FORM - Equipment Pre-use Checklist

View the file

Other files

File Type Posted
Amendment_0001_Bid_Schedule.xlsx XLSX spreadsheet
Amd_001_SF30.pdf PDF
ATT2_SAVANNAH_RIVER_SITE_SPECIAL_REQUIREMENTS.PDF PDF
RFQ_Body.doc DOC document
ATT3__FORESTRY_WAGES.docx DOCX document
IDIQ_Planting_Bid_Schedule.xlsx XLSX spreadsheet
ATT1_SOW__SPECS.docx DOCX document
SF1449_RFQ.pdf PDF
ATT4_PERFORMANCE_ASSESSMENT_FORM.docx DOCX document
ATT6_PREBID_LOCATION.pdf PDF
ATT4_Planting_Inspection_Form.docx DOCX document
ATT3__DOL_WAGES.DOCX DOCX document
ATT4_Planting_Computation_Form.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR EQUIPMENT PRE-USE CHECKLIST

1. Owner

2. Contractor

3. Contract No.

4.Contract Date

5. Make
6. Model, Type
7. Serial No./VIN
8. License No.
ACCEPTABLE
COMMENTS
YES
NO

1. Canopy, roll over-protection system.

2. Lights mounted and working while operating. (If Applicable).

3. Brakes hold at half travel.

4. No visible leaks or drips.

5. Belly plate and radiator guard securely mounted.

6. Tire, tracks or undercarriage in serviceable condition.

7. Blade or booms operate smoothly and hold at any point.

8. Drawbar: Serviceable, safe.

9. N/A

ACCESSORIES (CHECK BELOW IF IN OR ON VEHICLE)

FIRST AID: YES NO REFLECTORS YES NO

FIRE EXTINGUISHER YES NO SAFETY BELTS YES NO

BLOOD-BORNE PATHOGEN KIT YES NO BACK-UP ALARM YES NO

MIRRORS SERVICEABLE YES NO

DEMO: OPERATE THRU FULL RANGE YES NO

SIGNATURE: DATE:

The Contractor completes this checklist prior to the use of all Contractor / Vendor heavy equipment on Savannah River Site ensuring the equipment is serviced and maintained in accordance with each Manufacturer’s recommendations and OSHA requirements and will be operated, inspected, and maintained by a qualified, competent person for the duration of the Contract. If ANY component is determined to be unsatisfactory, the unsatisfactory equipment may not be used until the deficiency is corrected. The COR, Inspector, FSR, TSA, representative will observe the contractor completing this checklist and obtain a copy for USFS-SR contract files.