ATT2_SAMPLE_SOW_-_Laborer.docx

DOCX document 21 KB Posted

Attached to
INDEFINITE DELIVERY INDEFINITE QUANITY TEMPORARY PERSONNEL STAFFING CONTRACT FOR VARIOUS LOCATIONS IN THE EASTERN ADMINISTRATIVE ZONE
Solicitation number
AG-4568-S-15-0028
Issued by

About this file

Sample Statement of Work 1

View the file

Other files

File Type Posted
AMD_004.pdf PDF
AMD_003.pdf PDF
Amd_002_Pkg.pdf PDF
AMD001_SF30.pdf PDF
ATT4_HISTORICAL_DATA.docx DOCX document
ATT2_Sample_SOW_General_Clerk.docx DOCX document
ATT2_Sample_SOW-_Engineer_Tech.docx DOCX document
ATT1_Sample_SCA_Wages.docx DOCX document
ATT3__EXP_QUEST.doc DOC document
ATT1_Sample_Forestry_Wages.docx DOCX document
RFQ_SF1449.pdf PDF
IDIQ_Temp_Staffing_RFQ.docx DOCX document
ATT5_Clarifications.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAMPLE SOW

GROUNDS MAINTENANCE AND GENERAL LABORER

STATEMENT OF WORK

LOCATION

Asheville, NC

1.1 General

The customer has a requirement for a Grounds Maintenance Laborer to support the Engineering Group.

1.2 Duties

General Grounds Maintenance which includes but are not limited to mowing, edging, removing brush, etc. Mowing will be performed on riding and push mower.

Facility Maintenance Laborer which includes but are not limited to changing light bulbs, moving furniture, minor repairs, etc.

Work will be performed for up to 8 hours per day. Services will be invoiced on a per day basis consisting of 8 hours.

2.0 FACILITIES, SUPPLIES, AND SERVICES

The Government will provide all related equipment necessary to accomplish the assigned tasks when the contractor is working.

3.0 SAFETY RESPONSIBILITIES INCLUDE:

· Perform work with safety criteria incorporated.

· Maintain a safe working environment and wearing of appropriate safety equipment.

· Notify Engineering of any safety issues found while performing work.

Performance MeasuresPerformance Standards
a) QualityPer direction of the COR
b) TimelinessWithin 1 days of the date
established by the COR
c) CostPrice of work performed

4.0 GOVERNMENT PROVIDED EQUIPMENT, SUPPLIES, MATERIALS

The equipment and supplies provided to the Contractor by the Government shall be used in a safe manner and returned to the Government after each use in the same condition that it was provided to the Contractor in.

5.0 GOVERNMENT POINT OF CONTACT

The Government technical point of contact shall be _______________________.

ATTACHMENT 02

File details come from the government source that posted it. Updated .