper surface for the Portland cement plaster coating after the grouting is performed.
Item #2:
Regarding Contractor questions: Who is responsible for cleaning of greenhouse and adjacent structures after abrasive cleaning is completed?
Government response: Contractor shall be responsible for cleaning the greenhouse and adjacent structures after the abrasive cleaning (i.e. both interior and exterior installations including adjacent greenhouses and buildings). Contractor shall provide temporary tenting and provisions to limit the amount of spread of dust and debris.
In addition; Contractor shall provide all installations and provisions to protect greenhouse structures, glazing and installations from damage. Contractor shall be responsible for repairing and replacing all damaged surfaces (see Statement of Work – paragraph 9.c.).
Item #3:
Regarding Contractor questions: Who is responsible for removing plant tables?
Government response: Contractor shall be responsible for removing and reinstalling plant tables to complete the Work. Contractor shall coordinate with the Government and the Government shall remove all plant and research material from greenhouse bay prior to starting the Work within the bay. See Statement of Work – paragraph 11 for requirements on interior phasing.
Item #4:
Regarding Contractor questions: Do contractors remove and reinstall the existing evaporative cooler units or new ones?
Government response: See Statement of Work – paragraph 9.a. Contractor shall disconnect and remove evaporative cooling system evaporative pads and water recycle trough system. Recycle trough system shall be replaced with new. New trough system shall match existing in materials and configuration. See Statement of Work – Existing Evaporative Cooler Cross Section for materials and configuration of existing trough system. The scope of work requires re-installing (not replacement) of the existing evaporative cooling system (with a new water trough system) and verifying proper operation. Prior to removal work; Awarded Contractor shall review the cooling system with the Government: verify that existing system as currently installed in operating properly and notify the Government of any suspect components of the cooling system.
Item #5:
Regarding Contractor question(s): Is replacing bolts that attach greenhouse to stub wall to be included in Contractor’s bid?
Government response: Contractor’s bid shall reflect that the replacement of the bolts attaching the greenhouse structure to the stub wall is not part of the scope of work.
Item #6:
Regarding Contractor question(s): Is existing gravel along greenhouse stub walls to be removed and how far will the new plaster coating extend below finished grade?
Government response: New plaster coating shall not extend below finished grade.
See Statement of Work – paragraph 9.e. Bottom of new plaster coating shall be set level at 3” above finished grade (i.e. minor elevation differences are acceptable to provide a level installation).
Item #7:
Regarding Contractor question(s): What is the existing finish on the masonry walls?
Government response: The Government does not have any documentation on the existing coating applied to the stub walls. Contractor shall field verify.
Item #8:
Regarding Contractor question(s): Is a breathable silane sealer acceptable in lieu of the specified coatings?
Government response: Contractor’s bid shall reflect new coatings as indicated in Statement of Work – paragraph 9.j.
Item #9:
Regarding Contractor question(s): Is guttering placed under windows part of the scope of work?
Government response: Except for the water trough system associated with evaporative cooling system; the scope of work does not include any guttering.
Item #10:
Regarding Contractor question(s): If greenhouse exterior disassembly is needed to remove / replace the evaporative cooler, is roof stable or is temporary support necessary?
Government response: See Statement of Work – Existing Evaporative Cooler Cross Section. Disconnecting of greenhouse structure does not appear needed to remove evaporative cooling pads and trough system. Temporary support of greenhouse roof shall not be included in Contractor’s bid. Contractor shall not disconnect greenhouse structure from stub wall without notifying and receiving written approval of the Government.
Item #11:
Regarding Contractor question(s): Will the Government consider filling the block voids with block insulation in lieu of concrete grout?
Government response: Contractor’s bid shall reflect grouting of the CMU cores as indicated in the Statement of Work and in accordance with item #1 above.
Item #12:
Regarding Contractor question(s): Please clarify flashing requirements.
Government response: Reference Statement of Work – paragraph 9.g. Contractor’s bid shall reflect the following flashing installation. Contractor shall furnish and install flashing along intersection of top level of plasterwork and greenhouse frame work.
Flashing shall be L-shaped, 1” x 2”, constructed of 14 gauge aluminum. Flashing shall be attached to underside of existing greenhouse framework with stainless screws and rubber washers (on 16” centers). Flashing shall be placed tight against new plaster work without any mechanical attachment. Contractor shall caulk flashing installation at attachment to greenhouse framework and at joint of flashing to plaster work. (Note: Awarded Contractor shall review existing conditions and discuss any recommended modifications to the flashing installation to prevent intrusion of moisture into the plaster installation prior to submittal of shop drawings. Any modifications to the new flashing installation indicated above will be addressed via a construction change).
GENERAL DECISION: MN20080007 08/14/2009 MN7
Date: August 14, 2009 General Decision Number: MN20080007 08/14/2009
Superseded General Decision Number: MN20070007
State: Minnesota
Construction Type: Building
Counties: Anoka, Carlton, Carver, Cook, Dakota, Hennepin, Itasca, Koochiching, Lake, Ramsey, Scott, Sherburne, St Louis and Washington Counties in Minnesota.
BUILDING CONSTRUCTION PROJECTS (Does not include Residential Construction projects consisting of single family homes and apartments up to and including 4 stories; Does not include Treatment Plants)
Modification Number Publication Date 0 02/08/2008 1 04/04/2008 2 05/02/2008 3 05/16/2008 4 05/30/2008 5 06/13/2008 6 07/11/2008 7 08/08/2008 8 08/15/2008 9 09/05/2008 10 10/03/2008 11 10/31/2008 12 11/14/2008 13 12/19/2008 14 01/16/2009 15 01/23/2009 16 03/27/2009 17 05/01/2009 18 06/12/2009 19 06/26/2009 20 07/03/2009 21 07/17/2009 22 08/07/2009 23 08/14/2009
ASBE0034-008 06/01/2009
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE, AND
WASHINGTON COUNTIES
Rates Fringes
Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems)..............$ 39.19 17.82
ASBE0049-002 06/01/2009
CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES:
8/14/2009http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=Davis-Bacon&docid=MN20080007
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems).....$ 35.81 13.80
ASBE0205-016 05/01/1998
CARLTON COOK, ITASCA, KOOCHICHING, LAKE, AND ST. LOUIS COUNTIES
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulating materials from mechanical systems whether they contain asbestos or not)....$ 19.72 3.69
ASBE0205-018 01/01/2002
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT,SHERBURNE, AND
WASHINGTON COUNTIES
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulating materials from mechanical systems whether they contain asbestos or not)....$ 23.06 5.25
BOIL0647-002 07/01/2009
Rates Fringes
BOILERMAKER......................$ 33.84 18.53
BRMN0001-001 05/01/2009
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE (City of Elk River) & WASHINGTON COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 34.39 14.65
BRMN0001-004 05/01/2009
Rates Fringes
MARBLE SETTER....................$ 34.39 14.65
BRMN0001-017 05/01/2009
ALL COUNTIES EXCEPT:
CARLTON, COOK, LAKE & ST LOUIS (City of Duluth and South of Township Line 55)
Rates Fringes
Tile Layer.......................$ 30.58 17.95
BRMN0001-021 05/01/2009
Rates Fringes
TILE FINISHER....................$ 26.80 14.49
BRMN0001-033 05/01/2009
Rates Fringes
TERRAZZO WORKER/SETTER
Base Machine................$ 32.94 14.55 Finisher....................$ 32.61 14.55 Mechanic....................$ 34.56 14.55
BRMN0003-002 05/01/2009
CARLTON, COOK, LAKE & ST. LOUIS (South of a line between Townships #54 & #55, 2 miles north of Cotton) COUNTIES:
Rates Fringes
BRICKLAYER.......................$ 30.29 17.95
BRMN0003-003 05/01/2008
CARLTON, COOK, LAKE & ST. LOUIS (City of Duluth and south of Township Line 55)
Rates Fringes
Tile Layer.......................$ 24.13 17.38
BRMN0015-002 05/01/2009
KOOCHICHING COUNTY
Rates Fringes
BRICKLAYER.......................$ 30.20 14.30
BRMN0015-004 05/01/2009
KOOCHICHING COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.75 14.30
BRMN0016-001 05/01/2007
ITASCA COUNTY
Rates Fringes
BRICKLAYER.......................$ 29.79 16.85
* CARP0087-004 05/01/2009
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE
(Excluding St. Cloud & extending 5 miles beyond the city limits of St. Cloud) & WASHINGTON COUNTIES
Rates Fringes
CARPENTER
Carpenter, Insulator, Piledriverman...............$ 31.79 16.10
CARP0087-010 05/01/2008
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE AND
WASHINGTON COUNTIES
Rates Fringes
Carpenter & Piledrivermen (Site Preparation, Excavation and Incidental Paving)...........$ 33.37 12.50
CARP0087-014 05/01/2009
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE
(Excluding St. Cloud & extending 5 miles beyond the city limits of St. Cloud) & WASHINGTON COUNTIES
Rates Fringes
CARPENTER
WOOD FRAMED CONSTRUCTION....$ 28.83 8.92
* CARP0190-010 06/01/2009
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE, AND
WASHINGTON COUNTIES
Rates Fringes
LATHER...........................$ 33.04 14.87
CARP0361-008 05/01/2008
CARLTON, COOK, ITASCA, KOOCHICHING, LAKE, ST LOUIS COUNTIES
Rates Fringes
LATHER...........................$ 26.63 13.55
CARP0361-016 05/01/2008
ST LOUIS COUNTY (DULUTH)
Rates Fringes
Carpenter & Piledrivermen (Site Preparation, Excavation, and Incidental Paving)..........................$ 30.17 13.40
CARP0361-017 05/01/2008
ST LOUIS COUNTY
Carpenter & Piledrivermen (Site Preparation, Excavation, and Incidental Paving) Northern St. Louis County...$ 30.23 12.94 Southern St. Louis County except Duluth...............$ 29.77 13.40
CARP0361-018 05/01/2008
CARLTON, COOK, LAKE (South part, excluding Sawbill Landing) AND ST. LOUIS (Duluth Area including Alborn, Arnold, Bartlett, Birch, Brookstone, Canyon, Clinton, Culver, Floodwood, Gowan, Island, Kelsey, Lakewood, Meadowlands, Munger, Palmers, Payne, Prasit, Shaw, Taft) COUNTIES
Rates Fringes
CARPENTER........................$ 26.35 13.55
CARP0548-007 05/01/2008
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE, AND
WASHINGTON COUNTIES
Rates Fringes
MILLWRIGHT.......................$ 33.26 14.36
CARP0596-001 06/01/2008
AREA 1: CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST LOUIS
COUNTIES
AREA 2: REMAINING AREA
Rates Fringes
SOFT FLOOR LAYER
Area 1......................$ 28.91 11.85 Area 2......................$ 32.99 12.05
CARP0606-001 05/01/2008
ITASCA, KOOCHICHING, LAKE (Northern part, including Sawbill Landing) & ST. LOUIS (Excluding Duluth Area) COUNTIES
Rates Fringes
Carpenters:
Carpenter, Piledriverman....$ 25.70 12.44
CARP0606-007 05/01/2008
ITASCA, KOOCHICHING, LAKE (Northern half, excluding Two Harbors, Isabella & Finland), AND ST LOUIS (N.E. 2/3 including Cook, Cusson, Ely; and western strip including Chisholm, Orr and Greaney) COUNTIES
Rates Fringes
CARPENTER (Site Preparation, Excavation, and Incidental Paving)
Carpenter & Piledriverman...$ 30.23 12.94
CARP1348-001 05/01/2008
CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES
Rates Fringes
MILLWRIGHT.......................$ 28.60 12.50
* ELEC0110-006 03/01/2009
Rates Fringes
Communications System (SOUND, SIGNAL & COMMUNICATIONS WORK)
Installer...................$ 21.68 10.48+a,b Technician (Installation of Controller)..............$ 30.98 12.18+a,b
FOOTNOTES:
a. 1 year service - 5 days paid vacation; 2 years service - 10 days paid vacation; 5 years service - 12 days paid vacation; 7 years service - 14 days paid vacation; 9 years service - 16 days paid vacation; 11 years service - 18 days paid vacation; 12 years service - 20 days paid vacation
b. 8 Paid Holidays: New Year's Day; Memorial Day; 4th of July; Labor Day; Thanksgiving Day; Day after Thanksgiving;
the normal work day preceding Christmas Day; & Christmas Day
* ELEC0110-012 05/01/2009
ANOKA (Except Anoka & Fridley Townships & the cities of Andover, Anoka, Columbia Heights, Coon Rapids, Fridley, Hilltop, Ramsey & Spring Lake Park), DAKOTA, RAMSEY, SHERBURNE (East of Becker and Santiago Twps), AND WASHINGTON COUNTIES
Rates Fringes
ELECTRICIAN......................$ 34.60 3%+19.18
ELEC0242-002 05/31/2009
CARLTON, COOK, ITASCA (Southerly 12 Twps. including Harris, Feely, Blackberry, Spang, Coodland, Sago & Wawina), LAKE & ST.
LOUIS (South part bounded on the north by the north line of Kelsey Township extended east & west) COUNTIES
Rates Fringes
ELECTRICIAN......................$ 31.24 63.5%
* ELEC0292-011 05/01/2009
ANOKA (Anoka & Fridley Townships & the cities of Andover, Anoka, Columbia Heights, Coon Rapids, Fridley, Hilltop, Ramsey & Spring Lake Park), CARVER, HENNEPIN, AND SCOTT COUNTIES; AND SHERBURNE COUNTIES (East of Hwy 25 to Hwy 10 and an imaginary line straight West to the Mississiippi River)
ELECTRICIAN......................$ 34.30 70.25%
CABLE SPLICER = $1.00 additional per hour
ELEC0294-002 06/01/2009
ITASCA (Excluding section South of a line extending East & West of the South line of Grand Rapids & Trout Lake Twps), KOOCHICHING (Western part bounded on the east by a line extending north and south from the easternmost point of the city limits of Grand Rapids)
Rates Fringes
CABLE SPLICER....................$ 32.83 58.75%
Electricians:
Jobs over $3,244,800........$ 32.28 58.75% Jobs under $3,244,800.......$ 23.44 37.5%+5.70
ELEC0294-006 06/01/2009
KOOCHICHING (East of a line extending North and South from the easternmost point of City limits of Grand Rapids), & ST. LOUIS (North part bounded on the south by the south line of Ellsburg Township, extended east & west) COUNTIES
Rates Fringes
ELECTRICIAN......................$ 32.28 58.75%
CABLE SPLICER: $0.55 additional per hour
ELEV0009-001 01/01/2009
Rates Fringes
ELEVATOR MECHANIC................$ 39.58 18.285
FOOTNOTE:
PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
* ENGI0049-040 05/01/2009
Site Preparation, Excavation, and Incidental Paving
Rates Fringes
Power Equipment Operator
AREA 1:
GROUP 1....................$ 31.57 15.25
GROUP 2....................$ 30.57 15.25
GROUP 3....................$ 30.02 15.25
GROUP 4....................$ 29.72 15.25
GROUP 5....................$ 26.68 15.25
GROUP 6....................$ 25.47 15.25
AREA 2:
GROUP 1....................$ 29.11 15.25
GROUP 2....................$ 28.11 15.25
GROUP 3....................$ 27.66 15.25
GROUP 4....................$ 27.36 15.25
GROUP 5....................$ 24.79 15.25
GROUP 6....................$ 23.92 15.25
AREA 3:
GROUP 1....................$ 24.45 15.25
GROUP 2....................$ 23.45 15.25
GROUP 3....................$ 22.52 15.25
GROUP 4....................$ 22.21 15.25
GROUP 5....................$ 20.50 15.25
GROUP 6....................$ 19.90 15.25
AREA DESCRIPTIONS
AREA 1 (METRO): ANOKA, CARVER, COOK, DAKOTA, HENNEPIN, LAKE,
RAMSEY, SCOTT, SHERBURNE (South of the Northern boundary of T. 33-N, and East of the western boundary of R. 27-W), ST.
LOUIS, and WASHINGTON COUNTIES
AREA 2 (EASTERN): CARLTON, ITASCA (East of the Western right of way of Hwy #6), KOOCHICHING (East of a North-South line from the Canadian border to Pelland, the Western right of way of Hwy #71 from Pelland to Big Falls and Hwy #6), and SHERBURNE (Remainder) COUNTIES
AREA 3 (WESTERN): ITASCA (Remainder) and KOOCHICHING (Remainder) COUNTIES
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1 - Helicopter Pilot; *Crane with over 135' Boom, excluding Jib; Dragline, Crawler, Hydraulic Backhoe and/or other similar equipment with Shovel-type Controls 3 cu.
yds. & over Mfg. rated Cap.; & Pile Driving when 3 Drums are in use
GROUP 2 - Cableway; Concrete Mixer, Stationary Plant over 34E; Derrick (Guy or Stiffleg) (Power) (Skids or Stationary); Diver; Dragline, Crawler, Hydraulic Backhoe and/or similar equipment with Shovel-type Controls, up to 3
cu. yds; Dredge or Engineers, Dredge (Power) & Engineer;
Front End Loader, 5 cu. yds. & over; Grader or Motor Patrol, Finishing Earthwork & Bituminous; Locomotive Crane;
Master Mechanic; Mixer (Paving) Concrete Paving, Road;
Mole, including Power Supply; Mucking Machine, including Mucking Operations, Conway or similar type; Piledriving;
Refrigeration Plant Engineer; Tandem Scraper; Tractor - Boom type; Truck Crane - Crawler Crane; & Tugboat 100 HP & over
GROUP 3 - Dual Tractor; Elevating Grader; Pumpcrete; Scraper- Struck Cap. 32 cu. yds & over; & Self-propelled Traveling Soil Stabilizer
GROUP 4 - Air Track Rock Drill; Articulated Hauler Terex, Caterpillar or similar type; Asphalt Bituminous Stabilizer Plant; Automatic Road Machine (CMI or similar); Backfiller;
Bituminous Roller (8 Tons & over); Bituminous Spreader & Finishing (Power); Boom Truck (Power operated Boom); Brokk or R.T.C. 750 Remote Control or Similar types with all attachments; Cat & Scraper; Cat Tractor with Rock Wagons or similar types; Challenger 75-D or 85-D when pulling Scraper or Bulldozer; Chip Harvester & Tree Cutter over 150 HP;
Concrete Batch Plant; Concrete Mixer on jobsite over 14S;
Concrete Mobile; Crushing Plant (Gravel & Stone) or Gravel Washing, Crushing & Screening Plant; Curb Machine;
Directional Boring Machine; Dope Machine (Pipeline); Drill Rigs, Heavy Rotary or Churn or Cable Drill; Fork Lift or Straddle Carrier; Fork Lift or Lumber Stacker; Front End Loader, over 1 cu. yd.; Hoist Engineer (Power); Hydraulic Tree Planter; Launcherman (Tankerman or Pilot License);
Lead Greaser; Locomotive; Mechanic; Milling, Grinding & Planing Machine; Morbark Tub Grinder or Similar Type;
Multiple Machines, such as Air Compressors, Welding Machines, Generators, Pumps; Pavement Breaker or Tamping Machine (Power Driven) Mighty Mite or similar type; Pickup Sweeper, 1 cu. yd. & over Hopper Cap.; Pipeline Wrapping, Cleaning or Bending Machine; Power Plant Engineer, 100 K.W.H. & over; Power Actuated Horizontal Boring Machine, over 6"; Pugmill; Rubber- tired Farm Tractor, Backhoe Attach.; Scraper, up to 32 cu. yds.; Skid Steer Loader, over 1 cu. yd. with Backhoe Attachment; Slip Form (Power Driven) (Paving); Tie Tamper & Ballast Machine; Tractor, Bulldozer; Tractor Operator, over 50 HP with Power Take-off; Trenching Machine (Sewer, Water, Gas); Well Point Installation; & Dismantling or Repair Mechanic
GROUP 5 - Air Compressor, 600 CFM or over; Bituminous Roller (Under 8 tons); Bituminous Rubber-tired Roller; Bituminous Spreader & Bituminous Finishing Machine Tender (Power);
Concrete Distributor & Spreader Finishing Machine, Longitudinal Float, Joint Machine, & Spray; Concrete Saw (Multiple Blade) (Power Operated); Form Trench Digger (Power); Front End Loader, up to & incl. 1 cu. yd.; Grader (Motor Patrol); Gunite Gunall; Hydraulic Log Splitter;
Loader (Barber Greene or similar type); Payhauler or similar type; Post Hole Driving Machine/Post Hole Augar;
Power Actuated Auger & Boring Machine; Power Actuated Jack;
Pump; Self-propelled Chip Spreader (Flaherty or similar);
Sheep Foot Compactor with Blade - 200 HP & over;
Shouldering Machine (Power) Apsco or similar type incl.
self-propelled Sand & Chip Spreader; Stump Chipper & Tree Chipper; Tractor Operator, Bulldozer, 50 HP or less; & Tree Farmer (Machine)
GROUP 6 - Challenger 75-D or 85-D when pulling Disk or Roller; Conveyor; Dredge Deck Hand; Fireman or Tank Car Heater; Gravel Screening Plant (Portable not Crushing or Washing); Greaser (Truck or Tractor); Leverman; Mechanic Tender; Mechanic, Space Heater (Temporary Heat); Oiler (Power Shovel, Crane, Dragline); Power Sweeper; Roller on Gravel Compaction; Self-propelled Vibrating Packer (35 HP & over); Sheep Foot Roller; Tractor, Wheel Type (over 50 HP); & Truck Crane Oiler
*CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM; CRANE
OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM UNDERGROUND
WORK:
TUNNELS, SHAFTS, ETC. - $ .25 PREMIUM UNDER AIR PRESSURE -
$ .50 PREMIUM
HAZARDOUS WASTE PROJECTS (PPE Required):
LEVEL A - $1.25 PREMIUM
LEVEL B - $ .90 PREMIUM
LEVEL C - $ .60 PREMIUM
ENGI0049-041 05/01/2009
Rates Fringes
Power Equipment Operator
(BUILDING CONSTRUCTION)
GROUP 1.....................$ 34.64 15.25
GROUP 2.....................$ 34.30 15.25
GROUP 3.....................$ 32.89 15.25
GROUP 4.....................$ 32.55 15.25
GROUP 5.....................$ 32.38 15.25
GROUP 6.....................$ 30.87 15.25
GROUP 7.....................$ 29.75 15.25
GROUP 8.....................$ 27.74 15.25
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1 - Helicopter Operator; Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over
GROUP 2 - Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane 200' & Over, Concrete Pump 164 ft Boom
GROUP 3 - Traveling Tower Crane; Master Mechanic; Pile Driving Operator (when 3 drums are used); Truck & Crawler Crane, up to but not including 150' of Boom, including Jib;
Derrick (Guy & Stiffleg); Tower Crane (Stationary) up to 200'; & AllTerrain Vehicle Crane, Boom Truck over 100 ft.
GROUP 4 - Crawler Backhoe; Hoist Engineer (3 drums or more);
Locomotive Operator; Overhead Crane Operator (inside building perimeter); & Tractor Operator with Boom
GROUP 5 - Air Compressor Operator 450 CFM or over (2 or more machines); Pump Operator and/or Conveyor Operator (2 or more machines); Mechanic; Pumpcrete or Complaco type Machine Operator; Forklift; Boom Truck up to 100 ft.;
Concrete Mixer Operator; Drill Rig - Heavy Rotary or Churn when used for Caisson Drilling for Elevator Cylinder or Building Construction; Front End Loader (Over 1 cu. yd.);
Hoist Engineer (1 or 2 drums); Straddle Carrier Operator;
Power Plant Engineer (100 KW & over on multiples equal to 100KW & over); Tractor Operator over D2; & Well Point Pump Op.
GROUP 6 - Concrete Batch Plant Operator; Gunite Operator;
Tractor Operator D2 or similar size; & Front End Loader Operator, up to 1 cu. yd.
GROUP 7 - Air Compressor Operator 600 CFM or over; Pump and/or Conveyor Operator; Brakeman; Pick-up Sweeper (1 cu.
yd. & over Hopper capacity); Truck Crane Oiler; & Welding Machine Operator, Fireman temporary heat.
GROUP 8 - Mechanical Space Heater (Temporary Heat); Oiler or Greaser; & Elevator Operator
IRON0512-001 05/01/2009
ANOKA, BENTON, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT,
SHERBURNE, STEARNS, & WASHINGTON COUNTIES
Rates Fringes
IRONWORKER.......................$ 33.80 20.44
IRON0512-019 05/01/2009
CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES
Rates Fringes
IRONWORKER.......................$ 29.76 19.50
LABO0010-001 05/01/2008
Landscape Laborer................$ 16.26 9.68
LABO0132-002 05/01/2008
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE AND
WASHINGTON COUNTIES
Rates Fringes
LABORER (Asbestos abatement).....$ 28.11 10.57
LABO0132-010 05/01/2008
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE &
WASHINGTON COUNTIES
Rates Fringes
Laborers:
Group 1.....................$ 30.56 10.93 Group 2.....................$ 31.06 10.93 Group 3.....................$ 31.56 10.93
LABORERS CLASSIFICATIONS
GROUP 1 - Construction Craft Laborer; Flagperson/Traffic Control; Carpenter Tender; Concrete; Damp Proofer Below Grade; Drill Runner Tender; Dumpman - Dirt, Asphalt, Concrete, Cement; Heater Tender; Hot Tar Caulker - Corker;
Joist Handler; Material Handler - Power Buggy; Rebar; Snow Blower Operator; Signal Person; Hydro Blast or Waterblast;
Chain Saw Operator; Concrete Saw, Drill Operator; Concrete Vibrator; Demolition & Remodeling, Excluding Demolition of an entire Structural System; Mason Tender; Mortar Mixer - Cement or any other substitute Material or Composition;
Pipe Handler; Pneumatic & Electric Tool, Jackhammer, Paving Buster, Chipping Hammer, Tamper Operator, etc.;
Swing Stage Line Scaffold (Not including "Patent" Scaffolding); Torchman - Gas, Electric, Thermal or similar device; & Remote Control Tamper
GROUP 2 - Caisson Work; Mounted Wall Saw Operator; Nozzle Operator-Gunite, Cement, Sandblasting; Pipelayer; Pipe Rehab Technical, including Cleaning, Cutting, Cameraing, etc; Refractory Worker; Sheeting Setter & Driver, Heavy Building Excavation; Underground Work-Open Ditch or Excavation 8' Below Grade; & Underpinning
GROUP 3 - Driller for Blasting purposes; Dynamite Blaster or substitute products Tovex TR, Water, Gas, Gel, Bristar, Silent Dynamite, etc.
LABO0132-014 06/01/2007
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE &
WASHINGTON COUNTIES:
Rates Fringes
PLASTER TENDER...................$ 30.73 11.21
LABO0563-006 05/01/2008
Site Preparation, Excavation, and Incidental Paving
Laborers:
AREA 1:
GROUP 1....................$ 27.32 10.83
GROUP 2....................$ 27.52 10.83
GROUP 3....................$ 27.67 10.83
GROUP 4....................$ 27.77 10.83
GROUP 5....................$ 28.02 10.83
GROUP 6....................$ 29.32 10.83
AREA 2:
GROUP 1....................$ 26.82 10.26
GROUP 2....................$ 27.02 10.26
GROUP 3....................$ 27.17 10.26
GROUP 4....................$ 27.27 10.26
GROUP 5....................$ 27.52 10.26
GROUP 6....................$ 28.82 10.26
AREA 3:
GROUP 1....................$ 25.83 11.25
GROUP 2....................$ 26.03 11.25
GROUP 3....................$ 26.18 11.25
GROUP 4....................$ 26.28 11.25
GROUP 5....................$ 26.53 11.25
GROUP 6....................$ 27.83 11.25
AREA 4:
GROUP 1....................$ 18.99 9.11
GROUP 2....................$ 19.19 9.11
GROUP 3....................$ 19.34 9.11
GROUP 4....................$ 19.44 9.11
GROUP 5....................$ 19.69 9.11
GROUP 6....................$ 20.99 9.11
AREA DESCRIPTIONS
AREA 1 (District 1): ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE, and WASHINGTON COUNTIES
AREA 2 (District 2A): CARLTON, COOK, LAKE and ST. LOUIS (South of T. 55 N) COUNTIES
AREA 3 (District 2B): ITASCA and ST. LOUIS (North of T. 55 N)
AREA 4 (District 4): KOOCHICHING COUNTY
LABORERS CLASSIFICATIONS
GROUP 1: Construction; Bituminous Batcherperson (Stationary Plant); Bituminous Worker - Shoveler, Raker, Floater, Squeegee, Utility; Blaster Tender; Brick Tender; Carpenter Tender; Cement Coverperson Batch Truck; Cement Handler - Bulk, Bag; Concrete Batcherperson; Concrete Handler, Caisson, Footings, Columns, Piling, Slabs, etc.; Concrete Longitudinal Float Operator (Manual Bullfloat on Paving);
Concrete Shoveler, Tamper & Puddler (Paving); Conduit Layer; Curb Setter; Damp Proofer Below Grade; Demolition of an entire Structural System, Excluding Remodeling; Drill Runner Tender; Dump Operator (Dirt, Paver, Dumping Batch Truck, etc.); Fabric Installer; Grade Checker; Hydrant & Valve Setter; Hydro Blast or Waterblaster; Joint Filler (Concrete Pavement); Kettleperson (Bituminous or Lead);
Labor Wrecking Demolition; Mortar Mixer; Pipe Handler;
Power Buggy Operator; Pump Operator(Less than 6");
Retaining Wall Installation; Sand Cushion Bedmaker; Slip
Lining of Utility Lines; Soil Stabilizer; Sound Barrier & Guard Rail Installation; Squeegeeperson; Stabilizing Batcherperson (Stationary Plant); Temporary Heaters & Blower Tender; Top Person (Sewer, Water or Gas Trench);
Flagperson;Traffic Controller (Traffic Barriers) & Transit/Level. Laser Beam (sewer, water, gas) $1.50 above Group 1 rate. Blasting Person (Dynamite or substitute product) $3.00 above Group 1 rate.
GROUP 2: Chain Saw; Compaction Equipment (Hand Operated or Remote Control); Concrete Drilling; Concrete Mixer Operator; Concrete Sawer; Concrete Vibrator; Ditch & Other Work more than 8' Below starting level of manual work;
Formsetter; Joint Sawer, Mortar; Pipe Fuser/Technician;
Pneumatic Tools, Jackhammer, Paving Buster, Chipping Hammer, etc.; Remote Control Demo Machine & Related Accessories (Electric/Hydraulic); Stone Tender/Mason Tender; & Torchperson - Gas, Electric, Thermal or Similar Device
GROUP 3: Brick or Block Paving Setter; Caisson Work;
Cofferdam Work
GROUP 4: Cement Gun Operator (1 1/2" or Over); Driller - Air Track or Similar; & Nozzle Operator (Gunite, Sandblasting, Cement); Pipe Rehab (Including Cleaning, Relining, Camera).
GROUP 5: Asbestos & Hazardous Waste Technician;Bottom person (Sewer, Water, or Gas Trench more than 8 ft below starting level of manual work); Tunnel Laborer; Tunnel Miner; Tunnel Miner Tender; Underground Laborer; & Underpinning
GROUP 6: Pipelayer, Tunnel Miner Under Pressure
LABO1091-001 05/01/2008
CARLTON, COOK, LAKE & ST. LOUIS (South of T 55 N) COUNTIES:
Rates Fringes
Laborers:
GROUP 1.....................$ 24.23 10.16
GROUP 2.....................$ 24.38 10.16
GROUP 3.....................$ 24.63 10.16
GROUP 4.....................$ 24.93 10.16
GROUP 5.....................$ 22.33 10.16
LABORER CLASSIFICATIONS
GROUP 1: General; Carpenter Tender; Concrete Laborer; Damp Proofer Below Grade; Drill Runner Tender; Dumpman - Dirt, Asphalt, Concrete, Cement; Heater Tender; Hot Tar Caulker - Corker; Joist Handler; Rebar; Snow Blower Operator;
Signalperson; Material Handler (All types Power Buggy);
Fire Control; Asbestos Removal; & Hazardous Waste
GROUP 2: Chain Saw Operator; Concrete Saw, Drill Operator;
Concrete Vibrator; Demolition & Wrecking, Excluding Remodeling; Gunite, Sandblasting Machine Operator; Mason Tender; Mortar Mixer - Cement or any other substitute material or composition; Pipe Handler; Pneumatic & Electric Tools,Jackhammer, Paving Buster, Chipping Hammer, Tamper Operator, etc.; Swing Stage Line Scaffold (not including "patent" scaffolding); Torchman - Gas, Electric, Thermal or similar device; & Hydroblast
GROUP 3: Caisson Work; Nozzle Operator - Gunite, Cement, Sandblasting; Pipelayer; Refractory Worker; Sheeting Setter & Driver, Heavy Building Excavation; Underground Work - Open Ditch or Excavation 8' Below Grade; Underpinning; & Hod Carrier
GROUP 4: Driller for Blasting Purposes; Dynamite Blasters or substitute products Tovex TR, Water, Gas, Gel, Bristar, Silent Dynamite, etc.; Asbestos Abatement Worker; & Hazardous Waste Worker
GROUP 5: FLAGPERSON
LABO1091-003 01/01/2009
CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES
Rates Fringes
LABORER (Asbestos Abatement).....$ 27.65 11.11
LABO1097-001 05/01/2008
ITASCA, KOOCHICHING & ST. LOUIS (North of T 55N) COUNTIES:
Rates Fringes
Laborers:
GROUP 1.....................$ 23.77 10.71
GROUP 2.....................$ 24.17 10.71
GROUP 3.....................$ 24.47 10.71
GROUP 4.....................$ 25.77 10.71
LABORERS CLASSIFICATIONS
GROUP 1: Construction; Carpenter Tender; Concrete; Damp Proofer Below Grade; Dump Person - Dirt, Asphalt, Concrete & Cement; Heater Tender; Hot Tar Caulker - Corker; Joist Handler; Material Handler - Power Buggy; Rebar; Signal Person; & Snow Blower Operator; Chain Saw Operator;
Concrete Vibrator; Demolition & Wrecking, Excluding Remodeling; Mason Tender; Mortar Mixer - Cement or Any Other Substitute Material or Composition; Pipe Handler;
Pneumatic & Electric Tool, Jackhammer, Paving Buster, Chipping Hammer, Tamper Operator, Etc.; Swing Stage Line Scaffold (Not including "Patent" Scaffolding); & Torch Person - Gas, Electric, Thermal or similar device;
Scrapping, Sweeping & Clean- up; Skid Steer, Forklift (Incidental Use); Flagperson.
GROUP 2: Creosote Handler; Caisson Work; Concrete Saw Drill Operator; Nozzle Operator - Gunite, Cement, Sandblasting;
Pipelayer; Sheeting Setter & Driver, Heavy Building Excavation; Underground Work - Open Ditch or Excavation 8' Below Grade; Underpinning; & High Pay/Low Pay - 40 ft. Over or Under Ground Floor without Conventional Floor Areas;
Pipe- Rehab Technician, including Cleaning, Cutting, Camering, etc.; and Wall Mounted Saw Operator
GROUP 3: Driller for Blasting Purposes; Dynamite Blaster or substitute products; & Tovex TR, Water, Gas, Gel, Bristar, Silent Dynamite, etc.
GROUP 4: Refractory work
PAIN0061-001 05/01/2009
DAKOTA, RAMSEY AND WASHINGTON COUNTIES
Drywall Finisher/Taper..............$ 30.94 15.40 Sander......................$ 23.19 15.40 Painters:
Brush; Paperhanger..........$ 30.94 15.60 Sandblaster; Spray; Swing Stage; Boatswain Chair;
Window Jack; Safety Belt;
Erected Structural Steel;
Application of Epoxy Materials & Materials containing over 50% Creosote....................$ 31.69 15.60
PAIN0106-001 05/01/2009
CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES:
Rates Fringes
GLAZIER..........................$ 24.85 12.95
FOOTNOTE:
1 to 4 years service - 1 week paid vacation; 5 to 11 years - 2 weeks paid vacation; 11 years or more - 3 weeks paid vacation
PAIN0106-011 05/01/2008
CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES:
Rates Fringes
Painters:
New:
Brush; Roller..............$ 27.41 12.52 Paperhanging; Spray;
Steel and Taping...........$ 28.01 12.52 Repaint:
Brush; Roller; & Lead Base Paint Removal & Abatement with Basic Hand Tools such as Scrapers.....$ 25.91 12.52 Paperhanging; Spray;
Steel; Taping; Lead Base Paint Removal/Abatement with Other Than Basic Hand Tools.................$ 26.51 12.52
PAIN0386-001 06/01/2008
ANOKA, CARVER, HENNEPIN, SCOTT & SHERBURNE (South and East of a line drawn between the town of Santiago in Sherburne County and the town of Clearwater in Wright County) COUNTIES
Rates Fringes
Painters:
Brush; Roller & Paperhanger.$ 30.65 13.99 Spray; Steel; Sandblaster;
Swing Stage & Epoxy.........$ 31.40 13.99
PAIN0386-011 08/01/2008
ANOKA, CARVER, HENNEPIN, SCOTT & SHERBURNE (South & east of a line drawn between the town of Santiago, Sherburne County and the town of Clearwater, Wright County) COUNTIES
Rates Fringes
Drywall Finisher....................$ 29.17 15.67 Sander......................$ 21.87 15.67
PAIN0880-001 05/01/2002
Rates Fringes
Sign Painter.....................$ 21.12 2.07+a+b
FOOTNOTES:
a. 8 Paid Holidays: New Year's Day; Memorial Day;
Independence Day; Labor Day; Thanksgiving Day; the Day After Thanksgiving; the last working Day Before Christmas; & Christmas Day
b. Vacation Pay: 3 years service - 2 weeks paid vacation; 6 years service - 3 weeks paid vacation; 15 years service - 4 weeks paid vacation
PAIN0884-010 06/01/2008
BENTON, SHERBURNE (Western one-half, North & West of a line drawn between the city of Santiago in Sherburne County & the city of Clearwater in Wright County) & STEARNS COUNTIES:
Rates Fringes
Drywall Finisher/Taper...........$ 24.16 11.96 Painters:
Brush & Roller..............$ 24.16 11.71
PROJECTS UNDER $8,000: Receive 80% of basic hourly rate.
PAINTER'S PREMIUM: $0.75 per hour additional for the following work: Spray, Two Component Paints, Epoxies, Sandblasting & Rigging, Work done on Swing Scaffolding, Safety harness, Window Jacks, Boatswain's Chair, Coverings & erection of scaffolding for same, Work on erected Structural Steel, Abrasive Blasting.
PAIN1324-006 06/02/2008
ANOKA, CARVER, DAKOTA, HENNEPIN, ITASCA, KOOCHICHING, RAMSEY,
SCOTT, SHERBURNE, & WASHINGTON COUNTIES
Rates Fringes
GLAZIER..........................$ 34.31 12.80
PLAS0265-001 06/01/2009
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE &
WASHINGTON COUNTIES:
Rates Fringes
PLASTERER........................$ 34.63 13.89
PLAS0633-001 05/01/2009
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE &
WASHINGTON COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 31.14 16.60
PLAS0633-004 05/01/2009
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE &
WASHINGTON COUNTIES:
Rates Fringes
CEMENT MASON/CONCRETE
FINISHER (Site Preparation, Excavation, & Incidental Paving)..........................$ 30.45 16.50
PLAS0633-011 05/01/2009
CARLTON, COOK, LAKE & ST. LOUIS (South of T 55N) COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.04 15.45
PLAS0633-020 05/01/2009
CARLTON, COOK, LAKE & ST. LOUIS (South of T. #55 north) COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE
FINISHER (Site Preparation, Excavation & Incidental Paving)..........................$ 29.63 15.45
PLAS0633-024 05/01/2008
ITASCA & ST. LOUIS (North of White Face River) COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 25.40 12.45
PLAS0633-041 05/01/2009
KOOCHICHING COUNTY
Rates Fringes
CEMENT MASON/CONCRETE
FINISHER (Heavy, Sewer & Water Lines).....................$ 25.40 12.45
PLASTERER........................$ 21.15 11.85
PLAS0633-050 05/01/2009
CARLTON, COOK, ITASCA, LAKE AND ST. LOUIS COUNTIES
PLASTERER........................$ 28.17 15.70
PLUM0011-001 05/01/2008
CARLTON, COOK (A strip 20 miles inland along the shores of Lake Superior), LAKE (A strip 20 miles inland along the shores of Lake Superior) & ST. LOUIS (South of an east-west line drawn through Cotton) COUNTIES
Rates Fringes
Plumber, Pipefitter, Steamfitter......................$ 33.70 14.35
PLUM0015-001 05/01/2008
ANOKA, CARVER, HENNEPIN, SCOTT & SHERBURNE (East of a line running northeasterly from the point of Wright County that lies furthest north to that pont of Mille Lacs County that is south by west) COUNTIES
Rates Fringes
PLUMBER..........................$ 36.35 17.43
FOOTNOTE:
Paid Holiday: Labor Day
PLUM0034-002 05/01/2008
DAKOTA, RAMSEY & WASHINGTON COUNTIES
Rates Fringes
PLUMBER..........................$ 36.91 17.59
FOOTNOTE:
Paid Holiday: Labor Day
PLUM0417-001 01/01/2009
ANOKA, DAKOTA, HENNEPIN, RAMSEY, SCOTT & WASHINGTON COUNTIES:
Rates Fringes
SPRINKLER FITTER.................$ 38.64 16.85+a
FOOTNOTE:
a. Paid Holidays: Memorial Day; July 4th; Friday before Labor Day; Labor Day; Columbus Day; & Thanksgiving Day
PLUM0455-002 05/01/2008
DAKOTA, RAMSEY & WASHINGTON COUNTIES:
Rates Fringes
PIPEFITTER.......................$ 36.41 19.57
PLUM0539-001 05/01/2009
ANOKA, CARVER, HENNEPIN, SCOTT & SHERBURNE (East of a line running northeasterly from the point of Wright County that lies furthest north to that pont of Mille Lacs County that is south by west) COUNTIES
Rates Fringes
PIPEFITTER.......................$ 38.38 19.55
PLUM0539-007 05/01/2009
SHERBURNE COUNTY (West of a line running Northeasterly from the Northern point of Wright County to the Souithwestern tip of Mille Lacs County)
Rates Fringes
PIPEFITTER.......................$ 32.35 19.68
PLUM0589-001 05/01/2009
COOK (Except a strip 20 miles inland along the shores of Lake Superior), ITASCA, KOOCHICHING, LAKE (Except a strip 20 miles inland along the shores of Lake Superior) & ST. LOUIS (North of an East-West line drawn through Cotton) COUNTIES
Rates Fringes
PLUMBER, PIPEFITTER,
STEAMFITTER......................$ 34.34 15.97
ROOF0096-003 07/06/2009
CARLTON, COOK, LAKE & ST. LOUIS (South of Hwy 16, excluding city of Forbes) COUNTIES
Rates Fringes
ROOFER...........................$ 29.20 13.20
ROOF0096-005 05/01/2009
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT & WASHINGTON
COUNTIES
Rates Fringes
ROOFER...........................$ 32.49 13.65
FOOTNOTE: Paid Holiday - Labor Day
ROOF0096-012 05/01/2009
ITASCA, KOOCHICHING & ST. LOUIS (Northern two-thirds) COUNTIES
Rates Fringes
ROOFER...........................$ 25.70 9.65
SFMN0669-005 01/01/2009
CARLTON, CARVER, COOK, ITASCA, KOOCHICHING, LAKE, SHERBURNE,
AND ST. LOUIS COUNTIES
Rates Fringes
SPRINKLER FITTER.................$ 31.26 14.80
SHEE0010-045 05/01/2008
CARLTON, COOK, LAKE & ST. LOUIS (Southern one-third) COUNTIES
Rates Fringes
SHEET METAL WORKER...............$ 30.85 16.91
SHEE0010-046 05/01/2008
ITASCA, KOOCHICHING & ST. LOUIS (Northern two-thirds) COUNTIES
Rates Fringes
SHEET METAL WORKER...............$ 29.99 16.08
SHEE0010-047 05/01/2009
ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT & WASHINGTON
COUNTIES
Rates Fringes
Sheet metal worker...............$ 38.46 18.34
FOOTNOTE: Paid Holiday: Labor Day
SHEE0010-048 05/01/2008
SHERBURNE COUNTY
Rates Fringes
SHEET METAL WORKER...............$ 31.77 15.28
TEAM0160-014 05/01/2008
Rates Fringes
TRUCK DRIVER (Site Preparation, Excavation & Incidental Paving))
AREA 1:
GROUP 1....................$ 25.15 11.80
GROUP 2....................$ 24.60 11.80
GROUP 3....................$ 24.50 11.80
GROUP 4....................$ 24.25 11.80
AREA 2:
GROUP 1....................$ 24.75 11.80
GROUP 2....................$ 24.20 11.80
GROUP 3....................$ 24.10 11.80
GROUP 4....................$ 23.85 11.80
AREA 2A:
GROUP 1....................$ 23.80 11.80
GROUP 2....................$ 23.25 11.80
GROUP 3....................$ 23.15 11.80
GROUP 4....................$ 22.90 11.80
AREA 4:
GROUP 1....................$ 19.32 11.40
GROUP 2....................$ 18.81 11.40
GROUP 3....................$ 18.66 11.40
GROUP 4....................$ 18.66 11.40
AREA DESCRIPTIONS
AREA 1: ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT,
SHERBURNE & WASHINGTON COUNTIES
AREA 2: COOK, LAKE & ST. LOUIS COUNTIES
AREA 2A: CARLTON AND ITASCA (East of T.H. #6) COUNTIES
AREA 4: ITASCA (West of T.H. #6), AND KOOCHICHING COUNTIES
TRUCK DRIVER CLASSIFICATIONS
GROUP 1 - Boom; Mechanic; Off-Road, including Articulated Dump Truck; Tractor Trailer; Winch Truck
GROUP 2 - Tri Axles (Including Four Axles)
GROUP 3 - Bituminous Distributor; Bituminous Distributor (One man operation); Tandem Axles & Single Axles
GROUP 4 - Bituminous Distributor Spray Operator (Rear and Oiler); Dumpman; Pilot Car; Self-propelled Packer; Slurry Operator; Tank Truck Tender (Gas, Oil, Road Oil & Water);
Tractor Operator (Wheel type used for any purpose)
THE FOLLOWING CLASSIFICATIONS SHALL COME UNDER THE
APPROPRIATE AXLE RATE WAGE GROUP: "A" Frame; Dry Batch Hauler; Ready-Mix Concrete; Slurry; Tank (Gas, Oil, Road Oil & Water)
TEAM0346-001 05/01/2008
ANOKA, CARLTON, CARVER, COOK, DAKOTA, HENNEPIN, ITASCA (East of
T.H. #6), LAKE, RAMSEY, ST. LOUIS, SCOTT, SHERBURNE &
WASHINGTON COUNTIES
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 25.70 9.70
GROUP 2.....................$ 25.15 9.70
GROUP 3.....................$ 25.05 9.70
GROUP 4.....................$ 24.80 9.70
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Boom Truck
GROUP 2: Ready Mix, Tractor Trailor
GROUP 3: Fork Lift, Mechanic, Tandem or 3 axle truck
GROUP 4: Dumpman, Farm Tractor, Single or 2 axle Truck
TEAM1097-004 05/01/2008
ITASCA (West of T.H. 36), AND KOOCHICHING COUNTIES
Rates Fringes
TRUCK DRIVER.....................$ 23.77
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch…