ATT1_SOW__SPECS.docx
DOCX document 74 KB Posted
- Solicitation number
- AG-4660-S-16-0001
- Issued by
-
Department of Agriculture Forest Service
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0001_Bid_Schedule.xlsx | XLSX spreadsheet | |
| Amd_001_SF30.pdf | ||
| ATT2_SAVANNAH_RIVER_SITE_SPECIAL_REQUIREMENTS.PDF | ||
| RFQ_Body.doc | DOC document | |
| ATT3__FORESTRY_WAGES.docx | DOCX document | |
| ATT4_EQUIPMENT_PREUSE_CKLIST.docx | DOCX document | |
| IDIQ_Planting_Bid_Schedule.xlsx | XLSX spreadsheet | |
| SF1449_RFQ.pdf | ||
| ATT4_PERFORMANCE_ASSESSMENT_FORM.docx | DOCX document | |
| ATT6_PREBID_LOCATION.pdf | ||
| ATT4_Planting_Inspection_Form.docx | DOCX document | |
| ATT3__DOL_WAGES.DOCX | DOCX document | |
| ATT4_Planting_Computation_Form.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAVANNAH RIVER SITE PLANTING CONTRACT
SPECIFICATIONS/STATEMENT OF WORK
GENERAL SPECIFICATIONS INDEX:
| C.1. |
| GENERAL SPECIFICATIONS |
| C.2. |
| DEFINITIONS |
| C.3. |
| GOVERNMENT FURNISHED PROPERTY AND SERVICES |
| C.4. |
| CONTRACTOR WORK REQUIREMENTS AND STANDARDS |
| C.4.2. |
| REQUIREMENT GUIDELINES |
| C.5.1. |
| TECHICAL SPECIFICATIONS |
| C.8.1. |
| EQUIPMENT TECHICAL SPECIFICATIONS REQUIREMENTS |
| D.1. |
| CONTRACTOR SAFETY REQUIREMENTS |
| E.2. |
| CONTRACTOR QUALITY CONTROL PLAN |
| F.1. |
| INSPECTION AND ACCEPTANCE |
| G.1. |
| MEASUREMENT AND PAYMENT |
17 ATTACHMENT 1
Section C.
C.1. GENERAL SPECIFICATIONS:
| C.1.1. |
| Scope of Contract. This is a Performance - Based Indefinite Delivery/Indefinite Quantity contract for machine and hand planting services for Government-furnished bare root and containerized tree seedlings at the USDA Forest Service, Savannah River Site (SRS), New Ellenton SC, on Department of Energy lands. The acres to be planted each year range from a minimum of 500 to a maximum of 1000 acres. Contractor shall furnish all labor, materials, and equipment (including safety equipment), tools, transportation, supervision, and perform all work required to machine plant pine seedlings and / or hand plant pine seedlings in accordance with the specifications and provisions of the contract. |
Contractor shall be required to maintain a quality control plan and a self-inspection system. No materials, labor, or equipment will be furnished by the Government unless specifically identified in the Government-furnished Property Clause.
| C.1.2. |
| Individual Task Order(s). A task order will be issued in accordance with clause 52.216-18 Ordering contained in this contract. Task orders are valid if signed by the Contracting Officer (CO), or any EAZ Contract Specialist. The Contracting Officer reserves the right to delete areas or to substitute at the contract price the same type and amount of work (+/- 10 acres) in other areas similar in topography and conditions within the Savannah River Site boundaries, in lieu of the original areas when it is determined by the Contracting Officer that the original areas or portions thereof are unsuitable or unavailable for performance of the specified work. |
| C.1.3. |
| Description and Location. Contract areas are clear – cuts, some containing reserve trees. All contract areas to be planted are within the boundaries of the Savannah River Site, Aiken, and Barnwell counties, South Carolina. Specific information and vicinity maps showing project location and access will be provided with each task order prior to contractor beginning work. Unforeseen hazards may be encountered within the planting sites, such as, but not limited to, unmarked open wells, ditches, gullies, and steep slopes. The Forest Service highly recommends that the contractor inspect each site before starting work. |
| C.1.4. |
| Type of Site Preparation. The type of site preparation will vary due to differing |
topography, soil type, and vegetation cover. The type of site preparation for planting sites may be one or a combination of the following; no site preparation, broadcast burned, chemical treatment, shear and raked, drum chopped. No one area will be representative of the remaining areas. It is recommended that all prospective bidders participate in a site visit.
| C.1.5. |
| Boundaries. The boundaries of the planting sites are marked on the ground with paint |
(three stripes) on the perimeter trees and / or flagging. Some of the areas have been plowed around in preparation for burning. In some cases the fire line does not coincide with the painted or flagged boundary; however seedlings shall be planted to 20 feet from painted and / or flagged boundary unless instructed otherwise by the COR.
| C.1.6. |
| Adverse Site Conditions. If unanticipated problem sites are encountered due to high water table or other uncontrollable factors, the contractor will be directed to plant these sites when conditions are favorable or may be directed to use a different planting method. |
C.2. DEFINITIONS:
Contract Time. All calendar days allowed for completion of contract work. Includes all days of the week including weekends and holidays.
Tree Drip Line. The line extending vertically from the exterior edge of a tree’s live crown to the ground.
Lateral Roots. The horizontal roots extending from the main vertical (tap) root.
Root Length. The root length measured from the original ground line to the end of the main vertical or taproot.
Bare – Root Seedlings. Tree seedlings grown in nursery beds, lifted for transplanting with dirt removed from roots before packing.
Containerized Seedlings. Tree seedlings grown in hard – walled vessels, with (6) inch root plugs.
Quality Assurance. The actions taken by the Government to assess the contractor’s results to determine that they meet contract requirements.
Quality Control. Those actions taken by a contractor to control the production of outputs to ensure that they conform to the contract requirements. The methods for inspecting for quality control are described in the Contractor’s Quality Control Plan (QCP).
Designated Reserved Tree(s).
Type (1) reserved trees are pine and hardwood trees that are paint marked with either a continuous band around the tree bole or a single stripe on opposite sides of same tree. The paint color is Orange, White, or Pink. Type (1) reserved trees are to be protected from damage by the contractor’s operations.
Type (2) reserved trees are pine and hardwood trees that are paint marked with “X” symbols. The paint color is Orange, White, or Pink. Type (2) reserved trees require no protection from the contractor’s operations.
C.3. GOVERNMENT FURNISED PROPERTY AND SERVICES:
Property and services that will be provided by the Government are as follows:
| Item |
| Description |
| Where, When, How |
3.1. Detailed planting
schedule.
| Stand unit list, with species / acres. |
| Provided with task order. |
| 3.2. Project maps. |
| Maps of the stand units to be planted. |
Provided with task order.
3.3. Access behind
locked gates.
Government shall provide access through road closures with detailed instructions.
During the contract period contractor shall be required to sign for gate key(s).
3.4. Tree seedling
planting stock.
Bare root / Containerized Longleaf, Loblolly, Shortleaf pine tree seedlings.
Delivered to delivery point.
3.5. Planting
inspection field forms.
Form(s) needed for contractor self-inspection.
As required.
| 3.6. D.O.E. site pagers. |
| D.O.E. Site pager(s) Emergency Notification |
| Provided at pre work meeting. |
C.4. CONTRACTOR WORK REQUIREMENTS AND STANDARDS
| C.4.1. |
| Road Access / Power Lines: The contractor may access the planting units from the |
primary site and forest roads, indicated on project maps. The contractor shall not block any roads with equipment, and remain a distance of (25) feet from power lines when working and parking equipment.
| C.4.1.2. |
| Locked Gates: In cases where planting units are located behind locked gates, the contractor shall close and lock gates after entering or exiting each gate. |
| C.4.1.3. |
| Contractor shall not have more than two incomplete sites being worked on at the same time unless approved by the COR. |
| C.4.1.4. |
| Erosion Control. All equipment will be operated in a manner causing the least possible disturbance to the soil. Machine planting shall follow the natural contour of the land to minimize loss of soil and seedlings due to erosion. |
| C.4.1.5. |
| Protection of Designated Reserved Tree(s). The contractor shall be assessed $50.00 per skinned or damaged Type (1) reserved pine or hardwood trees marked with a painted continuous band or a single stripe on opposite sides of same tree. The paint color is Orange, White, or Pink. Type (2) reserved pine or hardwood trees marked with painted Orange, White, or Pink colored “X” symbols require no protection from damage by the contractor’s operations. In some cases, contractor may be directed by COR to protect trees of any type, whether paint marked or not. |
| C.4.1.6. |
| Protection of Streams, Lakes, Reservoirs, and Improvements. Contractor shall use every precaution necessary to prevent pollution of streams, lakes, and reservoirs by fuels, oils, other chemicals, silt or other harmful materials. All streams will be kept free of contractor-generated debris. The contractor shall take every precaution necessary to prevent damage to any improvement within the contract area(s), such as roads, trails, ditches, fences, etc. Roads and trails shall be kept free of logs, slash, and other debris. The contractor shall promptly repair any damages caused by the contractor’s operations. Access guidelines will be provided by the COR. |
| C.4.1.7. |
| Disposal of Seedling Bags, Boxes and Other Debris. All seedling wrappers / bags, boxes, binding straps, and contractor-generated debris shall be removed from the planting site(s). Seedling bags, boxes may be disposed of at the Forest Service’s main office. The contractor shall contact the USFS-SR Coordination Center (Fire Dispatch) in order to obtain permission before burning seedling bags, boxes on the work site(s). Permission may be denied during periods of high fire danger. Metal burn barrels, equipped with a screen over the opening may only be used to burn seedling bags, boxes and are not to be located within (25) Ft. from where seedlings are being handled. |
| C.4.1.8. |
| Protection of Soil. Contractor shall use every precaution necessary to prevent the |
contamination of soil by the spills of petroleum products (oils and fuels), ethylene glycol (coolant), and other chemicals or harmful materials. Contractor shall also be responsible for reporting all spills of the aforementioned materials within one working day to the Contracting Officer or his / her representative and the USFS-SR Coordination Center (Fire Dispatch). The contractor shall also be responsible for the excavation and disposal of all soils, contaminated by the contractor’s operations. The contractor shall take contaminated soils to a certified state operated landfill capable of accepting the type – contaminated soil. A receipt of acceptance for the contaminated soil must be presented to the CO / COR and Environmental Coordinator.
| C.4.1.9. |
| Tree Seedlings. Bare root seedlings shall be furnished in bags, containerized seedlings shall be furnished in boxes by the Forest Service to the contractor. Contractor shall be responsible for loading and transporting seedlings from cold storage building to planting sites. Cold storage building is located at the Forest Service’s main office at SRS. For purposes of Section C.3.4, seedlings will be considered delivered to the contractor upon contractor’s removal of seedlings from the cold storage building for transporting to planting area. Pick up time of seedlings at the cold storage building will be agreed upon by the Government and contractor at the pre work meeting. |
| C.4.1.10. |
| The contractor shall notify the Contracting Officer’s Representative (COR) of any changes to the normal operating schedule. Any unplanted seedlings will be returned to the cold storage building each night by 7:00 PM. No more than one day’s supply of seedlings shall be checked in or out of the cold storage building without the approval of the COR. Contractor shall be required to complete checkout sheet each day for all seedlings that are removed from or returned to cold storage building. |
| C.4.1.11. |
| Each week during the course of this contract, the contractor shall furnish to the COR a seedling supply need for the upcoming two-week period. The Government shall furnish (1) delivery per week at a maximum of (100,000) thousand seedlings per delivery to the contractor. Contractor must plan his / her planting operations based on this requirement. |
| C.4.1.12. |
| The contractor shall protect the seedlings and take precaution to prevent damage to the seedlings from time the seedlings are received until they are planted. |
| C.4.1.13. |
| Seedling Transporting and Insulated Cargo Trailer. The contractor shall be required to provide an insulated cargo trailer internally lined with styrofoam insulation (minimum ¼ inch thick). Contractor shall be responsible for loading and transporting seedlings from the Forest Service’s facility to the planting sites. All seedlings not in the process of being planted shall be kept in the insulated cargo trailer AT ALL TIMES, unless specific instructions otherwise are given by COR to meet on-the-ground planting conditions. Seedlings shall not be moved, carried, or transported from the cold storage building at the Forest Station to the planting site(s) without being enclosed in the insulated cargo trailer. Insulated cargo trailers provided by the contractor must be approved by the COR prior to use. |
C.4.2. Requirement Guidelines:
| C.4.2.1. |
| Quality Control. The contractor shall prepare a Quality Control Plan as described in |
Section E. The contractor shall inspect the work in accordance with the accepted Quality Control Plan.
| C.4.2.2. |
| PERFORMANCE REQUIREMENTS SUMMARY: The following describes the major items in the contract with the incentives and deductions for the work described. Items below are included here as requirements. |
| Work Statement |
| Performance Standard |
| Gov’t Method of Assessment |
| Incentives and Deductions for meeting the Standard |
Tree Seedling handling and care.
Section(s) C.5.5. – C.5.5.12.
Tree Seedlings are properly handled and cared for.
When violations occur, contractor takes corrective action immediately.
COR shall monitor operations on a daily basis.
The contractor’s care and handling of tree seedlings will affect the performance evaluation as either a positive or negative incentive.
If contractor meets the standard, no deductions.
If contractor does not meet the standard and / or take corrective action, the Government may assess actual damages, and provide adverse performance evaluation.
Tree Seedling planting.
Section F.
| Planting quality meets or exceeds performance standard. |
| COR shall conduct periodic inspection consisting of plots consistent with Planting Inspection |
Section F The contractor’s planting quality will be reflected in the performance evaluation as either a positive or negative incentive.
If contractor achieves 100% planting quality or greater, full unit price as incentive.
If contractor does not achieve at least 90% quality, deductions as per Section G.1.4. May result in adverse performance evaluation.
Quality Control.
Section C.4.2.1.
Contractor maintains good quality control on all aspects of operation including tree seedling handling and planting. Actions not consistent with contract specifications are corrected as per the Quality Control Plan.
| COR shall observe operations on a daily basis. |
| The quality of Quality Control provided by the contractor will be reflected in the performance evaluation as either a positive or negative incentive. |
If the contractor fails to meet standards, work may be suspended or the contractor put in default for failure to take corrective action immediately and result in adverse performance evaluation.
Work Plan and Schedule.
Section(s) C.4.1.10.
C.4.1.11.
| Work meets schedule as per the accepted work plan. |
| COR shall observe operations on a daily basis. |
The contractor’s ability to maintain the work schedule and complete work on schedule will be reflected in the performance evaluation as either positive or negative incentive.
Work not completed on schedule is subject to default and may result in assessment of actual costs.
| C.4.2.4. |
| Communications. The contractor shall keep the Contracting Officer and COR advised as to where the contractor can be reached prior to start of contract time. Further the contractor shall maintain daily contact with the Contracting Officer and COR during periods of work suspension to reduce any delay in resuming planting and to determine the best suitable time and conditions to resume planting. |
| C.4.2.5. |
| Supervision Requirement – Machine Planting. A supervisor conversant in the English language shall be designated in writing by the contractor for each site. The designation shall indicate the limit of the supervisor’s authority. When two or more people are designated as supervisor; their written delegation shall indicate the priority of their designations so no more than one person shall be in charge of a crew at any one time. The supervisor shall be on the site at all times when crew(s) are working. The supervisor may work as a planter or equipment operator. |
| C.4.2.6. |
| Supervision Requirement – Hand Planting. A supervisor conversant in the English language shall be designated in writing by the contractor for each crew |
of planters. The designation shall indicate the limits of the supervisor’s authority. When two or more people are designated as supervisor, their written delegation shall indicate the priority of their designations so no more than one person shall be in charge of a crew at any one time. The supervisor shall be with the crew at all times while the crew is working. Each crew will perform as an individual working unit during normal daily work operations. Crews shall not be separated or divided into smaller working units unless prior consent is received from the Contracting Officer or COR. The supervisor may also work as a hand planter.
| C.4.2.7. |
| Method of Planting. All areas shall be planted as specified. If the area(s) cannot be planted as specified due to soil conditions or site preparation method at the time of planting, the contractor may have to change the method of planting on a particular site. However the contractor shall not deviate from the specified method of planting unless authorized in writing to do so by the Contracting Officer. |
| C.4.2.8. |
| Other Areas. Contractor shall be required to hand plant small corners, isolated spots and areas too small or too wet to efficiently plant by machine. |
| C.4.2.9. |
| General Site Communications. Communications shall be required at all sites being |
worked (cellular phones). The contractor shall be issued DOE site pager(s).
C.5.1. TECHNICAL SPECIFICATIONS:
| C.5.1.1. |
| Planting Instructions. Tree seedlings shall be planted following the procedures in |
Section C.5.2. (for hand planting), and Section C.5.3.(for machine planting), and in accordance with the following instructions.
C.5.1.2. GENERAL PLANTING INSTRUCTIONS:
| C.5.1.2.1. |
| Item(s) 0001 – 0002 Machine Planting Bare Root / Containerized Longleaf Pine Seedlings: Contractor shall plant a minimum of 482 trees per acre evenly distributed through each acre for 100% payment, (Refer to paragraph G.1.4) approximate spacing 10 x 9 ft. Plant tree seedlings in rows located ten (10) feet apart, spacing within rows will be (9) feet apart to obtain (500) properly planted seedlings per acre. Contractor will be required to adjust spacing accordingly. Contractor will be allowed to “waste” (50) seedlings per / acre without being charged for the value of these seedlings. “Waste” seedlings are improperly planted seedlings and properly planted seedlings in excess of the number of seedlings per acre specified in each area. Unplantable seedlings will not be counted as waste seedlings. |
| C.5.1.2.2. |
| Item(s) 0003 – 0004 Machine Planting Bare Root / Containerized Loblolly, Shortleaf Pine Seedlings: Contractor shall plant a minimum of 653 trees per acre evenly distributed through each acre for 100% payment, approximate spacing 10 x 6.5 ft. Plant tree seedlings in rows located ten (10) feet apart. If all seedlings are properly planted, spacing within rows will be (6.5) feet apart to obtain (670) properly planted seedlings per acre. Contractor will be required to adjust spacing accordingly. Contractor will be allowed to “waste” (87) seedlings per / acre without being charged for the value of these seedlings. “Waste” seedlings are improperly planted seedlings and properly planted seedlings in excess of the number of seedlings per acre specified in each area. Unplantable seedlings will not be counted as waste seedlings. |
| C.5.1.2.3 |
| Item(s) 0001 – 0004 Hand Planting Pine Seedling (Spacing). |
Hand plant longleaf bare root / containerized seedlings as specified in C.5.1.2.1.
Hand plant loblolly / shortleaf bare root / containerized seedlings as specified in C.5.1.2.2.
| C.5.1.2.4. |
| Plant one tree seedling per planting spot in a vertical position with less than (20) degree lean in a hole or trench free of debris. Roots / plugs will be planted in a natural vertical position. |
| C.5.1.2.5. |
| Spacing of trees within rows must be equal over the entire area. Row location may be adjusted as necessary to fit the terrain and to avoid obstructions. |
| C.5.1.2.6. |
| Bare root seedlings planted in a "J, "L", twisted, or balled configuration are unacceptable. Seedlings shall be counted as incorrectly planted during inspections if any roots are exposed above the soil surface. |
| C.5.1.2.7. |
| Close planting trench or hole at the bottom as well as the top to prevent subsurface air pockets. Soil must be firmly packed around each planted tree seedling. Seedlings |
will be planted so as to withstand being pulled from the ground by the terminal group of needles.
| C.5.1.2.8. |
| Plant tree seedlings as close to windrows as possible, not to exceed (5) feet from the base of windrows. Also, plant seedlings in breaks and at ends of each windrow. |
| C.5.1.2.9. |
| Do not plant within ten (10) feet of any designated system road, fence, pipeline, power line right of way or twenty (20) feet from boundaries unless instructed to do so by the COR. |
| C.5.1.2.10. |
| Plant each bare root / containerized longleaf seedling so that the terminal bud is at the soil surface. Seedlings planted with root collars exposed above ground level greater than (0.5) inch or terminal buds buried deeper than (0.5) inches below soil surface shall be counted as incorrectly planted seedlings. Containerized longleaf seedlings shall be covered at the top of the plugs by soil to prevent moisture lost from the growing media or shall be counted as incorrectly planted seedlings. |
| C.5.1.2.11. |
| Plant loblolly / shortleaf bare root seedlings at the same depth at which it grew in the nursery. Seedlings planted with root collars greater than +/- (1) inch of soil surface shall be counted as incorrectly planted seedlings. |
| C.5.1.2.12. |
| Plant loblolly / shortleaf containerized seedlings at the same depth at which it grew in the nursery. Seedlings planted with root collars greater than +/- (1) inch of soil surface shall be counted as incorrectly planted seedlings. Containerized loblolly / shortleaf seedlings shall be covered at the top of the plugs by soil to prevent moisture lost from the growing media or shall be counted as incorrectly planted seedlings. |
| C.5.1.2.13. |
| Planting will not be allowed when soil conditions are unacceptable as determined by |
the COR.
| C.5.1.2.14. |
| If any three (3) contiguous acres are below (90%) planting quality, the Government |
can direct contractor to rework area before continuing work.
| C.5.2. |
| Hand Planting Instructions. Tree seedlings shall be planted in accordance with the following instructions and instructions contained in Section C.5.1.2. General Planting Instructions. |
| C.5.2.1. |
| The planting spot shall be scalped free of debris (duff, leaves, litter, grass, etc.). |
| C.5.2.2. |
| Contractor should remove one plantable seedling from the planting bag (unplantable seedlings are to be discarded) one at a time to ensure survivability. See C.5.4.3. for a description of plantable and unplantable seedlings. Immediately place the plantable seedling in the planting hole, with the seedling tree roots or plug in a natural vertical position. |
| C.5.2.3. |
| Pack soil firmly around each seedling, close the planting hole at the bottom, (no air |
pockets), as well as at the top so as seedling will withstand being pulled from the ground by the terminal group of needles.
| C.5.2.4. |
| After the soil is firmed around the tree seedling, the planting spot shall be smoothed out, level to the surrounding mineral soil surface. |
| C.5.3. |
| Machine Planting Instructions. Tree seedlings shall be planted in accordance with the following instructions and instructions contained in Section C.5.1.2. General Planting Instructions. |
| C.5.3.1. |
| Planting machines shall make a clean trench a minimum of ten (10) inches deep and pack the soil firmly around each planted seedling leaving a minimal birm. Close planting trench at the bottom, (no air pockets), as well as the top so as seedlings will withstand being pulled from the ground by the terminal group of needles. Loose seedlings (those easily pulled from the ground or improperly firmed) shall be counted as incorrectly planted during inspections. |
| C.5.3.2. |
| The planting machine shall follow the natural contour of the land to minimize the loss of soil and seedlings due to erosion. |
| C.5.3.3. |
| If the majority of the seedlings being planted by any one planting machine do not meet planting specifications, contractor will be required to stop planting with that machine until corrections are made that will enable the machine to plant seedlings in accordance with contract specifications. |
| C.5.3.4. |
| The contractor shall plant adjacent to drip lines of reserve pine and hardwood trees that are marked with a painted blue or orange colored band. |
C.5.4. Pine Seedlings.
| C.5.4.1. |
| Due to the perishable nature of southern pine seedlings; |
►Bare root longleaf seedlings are to be planted within (12) days.
►Containerized longleaf seedlings are to be planted within (14) days.
►Bare root loblolly / shortleaf seedlings are to be planted within (21) days.
►Containerized loblolly / shortleaf seedlings are to be planted within (14) days.
Of delivery to the Forest Service at Savannah River from the nursery.
| C.5.4.2. |
| Bare root seedlings furnished will be "bed-run" and will contain a low percentage although an unknown amount of unplantable seedlings. The plantable / unplantable seedling ratio will vary in each bag and will not be known exactly until the individual bag has been used. |
| C.5.4.3. |
| Unplantable seedlings are not to be planted. Any unplantable seedling planted will be counted as improperly planted, but will not be counted as "waste" seedlings. |
Unplantable seedlings are described as follows:
Bare Root Longleaf
Containerized Longleaf
Bare Root Loblolly / Shortleaf
Containerized Loblolly / Shortleaf
| Damaged Seedlings |
| Damaged Seedlings |
| Stem length less than (6) inches |
Damaged Seedlings
| Root collar diameter less than (0.40) inch |
| ↓ |
| Stem diameter less than (0.13) inch (weak and succulent) |
Diseased Seedlings
Damaged Seedlings Diseased seedlings
| Tap root less than six (6) inches long |
| ↓ |
| Root length less than six (6) inches long |
| ↓ |
| C.5.4.4. |
| Unplantable seedlings shall be discarded while plantable seedlings that are discarded by the contractor will be counted as "wasted" seedlings. Excess "wasted" seedlings will be calculated on a per acre basis and will be paid for by the contractor. Contractor will be charged the price that the Forest Service paid for the seedlings. Contractor will not be allowed to sort and discard seedlings in advance of planting. Only at the Government’s discretion may lesser quality seedlings be planted by the contractor than described in Section C.5.4.3. |
C.5.5. Care and Handling of Seedlings.
| C.5.5.1. |
| Seedlings may be planted at any time when weather conditions are determined to be |
satisfactory by the COR. Frozen ground, temperature above (80) degrees F, relative humidity below (30%), winds above (5) MPH, available soil moisture less than (50%), or saturated soils are unsatisfactory planting conditions. Contractor may be required to cover open seedling bags with moist burlap if conditions become unsuitable.
C.5.5.2. Non-Refrigerated Transportation and Planting Site Storage.
| C.5.5.3. |
| Seedlings shall be transported to planting sites and stored while on planting sites in a stryrofoam insulated cargo trailer furnished by the contractor. |
| C.5.5.4. |
| All seedlings not in a mechanical planter or hand planter carried bag shall be kept in the insulated cargo trailer. |
| C.5.5.5. |
| The insulated cargo trailer shall be kept closed at all times except when seedlings are being removed from or returned to. |
| C.5.5.6. |
| Seedling bags, boxes should not have prolonged exposure to direct sunlight. |
| C.5.5.7. |
| Water roots of seedlings in bags if roots begin to dry. Do not puddle water in bags as |
excess water can drown root tips and promote mold on the seedlings.
| C.5.5.8. |
| Tree seedling roots shall not be pruned by the contractor. Any pruning required will be performed by the Forest Service prior to furnishing seedlings to the contractor for |
planting.
| C.5.5.9. |
| Inspect and repair torn seedling bags, boxes immediately. |
| C.5.5.10. |
| Seedling bags, boxes should be kept closed when not in use to prevent exposure to the elements. |
| C.5.5.11. |
| Seedlings shall not, be kept overnight in the insulated cargo trailer. Care should be taken to ensure that all seedlings temporarily stored on the site are planted that day. |
| C.5.5.12. |
| If there are leftover seedlings, they shall be returned to the cold storage building each night. |
C.6.1. Field Planting & Handling Standards:
| C.6.1.1. |
| General. Protect seedlings from damage. Do not crush, stand or sit on or throw |
seedlings. Do not abuse the seedlings by hitting or striking the roots or plugs against any objects to remove excess soil. Do not expose seedlings to sun or wind.
| C.6.1.2. |
| Hand Planting. Only one bag or box of seedlings will be opened at a time. Individual planters will share seedlings in each packed bag rather than each planter having their |
"own" bag. Planter is to remove only one seedling at a time from personal planting bag immediately before planting seedling in a prepared hole.
| C.6.1.3. |
| Planter shall gently remove seedling from personal seedling bag to prevent striping or |
other root damage. Quickly and gently insert seedling into planting hole.
| C.6.1.4. |
| Seedlings carried in individual planters bag shall not exceed the amount that can be |
carried or removed without injury, or which can be planted before critical heating or drying occurs. Seedlings placed in bags shall be planted out and not returned to storage. Seedlings placed in planting bags shall be planted out before extended breaks such as lunch.
| C.6.1.5. |
| Planting bags shall be a light color, not retain heat, have a minimum depth of (15) inches and shall be free of defects or contaminants. |
C.7.1. Machine Planting.
| C.7.1.1. |
| Remove only one handful of seedlings at a time from the bag. Separate and untangle |
seedlings, dropping the unplantable seedlings on the ground (Section C.5.4.3).
| C.7.1.2. |
| Open seedling bags or boxes in machine planter shall be covered or closed each time the planter is not planting or stopped regardless of duration. |
| C.7.1.3. |
| Any damaged or surface drying of seedling roots or plugs due to contractor neglect or abuse will result in the contractor being charged for the seedlings at the Government’s cost for the seedlings. |
| C.8.1. |
| EQUIPMENT TECHNICAL SPECIFICATION REQUIREMENTS: |
All mechanical equipment used in the performance of the contract work shall be of the proper size and type, be equipped with proper safety attachments so as to protect the operator from injury and in such mechanical condition to accomplish planting which is in accordance with these specifications and exhibits. There shall be communications between tractor operator and planter operator. Prior to use on site the contractor shall be required to complete a “Contractor Equipment Pre – Use Checklist” form for each crawler tractor, tree planter and OTV. The COR shall observe the contractor completing this checklist and obtain a copy for USFS – SR contract files.
| C.8.1.2. |
| Planting Machines. Planting machines shall be capable of planting evenly spaced seedlings (semi-automatic) equipped with rubber tire packing wheels with at least one coulter not less than (28) inches in diameter (required to meet depth requirements) and have a sharp cutting edge capable of cutting roots and limbs. The coulter and planting |
shoe in all planting machines must be capable of penetrating all soils to a depth of not less than ten (10) inches during planting operations. Planting machines must be equipped with a protective canopy designed so that the operator's movements are not impaired or restricted. In addition the planting machine shall be equipped with a seat belt, which is to be worn at all times when the planting machine is moving. “DANGER STAY BACK 25 FEET”, readable from (50) Feet away must be posted on both sides of planting machines.
| C.8.1.3. |
| Tractor(s). Tractors shall be the crawler-type (for safety reasons) with a front-mounted Cutting V-blade capable of floating and pushing brush and logging debris aside to prepare a clear path for the planting machine. The floating V-blade will have either a rolling drum, skid plate, or wings attached to it to prevent the blade from gouging and scraping away the topsoil. The V-blade shall extend out to but not beyond the crawler tracks. Each tractor shall be equipped with roll over protection (ROP), seat belts which are to be worn at all times when the tractor is moving, limb risers, and a five (5) pound ABC type fire extinguisher. All tractors shall also have proper muffler systems, front, side and rear guarding constructed of such material as to prevent the entrance of trees, branches and other debris into the cab area. The Contracting Officer or an authorized representative may order the removal and require the replacement of any unsatisfactory equipment. |
| C.8.1.4. |
| Transport(s). Transporting equipment shall be in dependable and serviceable condition and capable of safely transporting required equipment over woods, gravel and paved roads. Tires, including spares shall be in good serviceable condition with proper inflation. Loading ramps are required and shall be capable of safely supporting the weight of the crawler tractors being used. Transport equipment shall be equipped with lights in proper working order and fire extinguishers in serviceable condition. The contractor shall tie down all equipment with chains and binders prior to and during transporting. The Contracting Officer or an authorized representative may order the removal and require the replacement of any unsatisfactory equipment. |
D.1. Contractor Safety Requirement(s).
See Attachment 2.
| E.2. |
| CONTRACTOR QUALITY CONTROL PLAN: |
The contractor shall provide a Quality Control Plan (QCP) with the technical proposal, prior to contract award. The general Quality Control Plan must demonstrate how the contractor will assure quality meets the requirement and specifications of the contract. It shall specify how quality will be monitored to assure the performance standards are met; the supervision of crew(s) and work; and the personnel that will be performing the quality control. Quality control includes the monitoring of quality while work is in progress.
| E.2.1. |
| Plot Inspections. The contractor shall maintain a plot system as specified in Section See Section F. |
| E.2.2. |
| Contractor shall provide written inspection data for each planting unit that meets |
contract requirements.
| E.2.3. |
| All contractor inspection records shall be provided to the Government based on the |
schedule proposed by the contractor and agreed to by the Contracting Officer for quality assurance assessment consistent with the Government Quality Assurance Surveillance Plan. All records shall be signed and dated by the person who conducted the inspection.
F.1. INSPECTION AND ACCEPTANCE:
| F.1.1. |
| Inspection Procedures. Inspection of the work performed under this contract shall be made by the Government as the planting progresses. |
| F.1.2. |
| The COR shall check inspection records maintained by the contractor for compliance with planting specifications and care and handling of seedlings. |
| F.1.3. |
| The COR shall inspect the planting operation to ensure that all of the technical specifications are being followed and complete a bi - weekly “Performance Assessment Form” on the contractor’s operations. (See Section G and Attachment 4 Forms |
| F.1.4. |
| All contract areas will be sampled on a grid system. Sampling will consist of 1/100th acre plots to determine the total number of properly and improperly planted seedlings within the sample plots. Plots will be taken at the minimum rate of (1) per (2) contract acres or approximately (310) feet apart on a grid basis over the entire area. The total average number of planted seedlings per acre will be determined by adding the total number of correctly planted trees per plot plus the total number of improperly planted trees per plot, dividing by the stand acres and multiplying by 100 (1/100th acre plot). |
Total Number (correct + incorrect) planted, - Divided by (#) of plots (stand acres) x 100 = Total Planted Per Acre (See Section G and Attachment 4 Forms)
| F.1.5. |
| Contractor Self - Inspection. The contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the contractor shall |
be maintained and made available to the Government during contract performance upon their request. Contractor shall install a series of plots in order to thoroughly cover sites being planted. Contractor shall use the 1/100th acre plot inspection system consistent with Government inspection procedures as noted in Section F. The contractor shall document all self-inspection with Government furnished inspection forms. (See Section G and Attachment 4 Forms)
| F.1.6. |
| Reinspection. The contractor may request reinspection of a site, and that request shall be, in writing, within five days after receipt of initial inspections results. If the results of the reinspection are within (5%) of the original inspection, the contractor shall pay for all reinspection costs. Contractor shall be paid at the reinspection percentage rate, (See Section G and Attachment 4 Forms) |
| F.1.7. |
| Acceptance. The specified number of seedlings planted per acre must be properly planted, to receive 100% payment of bid price. Natural seedlings (seedlings not planted by the contractor) shall not be considered in taking plots. |
| F.1.8. |
| Replanting. If the percentage of planting quality for any sub item falls below 90% due to insufficient number of properly planted trees, the contractor may be allowed to replant the site in order to achieve a higher planting quality percentage. Replanting will be subject to the availability of seedling stock and shall be requested by the contractor. Replanting, if allowed, shall be done a maximum of one time. |
G. 1. MEASUREMENT AND PAYMENT:
| G.1.1. |
| Method of Measurement. All acreage listed in the bid schedule was determined by |
Global Positioning (GPS - Global Positioning System) and for the purpose of this contract is considered actual acreage and not an estimate. Any acreage added or deleted under the changes clause of the contract will be measured using the above described method. Number of acres satisfactorily planted will be determined as stated in Section F.
| G.1.2. |
| Basis of Payment. Payment will be made at a rate up to but not to exceed unit bid price for each site accepted as satisfactorily completed by the contractor. |
| G.1.3. |
| Deductions from the unit price bid will be made for inadequate quantity of properly |
planted seedlings and / or lost or "waste" seedlings as follows:
(See Section G and Attachment 4 Forms
G.1.4. Deduction for Inadequate Quantity of Properly Planted Seedlings Item(s) 0001 - 0004
To receive 100% of the unit price bid, contractor must properly plant the number of plantable trees specified below. The Government may accept lesser quantities, at their option at the payment rates shown below.
Number of Properly Planted Seedlings / Acre of Unit Bid Price Item(s) 0001 - 0002
Payment Percent
| 482 – 500 |
| 100.0% |
| 474 – 481 |
| 97.5% |
| 466 – 473 |
| 95.0% |
| 458 – 465 |
| 92.5% |
| 450 – 457 |
| 90.0% |
| < = 449 |
| FAILURE |
Number of Properly Planted Seedlings /Acre of Unit Bid Price Item(s) 0003 - 0004
Payment Percent
| 653 - 670 |
| 100.0% |
| 636 - 652 |
| 97.5% |
| 620 - 635 |
| 95.0% |
| 603 - 619 |
| 92.5% |
| 583 - 602 |
| 90.0% |
| < = 582 |
| FAILURE |
Item(s) 0001 – 0002 (bare root / containerized longleaf) the maximum allowable number of seedlings per acre is (550). Any seedlings planted above this amount will be counted as "waste" seedlings.
Item(s) 0003 – 0004 (bare root / containerized loblolly and shortleaf) the maximum allowable number of seedlings per acre is (757). Any seedlings planted above this amount will be counted as "waste" seedlings. If the quality of work falls below 90% work will be considered unacceptable and will be rejected in accordance with Section F.1, Inspection, and Acceptance.
G.1.5. Deduction for lost or "Waste" seedlings. Value of plantable seedlings lost, damaged, discarded or otherwise improperly used, will be based on the price that the Government paid for the seedlings, at the time of planting.