Pre-Bid meeting presentation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD 004 ATT7_PISGAH_SPRING_2012.xlsx | XLSX spreadsheet | |
| SF30 AMD4.pdf | ||
| AMD 004 Section C-6 Revised.docx | DOCX document | |
| AMD 004 Section 5.3.docx | DOCX document | |
| AMD 004 ATT7_GRD_SPRING_2012.xlsx | XLSX spreadsheet | |
| AMD 004 PRS_2012.pdf | ||
| AMD002_Prebid Meeting Q and A.docx | DOCX document | |
| ATT1 SCA GRANDFATHER.docx | DOCX document | |
| ATT7_GRD_SPRING_2012.xlsx | XLSX spreadsheet | |
| SF30.pdf | ||
| PreBid Signin Sheets.pdf | ||
| ATT3_PRS.pdf | ||
| 0001.pdf | ||
| SF1449_RFQ.pdf | ||
| Reference Items.docx | DOCX document | |
| District Roads.zip | ZIP file | |
| OF_347.pdf | ||
| ATTACHMENT 1 WAGE RATES.zip | ZIP file | |
| ATTACHMENT 2 POTENTIAL LINE ITEMS.docx | DOCX document | |
| ATTACHMENT 4 REFER_SAMPLE FORMS.zip | ZIP file | |
| OF_347 pg2.pdf | ||
| ATTACHMENT 5 EXPER QUEST.docx | DOCX document | |
| ATTACHMENT 6 PAST PERFORM QUEST.docx | DOCX document | |
| ATTACHMENT 7 INITIAL TASK ORDERS.zip | ZIP file | |
| RFQ_body.docx | DOCX document | |
| Contract General Specifications.docx | DOCX document | |
| PRS.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREBID MEETING
SOLICITATION
AG-4568-S-12-0022
MULTI-AWARD IDIQ ROAD
MAINTENANCE CONTRACTS
FOR NFNC
March 7, 2012
Known Problems/Inconsistencies
• The Service Wage Rates file is corrupt for the Grandfather District. When offered the chance to recover available information, it appeared that all the information is there.
• The Schedule of Items for the Appalachian District erroneously consists of two pages. Disregard the page that requests pricing for “Spring Additional Bid Items”
• There are two downloadable files that comprise Attachment 3; the files listing all “District Roads.zip” and the “Contract General Specifications.docx”.
Contractural Legal-Beagle Stuff
Government POC s
For the Proposal period:
Karen Welch, Contracting Officer
828-257-4323 karenwelch@fs.fed.us
Cliff Northrop, Technical Representative
828-257-4234 cnorthrop@fs.fed.us mailto:karenwelch@fs.fed.us mailto:cnorthrop@fs.fed.us
QUOTES
• Quotes are due no later than Tuesday, 20 March 2012, at 2:00 PM EST
This procurement is a set aside
100% for Small Business
(Size Standard is $33.5M)
• Quotes can be faxed to 828-257-4876 Attn:
Karen Welch,
• emailed to karenwelch@fs.fed.us,
• Mailed, Fed Ex or UPS to the address in Block 9 of the SF 1449 Attn: Karen Welch.
Attachment 6 Past Performance Questionnaire (PPQ)
• MUST be faxed in by the reference, not the Contractor.
• Any PPQ’s that are received with your quotation package or faxed from your office cannot be evaluated.
• PPQ’s must be received by Karen Welch on or before close of business 13 March 2012.
• Fax # 828-257-4876
QUESTIONS
• All questions must be submitted in writing to the Contracting Officer.
• The technical questions should identify the specifications and or drawings that the question is referring to.
• An amendment will be issued with all the questions and answers on Thursday, March
15. No questions will be answered after March 15 unless it is a minor clarification.
Resultant Contracts
• This Requirement is for the award of Multi Indefinite Delivery Indefinite Quantity Road Maintenance Contracts (IDIQ) on 7 separate Ranger Districts.
• The 7 District locations are referenced on page 5 of the RFQ. Work to be performed under the resulting contract will include all aspects of Road Maintenance work.
Resultant Contracts (cont)
• Potential road maintenance work line items are in Attachment 2.
• In addition, there may be up to $30,000 of construction work that may be ordered on the road maintenance task order.
• No bonds will be required. However, payrolls (WH-347) and SF-1413 (for subcontractors) will be required on the task orders that contain construction work.
Each IDIQ Contract
• Each IDIQ contract will consist of a base year and 4 option years.
• The minimum guarantee is $2,500.00 for each IDIQ contract that is awarded.
• If you are awarded 3 IDIQ contracts you will have a Min Guarantee on each one.
• A Contractor’s performance must be in good standing for the Government to exercise it’s option in future years.
Task Orders
• The minimum amount ordered on any Task Order will be $2,000 and the maximum amount allowed by the contract is $500,000.
Quotation Packages
• Page 50 – 52 of the RFQ explains the items that the contractor needs to submit for each IDIQ contract that you want to be considered for.
• You can submit a complete package on all 7 districts, but 3 separate IDIQ contract awards is the maximum # a contractor can be awarded.
Caution: normal spring and fall grading periods for districts are concurrent and work must be done simultaneously.
Required Documents
• These documents are to be submitted as part of each package:
– SF1449, page 1-3, complete and sign page 1
– Page 4, Contractor information
– Page 1 of ORCA record or Section K, reps & certs, pages 36 – 45
– Attachment 5, Experience Questionnaire. Please limit experience to projects of similar type and scope.
Required Documents (cont)
• Quality Control Plan (pp 12, 52, and General Specifications Section C1.3)
• Attachment 7, Initial Task Order pricing, for each of the 7 Ranger Districts that you want to be considered for award of an IDIQ contract.
• All amendments issued must be acknowledged by the Contractor by completing and signing the lower left portion of the Standard form 30 and returning it with the quotation package.
CCR
• - CENTRAL CONTRACTOR REGISTRATION
• TO BE CONSIDERED AND AWARDED A
GOVERNMENT CONTRACT A CONTRACTOR
MUST HAVE AN ACTIVE ACCOUNT IN THE CCR
DATA BASE AS OF THE DATE QUOTES ARE DUE.
• NAICS CODE 237310 is required to be listed on your CCR record.
EVALUATION
• Contractors will be evaluated in accordance with FAR.212-2 of the solicitation (page 53).
• Evaluation Factors -
• Technical Ability and
• Price
Evaluation (cont)
• The Pricing and the Technical evaluations are evaluated by 2 different evaluation boards.
• The Technical board will not know the pricing when they do their evaluation.
• The Pricing Board will evaluate the initial task orders the Contractor submits.
Technical Ability
• Based on information provided on the
– Experience Questionnaire
– Past Performance Questionnaire
Contracts will be awarded to the Contractors based on what is the Best Value to the Government using an assessment based on a tradeoff between
Technical Acceptability and Price.
Technical Ability
• Sub Factors:
– Past Performance
– Relevant Experience – Performance of projects of the same size and scope
–Quality of Service/Control
– Timeliness of Performance
– Contract Management
– Geographical Proximity
– Quality Control Plan
Technical Evaluation Guide
• The guide for each element of the Technical Evaluation is on pages 55 - 58
Price
• Price will be evaluated on the submission of the initial task orders in Attachment 7 when compared to the Government Estimate and the other Offerors’ pricing for the same task order.
Award Determination
• After both boards have completed their separate evaluations, they will then meet and do a joint determination of which contractors are technically acceptable and has fair and reasonable pricing on the initial task order(s).
Awards
• The boards will then determine how many contractors to award a contract to for each District. This is based on amount of work anticipated for the district and how many contractors submitted packages for that District.
Initial Task Orders
• One of the IDIQ contractors chosen will be awarded the initial task order. The other IDIQ contractors will be awarded a task order for the minimum guarantee amount of $2,500.
This minimum guarantee task order cannot be invoiced for until a project has been awarded to the contractor, the project modified into that task order, and $2,500 worth of work is acceptably completed.
IDIQ CONTRACTORS
• Once the IDIQ contracts are awarded and in place, all IDIQ Contractors for that Location will be sent a Request for Pricing as new requirements for road maintenance work arise.
• All IDIQ Contractors are required to submit pricing on 100% of the Requests for Pricing the Government issues them for task order projects.
IDIQ CONTRACTORS (cont)
• Failure to submit 100% pricing will result in forfeiture of the minimum guarantee. If a contractor does not submit any pricing on projects the Government may elect not to exercise the next option year on the IDIQ contract to that Contractor.
QUOTATION PACKAGES
• Staple or clip each quotation package together.
• There is no need to send the quotation packages in a binder.
•QUESTIONS?
OK. Now, The Important Stuff.
Service or Construction?
• Maintenance (Service) and “Typical” work will consist of things that are required to use the road and usually are performed on a schedule; e.g.
grading, pulling ditches, and gravel placement.
• Maintenance (Service) may include things such as clearing trees downed by a storm, culvert cleaning, sign replacement, and minor slide removal.
• Construction may include culvert replacement, major fill slope slide repair, and road relocation.
Specifications
• Specifications for maintenance (Service) activities are included as a part of this solicitation. These are PERFORMANCE BASED and are described in Attachment 3, Contract General Specifications.
• Specifications for construction activities are from FP-03, modified by Supplemental Specifications.
• Other requirements or specifications will be included in Requests for Pricing for specific work.
Quality Control
• It is YOUR responsibility to ensure the contract requirements are met.
• Do not rely on the government’s inspections to tell you what needs to be done.
• Refer to the Performance Requirements Summary. These are the items we will use to determine if your work is acceptable.
Safety
• See Section C, Page 15.
• Signage conforming to the MUTCS is required.
• ANSI Class II vests are required.
Work Periods
• Section C, Page 16
• At least weekly: Advise the Inspector or COTR of your work schedule.
• Work hours are generally weekdays between dawn and dusk.
Work by the Prime
• Section I, Page 33
• The Prime Contractor must perform at least 30% of the work.
• Special camps or camping is not allowed. If public camping is allowed, then the contractor may camp, following the rules and regulations governing those camping areas.
Erosion, Sediments, Pollution
• Section I, Page 33
• Minimize erosion and sedimentation
• No controllable pollution is allowed.
• Protect water courses.
• More information about seeding a little later in the show.
Emergency Response
• Section I, Page 34
• Extinguish fires.
• You are liable for fires you cause.
• Notify the Government of any fires sighted around the work area.
• Government may use your equipment and employees for fire fighting. (not free)
Buy American Act
• Section L, Page 48
• Applies to Construction Materials
Pre-Proposal Conference
• Info is conveniently located on pages 49-50
• Submit questions in writing to CO 5 days prior
• Confirm verbal questions in writing
• Questions, answers, attendance list will be posted as an amendment. This powerpoint presentation will be posted.
• Verbal statements and/or responses don’t count.
Response Time
• Available within an hour during normal work hours
• Available within 2 hours after hours.
Quality Control Plan
• Attachment 3, Section C1.3 and C1.5
• Key control
• Inspection System-includes written documentation
• Methods to Identify and prevent defects
• Records to be Maintained On-site
• Reference each “Quality Standard” and the PRS
• Reference the PRS
• Reference the PRS
Meetings
• Typically occur after a day or two on the job.
• Make sure work is satisfactory prior to getting too far along with substandard work.
• As necessary, thereafter.
Access to Locked Roads
• Most if not all roads are open
• Speak to the District Representative or District Office about exceptions prior to making the trip.
• Obtain necessary key from District Office.
Government Furnished Gravel
• The ONLY thing we will think about providing as a part of this contract, unless otherwise stated in future task orders.
• If we supply gravel, the responsibility is ours to provide it in time and to tailgate spread it in front of grading operations.
• Contractor then grades the road per the contract without a cost change.
C-5.1 Grading Roads
• See Quality Standard (5.1.1) and the PRS
• Road drains completely
• Intersections are smoothly blended
• Ruts and potholes are ripped
• Rocks > 3” are gone
• No debris, trash unsuitable material exists
• Leaves and pine needles generated from work are spread over traveled way unless otherwise directed by the COTR.
C-5.2 Ditchwork
• See Quality Standard (5.2.1) and the PRS
• 1’ Deep plus 20’ Culvert Transitions.
• No Standing Water (except maybe on the
Croatan).
• Culvert Inlets are Clean.
• Road Prism is Uncut.
• Foreslope and Backslope are Clear.
• Silt Traps are Cleaned to Original Dimensions.
• Lead off Ditches Completely Drain.
• Wattles are Installed.
C-5.5 ABC or ABC(M)
• See Quality Standard (5.5.1) and the PRS
• Roadbed is Firm, Smooth, Finished, Including Turnouts.
• Compacted? It must be Firm.
• Road drains completely
• Intersections are smoothly blended
• Ruts and potholes are ripped
• Rocks > 3” are gone
• No debris, trash unsuitable material exists
• Leaves and pine needles generated from work are spread over traveled way unless otherwise directed by the COTR.
C-5.7 Equipment Rental
• The ONLY Specification that Requires Equipment Size or Capacity. These Equipment Descriptions are NOT Required for the Performance of Work Covered by Other Sections.
C-6 Task Overview
• Requirements of the Contract but Do Not Fit the “Performance Based” Template.
• Includes Requirements that WILL Affect Cost.
• Includes ABC Material Specification.
• Includes Requirement for Erosion Control and/or
Seeding Certain Conditions.
• Includes Road Grading Requirements and an Exception to Smoothness Requirements.
• Includes Additional Information for Ditching, Culvert
Cleaning, and Tail Ditch Cleaning
• IS A “MUST READ” Section.