ATTACHMENT_1_-_Boundary_Line_Painting_Specs_AP_EN__2015.pdf
PDF 335 KB Posted
- Solicitation number
- AG-4670-S-15-0049
- Issued by
-
Department of Agriculture Forest Service
About this file
Attachment 1 - Specifications
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
* The Forest Service will supply paint, nails, signs, and maps for this project.
* The Forest Service needs 72.088 miles of property boundary line painted, see attached maps for locations. Work shall include the following:
- Existing marked trees to include witness/corners and line trees will be re-painted with red paint, See Exhibit 6, pages 1 and 2 for illustrated description.
- Scrape pine trees prior to repainting, and Hack trees as per guidelines.
- Sign every tree that is marked as a line tree (boundary line goes through the tree) with Forest Service provided sign “National Property Boundary”. These signs should also be placed before and after all stream/creek and road crossings. The nails will be left protruding at least 1” to provide for growth.
- Existing bearing trees will be refurbished, scrape/paint, see Exhibit 3 for illustrated bearing tree.
- The witness/corner tree locations will be brushed out to provide easy visibility. Brushing along the line will be necessary to only provide general walk through along the line.
- Put the paint on thick as some of the areas may not be re-marked for several years.
- Work to be completed no later than August 17, 2015.
- Paint USGS Marker Post, not over the emblem on top of the post.
- Victor Vazquez will be the U.S Forest Service field contact representative.
File details come from the government source that posted it. Updated .