SF30- Amendment 1 Provides revisions to the solicitation pkg specifications and drawings Includes site visit attendee list and Q A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QandA.pdf | ||
| Attendee_Listing_Site_Visit_MINCEY.pdf | ||
| DB_Wage_Det_SC50_Heavy.pdf | ||
| Project_Specs.pdf | ||
| Project_Drawings.pdf | ||
| AG-4639-S-15-0018_Mincey_WRP_Restoration.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-4639-S-15-0018
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
NRCS-SC-124639
COLUMBIA SC 29201
SUITE 950
1835 ASSEMBLY ST
USDA-NRCS-SOUTH CAROLINA STATE OFC
07/10/2015000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/10/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide changes to sections of the solicitation package, construction specifications, and construction drawings. See attached Continuation
Sheet for detailed information on revisions.
This amendment also provides the Site Visit Attendee listing and Question & Answers resulting from the Site Visit held on July 23, 2015.
The Bid Due Date is Revised to Thursday, August 20, 2015 at 3:00pm (est).
All other terms remain unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
AMY STONEBRAKER
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
CONTINUATION SHEET
Amendment No. 1
MINCEY WRP Restoration Solicitation No. AG-4639-S-15-0018
1. SF-1442 Block 10 and Block 13 are Revised. Replace page 1 of the SF-1442 with Amendment 1- Revised version.
2. Section B- Supplies or Services and Price/Costs Schedule is replaced in its entirety. Please replace with Amendment No. 1- Revised version.
3. Performance time is increased by 17 days. Revised performance time is 78 calendar days.
4. Section C- Description/Specifications/Statement of Work is revised in its entirety. Please replace original page with Amendment 1- Revised page.
5.
Section J- List of Attachments, Construction Specifications is revised in its entirety. Please replace with Amendment 1- Revised page.
6.
Please delete the following Items of Work sections relating to Construction Specifications and replace with the Amendment 1-Revised pages as follows:
a. Construction Specification 2 – Clearing & Grubbing, Section 7
b. Construction Specification 3 – Structure Removal, Section 7
c. Construction Specification 21 – Excavation, Section 10
d. Construction Specification 25 – Rockfill, Section 10
e. Construction Specification 95 - Geotextile
7.
Please delete the existing drawing Sheets 2, 3, 4 and 5; replace with the Amendment 1-Revised sheets 2, 3, 4 and 5.
All other terms and conditions remain unchanged.
End Continuation Sheet
Section F- Deliveries or Performance at FAR 52.211-10 is revised. Replace original page with Amendment 1- Revised page
7.
8 Section L at L.5- Bid Due Date is revised. Replace original page with Amendment 1- Revised page
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
752130
USDA-NRCS-SOUTH CAROLINA STATE OFC
1835 ASSEMBLY ST
SUITE 950
COLUMBIA SC 29201
NRCS-SC-124639
AMY STONEBRAKER 304-284-7557
107/10/2015
AG-4639-S-15-0018
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
The work to be performed under this contract is the construction of rock crossings at fourteen sites, road repairs at six sites and the construction of a new access road. The crossings are located on existing roadbeds. The roadbed will be excavated to natural channel elevation for the length specified. The road slopes will be 10 to 1. The bottom and slopes of the crossings will be covered with geotextile, geo-cell, and 6 inches of rock fill. The road repairs are located on existing roadbeds. Rock fill with geotextile will be added at specified locations to the existing access road for road repair. The construction of the new access road will require clearing. The new access road will require rock fill with geotextile and geogrid. Areas disturbed during construction shall be seeded.
The Mincey Wetland Reserve Program Restoration Project is located in Horry County, South Carolina.
The estimated price range for this project is between $100,000 and $250,000. The required performance time is 61 calendar days.
A Site Showing will be held for this project on Thursday, July 23, 2015 @ 9:30am.
Interested parties will meet at the Horry County Service Center located at 1949
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
5 61 calendar days and complete it within ________________ ________________ calendar days after receiving
Section F, FAR 52.211-10
08/20/2015
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
Amendment 1- Revised
1 | P a g e
Amendment No. 1- Revised
AG-4639-S-15-0018
MINCEY WRP Restoration
PART I –
SECTION B- SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE
Mincey WRP, Horry County, South Carolina
B.1 BID SCHEDULE
Item Work Spec. No. Quantity Unit Unit Price Amount
1. Mobilization 8 1 Job $XXXXXXX $
2. Construct Crossing 1 21 1 Job $XXXXXXX $
3. Construct Crossing 2 21 1 Job $XXXXXXX $
4. Construct Crossing 3 21 1 Job $XXXXXXX $
5. Construct Crossing 4 21 1 Job $XXXXXXX $
6. Construct Crossing 5 21 1 Job $XXXXXXX $
7. Construct Crossing 6 21 1 Job $XXXXXXX $
8. Construct Crossing 7 21 1 Job $XXXXXXX $
9. Construct Crossing 8 21 1 Job $XXXXXXX $
10. Construct Crossing 9 21 1 Job $XXXXXXX $
11. Construct Crossing 10 21 1 Job $XXXXXXX $
12.
Construct Crossing 11
Job $XXXXXXX $
13.
Construct Crossing 12
14.
Construct Crossing 13
15.
Construct Crossing 14
16.
Road Repair 1
17.
Road Repair 2
18.
Road Repair 3
19.
Road Repair 4
20.
Road Repair 5
2 | P a g e
AG-4639-S-15-0018
MINCEY WRP Restoration
21. Road Repair 6 25 1 Job $XXXXXXX $
22. Construct Access Road 25 1 Job $XXXXXXX $
23. Seeding 6 1.5 Acre
$XXXXXXX $
B.2 One award for the aggregate of all items will be made under this solicitation.
B.3 Total Performance Time for this Bid Schedule is 78 calendar days.
B.4 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract.
Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
Quantities marked with an * above are estimated quantities and the clause FAR 52.211-18, 52.211-18 Variation in Estimated Quantity, applies.
MINCEY WRP Restoration
SECTION C
DESCRIPTION / SPECIFICATIONS / STATEMENT OF WORK
The work to be performed under this contract is the construction of rock crossings at fourteen sites, road repairs at six sites and the construction of a new access road. The crossings are located on existing roadbeds. The roadbed will be excavated to natural channel elevation for the length specified. The road slopes will be 10 to 1. The bottom and slopes of the crossings will be covered with geotextile, geo-cell, and 6 inches of rock fill. The road repairs are located on existing roadbeds. Rock fill with geotextile will be added at specified locations to the existing access road for road repair. The construction of the new access road will require clearing. The new access road will require rock fill with geotextile and geogrid.
Areas disturbed during construction shall be seeded.
C.1 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C.2 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS
(FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
3 | P a g e
Amendment No. 1- Revision
20 | P a g e
MINCEY WRP Restoration
SECTION F
DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html
NUMBER TITLE DATE
52.242-14 SUSPENSION OF WORK APR 1984
F.2 THE FOLLOWING CLAUSES ARE INCORPORATED IN FULL TEXT
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 78 calendar days. The time stated for completion shall include final cleanup of the premises.
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS. (APR 1984)
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
http://www.arnet.gov/far/
28 | P a g e
MINCEY WRP Restoration
LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
J.1 LIST OF ATTACHMENTS
ATTACHMENT TITLE NO. OF PAGES
Davis Bacon Wage Determinations:
Horry County, SC – SC50, Heavy, Mod 1, Dated 05/22/2015 4
2 Construction Drawings (see below) 6 3 Construction Specifications (see below) 35
Construction Specifications
Specification Number Title Number of Pages 2 Clearing and Grubbing 2 3 Structure Removal 2 5 Pollution Control 3 6 Seeding, Sprigging, and Mulching 4 8 Mobilization and Demobilization 1
11 Removal of Water 2 21 Excavation 4 25 Rockfill 4 95 Geotextile 2
Material Specifications
Drawings
Description Drawing Number Site Location Highway Map 1 Crossings Location Map 2 Typical Crossing Detail 3 Access Road/Road Repair Location Map 4 Typical Road Repair Location Map 5
Specification Number Title Number of Pages 592 Geotextile 3
40 | P a g e
AG-4639-S-15-0018 MINCEY
WRP Restoration
L.4 BID SUBMISSION INSTRUCTIONS
Bidders should review all solicitation provisions and in particular 52.214-5, -7, and -18 when preparing their bid. As a reminder, in addition to any other requirements in this solicitation, contractors are reminded to:
1. Complete the bid schedule at Section B by entering a price for all line items.
2. Submit the required bid guarantee on an SF 24, Bid Bond (see provision 52.288-1).
3. Signed and dated bid (SF 1442, Block 20a, b and c).
4. Acknowledge amendments issued (if any) (SF 1442, Block 18).
5. Complete all other representations and certifications required by Section K and not already completed in the System for Award Management (SAM).
6. Bidders are asked to provide evidence of registration in SAM and that status is “Active”.
L.5 BID DUE DATE
A public bid opening for this solicitation will be held on Thursday, August 20, 2015 at 3:00 pm (Local Time). The location of the public bid opening will be at the following address:
USDA NRCS West Virginia State Office 1550 Earl Core Road, Suite 200
Morgantown, WV 26505
Bids may be sent via Federal Express, United Parcel Service or Express Mail (USPS).
Emailed or faxed quotes will not be accepted.
If mailing your bid, make sure you allow enough time for delivery by the above deadline.
Documents sent late and received after the deadline stated above will be considered non responsive.
**Reference the Solicitation (AG-4639-S-15-0018, MINCEY WRP) on the outside of your package.
To mail your bid, send to the following location:
USDA NRCS West Virginia State Office A t t n : A m y S t o n e b r a k e r , C o n t r a c t i n g O f f i c e r
1550 Earl Core Road, Suite 200 Morgantown, WV 26505
Mincey WRP 2-2 July 2015 NRCS-South Carolina Horry County
Construction Specification 2— Clearing and Grubbing, Section 7
7. Items of work and construction details Items of work to be performed in conformance with this specification and construction details therefore are:
A. Subsidiary Item, Clearing and Grubbing
1. This item shall consist of any clearing and grubbing necessary to excavate the sections of the existing roadway to construct the crossings and the removal of any trees within 20 feet on either side of the crossing as directed by NRCS. This item shall include any trees required to be removed to allow disposal of the debris and excavated roadway material.
This item shall include grubbing, tree and debris removal required for the construction of the new access road. This item shall include any trimming of tree limbs along the existing access roads necessary to widen the road for the passage of construction equipment.
2. Clearing and grubbing debris shall be placed in the upland woods adjacent to the work site in such a manner that vehicular travel and water flow are not impeded. Clearing and grubbing debris shall not be placed in the wetland. The wetland boundary will be marked by the NRCS inspector.
3. The clearing and grubbing extents shall be the top and side slopes of the roadway along the length of each crossing. See Drawing 3 of 3 for the length of each crossing. Clearing extents shall be within 20 feet on either side of the length of the crossing. The clearing and grubbing extents of the construction of the new access road shall be a maximum of 25 feet wide along the total length of the center line of the access road.
4. Clearing and grubbing is made subsidiary to the bid item under which the work is performed. All compensation for clearing and grubbing necessary to install the crossings shall be considered as included in the lump sum bid price for Bid Items 2 - 15, Construct Crossings.
5. Clearing and grubbing is made subsidiary to the bid item under which the work is performed. All compensation for clearing and grubbing necessary to install the crossings shall be considered as included in the lump sum bid price for Bid Item 22, Construct Access Road.
- END OF CONSTRUCTION SPECIFICATION 2 -
Mincey WRP 3-2 July 2015 NRCS-South Carolina Horry County
Construction Specification 3 – Structure Removal, Section 7 therefore are:
A. Subsidiary Item, Structure Removal
1. This item shall consist of the removal of any existing culverts beneath the footprint of all crossings.
2. All culverts that are removed shall be hauled to an acceptable disposal site approved by the Engineer.
3. Structure removal is made subsidiary to the bid item under which the work is performed.
All compensation for structural removal necessary to install the crossings shall be considered as included in the lump sum bid price for Bid Items 2 - 15, Construct Crossings.
- END OF CONSTRUCTION SPECIFICATION 3 -
Mincey WRP 21-4 July 2015 NRCS-South Carolina Horry County
Construction Specification 21 – Excavation, Section 10
10. Items of work and construction details therefore are:
A. Bid Items 2 - 15, Construct Crossing
1. This item shall consist of excavating a section of roadway to natural floodplain channel elevation, then placing geotextile and geocell material, and rockfill to form a crossing as shown in the drawings. The excavated slopes of the crossing shall be a minimum of 10 to
1. The bottom length and elevations are not the same for each crossing. See Drawing 3 of 3 for a listing of these dimensions for each crossing. The elevations listed in Drawing 3 of 3 are based on the temporary bench mark established for each crossing. Please see the list of TBMs for the description and elevation of the TBM established at each crossing location.
2. All roads on the site damaged by construction equipment shall be repaired to the same condition as before construction or better and seeded.
3. No blasting is required in this contract.
4. All excavation is classified as common excavation. Material excavated may be placed on the shoulders of the roadway and on the surface of the roadway if the material is suitable.
Excavated material shall be smoothed and shaped to match existing topography.
5. Furnishing and installing geotextile and geocell is made subsidiary to this bid item. See Construction Specification 95 for details. All compensation for furnishing and installing geotextile to construct the crossings shall be considered as included in the lump sum bid price for Bid Items 2 - 15, Construct Crossing.
6. Furnishing and installing rockfill is made subsidiary to these bid items. See Construction Specification 25 for details. All compensation for furnishing and installing rockfill to construct the crossings shall be considered as included in the contract lump sum bid price for Bid Items 2 - 15, Construct Crossing.
7. Furnishing and installing rock riprap along the upstream and downstream edges of the crossings is made subsidiary to these bid items. See Construction Specification 61 for details. All compensation for furnishing and placing the rock riprap shall be considered as included in the lump sum bid price for Bid Items 2 – 15, Construct Crossing.
8. Pollution Control is made subsidiary to these bid items. See Construction Specification 5 for details. All compensation for pollution control to construct the crossings shall be considered as included in the lump sum bid price for Bid Items 2 - 15, Construct Crossing.
9. Removal of Water is made subsidiary to these bid items. See Construction Specification 11 for details. All compensation for removal of water to construct the crossings shall be considered as included in the lump sum bid price for Bid Items 2 - 15, Construct Crossing.
10. Clearing and Grubbing is made subsidiary to these bid items. See Construction Specification 2 for details. All compensation for clearing and grubbing necessary to construct the crossings shall be considered as included in the lump sum bid price for Bid Items 2 - 15, Construct Crossing.
11. Structure Removal is made subsidiary to these bid items. See Construction Specification 3 for details. All compensation for structure removal necessary to construct the crossings shall be considered as included in the lump sum bid price for Bid Items 2 - 15, Construct
Mincey WRP 21-5 July 2015 NRCS-South Carolina Horry County
Crossing.
12. Measurement and payment shall be by the method stated in Section 9 of this specification.
All compensation for constructing the crossings shall be considered as included in the lump sum bid price for Bid Items 2 - 15, Construct Crossing.
B. Subsidiary Item, Access Road
1. This item shall consist of grading and shaping the access road as necessary to enable construction vehicles to travel on it. Low areas may require grading and shaping to drain water and dry. Fill material may be added to the low areas on the access road as approved by the NRCS inspector.
2. The roads are not required to be improved under this item; only work to allow access of construction equipment and to repair any areas damaged by construction traffic. All roads on the site damaged by construction equipment shall be repaired to the same condition as before construction or better. If rocks are added to the road, a geotextile must first be placed prior to placement of rock.
3. All roads disturbed by construction activities shall be seeded. See Construction Specification 6 for details.
4. Access road work is made subsidiary to the bid item under which the work is performed.
All compensation for access road work necessary to allow construction equipment traffic or to repair roads damaged by construction traffic shall be considered as included in the lump sum bid price for Bid Items 2 - 15, Construct Crossings.
- END OF SPECIFICATION 21 -
Mincey WRP 25-2 July 2015 NRCS-South Carolina Horry County
Construction Specification 25 – Rockfill, Section 10
10. Items of work and construction details therefore are:
A. Subsidiary Item, Rockfill
1. This item shall consist of furnishing and installing rockfill in the geocell material over the geotextile to form the crossings. Rockfill shall be a minimum of 6 inches deep in the cells of the geocell on top of the geotextile. The top elevation of the rockfill shall be the bottom elevation specified in Drawing 3 of 3.
2. Rockfill shall be Class No. 4 as specified by AASHTO standard specification for transportation materials (commonly referred to as railroad ballast). The gradation for such rock is as follows:
Sieve Size or Designation (inch)
Weight Passing For Aggregate (percent)
2” 100 1 1/2” 90 - 100
1” 20 - 55 3/4” 0 - 15 3/8” 0 - 5
3. The rock shall be placed in the geocell cells evenly on the geotextile in a method that does not cause damage to the geocell material nor wrinkling of the geotextile. No torn or damaged material will be accepted.
4. All roads on site damaged by hauling equipment shall be repaired to the same condition as before construction or better and seeded.
5. Furnishing and installing the rockfill is made subsidiary to the bid item where the work is performed. All compensation for furnishing and installing the rockfill shall be considered as included in the contract lump sum price for Bid Items 2 - 15, Construct Crossings.
B. Bid Items 16-21, Road Repair
1. This item shall consist of furnishing and installing rockfill over the geotextile to form the road repairs. Rockfill shall be a minimum of 6 inches deep on top of the geotextile. The repair sections shall conform to the typical cross-sections shown in Drawing 5 of 5.
Approximate dimensions for each road repair is listed in the table in Drawing 5 of 5.
2. Rockfill shall be Class No. 2 as specified by AASHTO standard specification for transportation materials.
Weight Passing For Aggregate (percent)
Mincey WRP 25-3 July 2015 NRCS-South Carolina Horry County
(inch) 3” 100
2.5” 90 - 100 2” 35 - 75
1.5” 0 - 15 ¾” 0 - 5
3. Rockfill shall be compacted by Method III, as listed in Section 7.
4. Bedding shall be compacted by Method III, as listed in Section 8.
5. All roads on site damaged by hauling equipment shall be repaired to the same or better condition as before construction.
6. Furnishing and installing geotextile is made subsidiary to this bid item. See Construction
Specification 95 for details. All compensation for furnishing and installing geotextile to repair the road in the designated locations shall be considered as included in the bid price for Bid Items 16-21, Road Repair.
7. Excavation is made subsidiary to this bid item. See Construction Specification 21 for details. All compensation for excavation to repair the road in various locations shall be considered as included in the bid price for Bid Items 16-21, Road Repair.
8. Pollution Control is made subsidiary to this bid item. See Construction Specification 5 for details. All compensation for pollution control shall be considered as included in the bid price for Bid Items 16-21, Road Repair.
9. Removal of Water is made subsidiary to this bid item. See Construction Specification 11 for details. All compensation for the removal of water necessary to repair the road shall be considered as included in the bid price for Bid Items 16-21, Road Repair.
10. Clearing and Grubbing is made subsidiary to this bid item. See Construction Specification 2 for details. All compensation for the clearing and grubbing necessary to repair the road shall be considered as included in the bid price for Bid Items 16-21, Road Repair.
11. Measurement and payment shall be by the method stated in Section 9 of this specification. All compensation for road repair shall be considered as included in the contract bid price for Bid Items 16-21, Road Repair.
C. Bid Item 22, Construct Access Road
1. This item shall consist of clearing a footprint for a new access road, shaping the subgrade, and furnishing and installing rockfill over the geotextile and geogrid to form the new access road. The maximum footprint to be cleared is 25 feet by 425 feet. The new access road shall conform to the typical cross section as shown in Drawing 5 of 5.
2. Rockfill shall be Class No. 2 as specified by AASHTO standard specification for transportation materials.
(inch)
Weight Passing For Aggregate (percent)
3” 100
Mincey WRP 25-4 July 2015 NRCS-South Carolina Horry County
2.5” 90 - 100 2” 35 - 75
1.5” 0 - 15 ¾” 0 - 5
3. Rockfill shall be compacted by Method III, as listed in Section 7.
4. Bedding shall be compacted by Method III, as listed in Section 8.
5. All roads on site damaged by hauling equipment shall be repaired to the same or better condition as before construction.
6. Furnishing and installing geotextile is made subsidiary to this bid item. See Construction
Specification 95 for details. All compensation for furnishing and installing geotextile to repair the road in the designated locations shall be considered as included in the bid price for Bid Item 22, Construct Access Road.
7. Excavation is made subsidiary to this bid item. See Construction Specification 21 for details. All compensation for excavation to repair the road in various locations shall be considered as included in the bid price for Bid Item 22, Construct Access Road.
8. Pollution Control is made subsidiary to this bid item. See Construction Specification 5 for details. All compensation for pollution control shall be considered as included in the bid price for Bid Item 22, Construct Access Road.
9. Removal of Water is made subsidiary to this bid item. See Construction Specification 11 for details. All compensation for the removal of water necessary to repair the road shall be considered as included in the bid price for Bid Items 22, Construct Access Road.
10. Clearing and Grubbing is made subsidiary to this bid item. See Construction Specification 2 for details. All compensation for the clearing and grubbing necessary to repair the road shall be considered as included in the bid price for Bid Item 22, Construct Access Road.
11. Measurement and payment shall be by the method stated in Section 9 of this specification. All compensation for road repair shall be considered as included in the contract bid price for Bid Item 22, Construct Access Road.
- END OF CONSTRUCTION SPECIFICATION 25 –
Mincey WRP 95-2 July 2015 NRCS-South Carolina Horry County
Construction Specification 95 – Geotextile, Section 7
Items of work to be performed in conformance with this specification and construction details therefore are:
A. Subsidiary Item, Geotextile
1. This item shall consist of furnishing and installing geotextile beneath the rockfill and rock riprap to form the crossings as shown in Drawing 3 of 3, and furnishing and installing geotextile beneath the rockfill to form the road repairs and new access roads as shown in drawing 5 of 5.
2. The geotextile shall be Class 1, non-woven, needle punched.
3. The geotextile shall be installed on a smooth subgrade to cover the area beneath the rockfill.
4. The geotextile shall be placed mainly for road stabilization, as discussed in Section 5;
however it shall be orientated perpendicular to the roadway centerline. In addition, pins used to secure geotextile do not have to be removed for final installation, unless recommended by manufacturer.
5. The edges of the geotextile shall be keyed-in a minimum of one foot on each side. Sections of geotextile shall be overlapped a minimum of 24 inches at each joint.
6. Final surface of the geotextile shall be smooth with as few wrinkles as possible.
7. The geotextile installation shall be approved by the NRCS inspector before the rockfill is placed.
8. Furnishing and installing geotextile is made subsidiary to the bid items where the material is installed. All compensation for furnishing and installing geotextile shall be considered as included in the lump sum bid price for Bid Items 2 - 15, Construct Crossings, Bid Items 16-21, Road Repair and Bid Item 22, Construct Access Road.
B. Subsidiary Item, Geocell
1. This item shall consist of furnishing and installing geocell material to form the crossings as shown in Drawing 3 of 3.
2. The geocell material shall consist of strips of high-density polyethylene, connected by spot weld seams running the entire height of the strip. The interconnected strips shall form the walls of the flexible, three-dimensional cellular confinement structure when expanded. The polyethylene used in the strips shall have a density of 0.935 – 0.965 g/cm3 (58.4 – 60.2 lb/ft3) tested per ASTM D1505. The polyethylene shall have a homogeneously distributed carbon black content of 1.5 – 3.0% for ultra-violet light stabilization. The seam tensile strength shall be a minimum of 338 lbs (6” section) for the cell height. The strip thickness shall be 1.27 mm tested as per ASTM D5199. The nominal size for sheets of geo-cell material shall be 8 ft X 20 ft when expanded.
3. The geocell sections shall be installed edge to edge with no overlap required. The geocell material shall be anchored and joined according to the manufacturer’s recommendations.
4. The geocell material shall be filled with rockfill as appropriate to prevent collapsing of
Mincey WRP 95-3 July 2015 NRCS-South Carolina Horry County the cells. See Construction Specification 25 for details of the rockfill.
5. All compensation for furnishing and installing the geocell material shall be included in the lump sum bid price for Bid Items 2 – 15, Construct Crossings.
C. Subsidiary Item, Geogrid
1. This item shall consist of furnishing and installing the geogrid material on top of the geotextile and beneath the rockfill to form the new access road as shown in Drawing 5 of 5.
2. The geogrid material shall be a biaxial geogrid made from polypropylene that meets the following properties: minimum aperture size – 1.0 inches, ultimate tensile strength – 850 pounds per foot, tensile strength at 5% strain – 580 pounds per foot, resistance to ultraviolet degradation – 70%. The material shall be manufactured and distributed by companies willing to guarantee their products through documentation submitted for review and approval and provide necessary on-site technical installation support.
3. Width of the geogrid material shall be approximately 13 feet. The geogrid material shall be laid evenly on the geotextile as directed by the Inspector and anchored according to the manufacturer’s recommendations.
4. Rockfill shall be placed on the geogrid as specified in the manufacturer’s recommendations. See Construction Specification 25 for details of the rockfill.
5. Only material in new condition will be used for this project and the quality shall be assessed as stated in Section 2.
6. Repair of any geogrid damaged during installation shall be completed as specified according to the manufacturer’s directions/specifications.
7. Furnishing and installing the geogrid material is made subsidiary to the bid item where the material is installed. All compensation for furnishing and installing geogrid shall be considered as included in the payment for Bid Item 22, Construct Access Road.
- END OF CONSTRUCTION SPECIFICATION 95 -
Mincey WRP Drawing 2 of 5 July 2015 NRCS-South Carolina Horry County
5Mincey WRP Drawing 3 of 5 July 2015
Mincey WRP Drawing 4 of 5 July 2015
Mincey WRP Drawing 5 of 5 July 2015