Contract General Specifications.docx
DOCX document 377 KB Posted
- Solicitation number
- ag-4568-s-12-0022
- Issued by
-
Department of Agriculture Forest Service
About this file
General Contract Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD 004 ATT7_PISGAH_SPRING_2012.xlsx | XLSX spreadsheet | |
| SF30 AMD4.pdf | ||
| AMD 004 Section C-6 Revised.docx | DOCX document | |
| AMD 004 Section 5.3.docx | DOCX document | |
| AMD 004 ATT7_GRD_SPRING_2012.xlsx | XLSX spreadsheet | |
| AMD 004 PRS_2012.pdf | ||
| AMD002_Prebid Meeting Q and A.docx | DOCX document | |
| ATT1 SCA GRANDFATHER.docx | DOCX document | |
| ATT7_GRD_SPRING_2012.xlsx | XLSX spreadsheet | |
| PREBID MEETING.pdf | ||
| SF30.pdf | ||
| PreBid Signin Sheets.pdf | ||
| ATT3_PRS.pdf | ||
| 0001.pdf | ||
| SF1449_RFQ.pdf | ||
| Reference Items.docx | DOCX document | |
| District Roads.zip | ZIP file | |
| OF_347.pdf | ||
| ATTACHMENT 1 WAGE RATES.zip | ZIP file | |
| ATTACHMENT 2 POTENTIAL LINE ITEMS.docx | DOCX document | |
| ATTACHMENT 4 REFER_SAMPLE FORMS.zip | ZIP file | |
| OF_347 pg2.pdf | ||
| ATTACHMENT 5 EXPER QUEST.docx | DOCX document | |
| ATTACHMENT 6 PAST PERFORM QUEST.docx | DOCX document | |
| ATTACHMENT 7 INITIAL TASK ORDERS.zip | ZIP file | |
| RFQ_body.docx | DOCX document | |
| PRS.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ Road Maintenance NFNC Contract General Specifications
C1.1 – SCOPE OF CONTRACT NOT USED.
C1.2 – PERSONNEL
1.2.1 Contractor Representative. The contractor shall designate a representative in accordance with FAR 52.236-6 included in Section I of this contract. The name of this person shall be designated in writing and provided to the Contracting Officer.
1.2.1.1. Authority. The contractor representative shall have authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.2.1.2. Response Time. The contractor representative shall be available during normal duty hours (i.e. Monday thru Friday 8am – 5pm) within 60 minutes to meet, at the site of work, with Government personnel designated by the Contracting Officer to discuss and resolve performance issues. After normal duty hours the representative shall be available within 2 hours in case of emergency.
1.2.1.3. Language. The contractor representative must be able to read, write, speak, and understand English.
1.2.2. ACCESS. In most cases, roads are open continuously. The Government will supply a key to the Contractor for roads closed by Forest Service gates. It is the contractor’s responsibility to obtain all keys for closed roads from the District Ranger Office prior to start of work and must be returned when the work included in the Task Order is completed.
C1.3 – QUALITY CONTROL.
1.3.1. QUALITY CONTROL PLAN. The contractor shall establish and maintain a Quality Control Program to ensure the requirements of the contract are achieved.
1.3.2. PLAN CONTENTS.
1.3.2.1. Inspection System. An inspection system must cover all of the services listed in the “description” column of the Performance Requirements Summary (PRS). The inspection system need only cover items included in the task orders. It must specify the work items to be inspected on either a scheduled or unscheduled basis, how often inspections will be accomplished, and the title of the individual(s) who will perform the inspection. The inspection system must provide for a written record of inspections and results.
1.3.2.2. Methods. Identify the proposed methods for identifying and preventing defects before the level of performance becomes unacceptable.
1.3.2.3. Records. The contractor shall maintain on-site records of all inspections and necessary corrective action(s) taken. This documentation shall be furnished at the time payment is requested, or when requested by the Contracting Officer’s Representative during the term of the contract. Project inspectors reserve the right to check contractor’s Quality Control Inspections at any time during the life of a task order.
1.3.3. GOVERNMENT REVIEW. The Government will review the Contractor Quality Control Plan to determine if it is adequate within 10 calendar days of submission. If the plan is found to be adequate, the Government will authorize the plan. If the plan is not adequate as submitted, the deficiencies will be identified to the contractor in writing. The contractor shall correct all identified deficiencies and submit a corrected Contractor Quality Control Plan prior to start of work.
C1.4. QUALITY ASSURANCE.
1.4.1. CONTRACTING OFFICER'S REPRESENTATIVE (COR). COR(s) will be appointed to monitor contractor performance and have the right to inspect and accept or reject the services provided under the contract. The name and telephone number of each COR under the contract will be furnished to the contractor in writing by the Contracting Officer.
1.4.2. PROJECT INSPECTOR. A Project Inspector will be appointed to monitor contractor performance and have the right to inspect and accept or reject the services as required by the contract. The inspector will monitor the contractor's performance under this contract using the method(s) of surveillance specified in the Quality Assurance Surveillance Plan (QASP). All monitoring observations will be recorded by the government. When an observation indicates defective performance, the inspector will request the contractor's representative to confirm defective work and perform corrective work.
1.4.3. PERFORMANCE EVALUATION MEETINGS. The contractor’s representative and/or project manager may be required to meet weekly with the COR or others during the first month of the contract. Meetings shall be as often as necessary thereafter as determined by the Contracting Officer. If requested by the Contractor, a meeting will be held whenever a Notice of Noncompliance is issued. The meetings shall focus on contractor performance and actual or potential problems. A mutual good faith effort shall be made by all parties to resolve all issues. The written minutes of these meetings shall be signed by the parties to the discussion. Should the contractor not concur with the minutes, the contractor shall so state any areas of non-concurrence in writing to the Contracting Officer within seven working days of receipt of the minutes.
1.4.4. CONTRACTOR NOTIFICATION RESPONSIBILITIES. To facilitate timely inspections, the contractor shall inform the Project Inspector of the proposed operation schedule on a weekly basis. It is the Contractor’s responsibility to notify the Inspector or COR if the schedule changes. Should the Contractor be unable to notify the Inspector, notify the COR or CO, in that order.
C1.5. Physical Security
1.5.1. KEY CONTROL. The contractor shall establish and implement methods of ensuring that all keys issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. No keys issued to the contractor by the Government shall be duplicated. The contractor shall develop procedures covering key control that shall be included in the quality control plan. ALL keys issues by the Government are to be returned prior to final payment request.
C1.6 PERIODS OF OPERATION
1.6.1. Task orders may be issued at any time. Actual grading periods are subject to temperature and moisture content restraints as specified in Attachment 3, Section C-6.
C1.7. DOCUMENTATION AND RECORDS.
1.7.1. The contractor shall maintain records of accomplishment using the Daily Accomplishment Report form shown in Attachment 4. Reports are to be updated Daily, COR/Inspector reserves the right to view these documents at any time during inspection visits. These reports shall be verified and signed by the Project Inspector and submitted to the Contracting Officer’s Representative along with the contractor’s invoice for payment and shall be become the property of the Government. No payment or acceptance shall be made prior to receipt of these records.
1.7.2. All documentation, records and schedules as described in the PWS that are the responsibility of the contractor, are the property of the Government and shall be turned over to the Government upon completion or termination of the contract. All records are subject to the Freedom of Information and/or Privacy Acts and any requests for release of any records shall be handled accordingly.
C1.8. PAYMENT PROCEDURES.
1.8.1. The Government may make progress payments as the work proceeds per the Contractor’s request. The Contractor shall make this request by submitting the following to the COR:
1. Itemized Invoice that includes your Name/Company Name, Address, City, State, Zip Code, Vendor Number, Delivery Order Number, Invoice Number, and Date. Purchase Order Numbers are not overall Contract Numbers and will be different for each Task Order issued. Delivery Order Numbers typically follow the format AG-XXXX-D-XX-XXXX.
2. Daily Accomplishment Reports for the days covered in the Invoice. Daily Accomplishment Reports are to be signed by the Contractor and Inspector prior to submission.
3. Quality Control Plan inspection records for all roads for which payment is being requested for.
4. A written receipt from the District Office stating that all keys issued to the Contractor have been returned in order to process the Final Invoice.
1.8.2. The COR has 7 working days after the Invoice AND appropriate documentation has reached the billing office to determine if the Invoice is a proper Invoice, containing all information described in section C1.9.1. It is the Contractors responsibility to get the Invoice and appropriate paperwork to the billing office. The billing office for these contracts shall be the office address of the COR on file for each task order. If the Invoice is rejected the COR will return the Invoice with a letter stating deficiencies. Once the Invoice has been approved the government has 30 days from the date the COR received the invoice to pay the contractor via Electronic Funds Transfer.
SECTION C-2
ABBREVIATIONS
AASHTO - American Association of State Highway and Transportation Officials.
ABC – Aggregate Base Course
AQL – Acceptable Quality Level
ASTM – American Society for Testing and Materials.
COR – Contracting Officer’s Representative
EPA - Environmental Protection Agency.
FAR - Federal Acquisition Regulation System.
FED SPEC - Federal Specifications.
FP-03 - Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.
MSHA - Mine Safety Health Administration.
MUTCD - Manual of Uniform Traffic Control Devices.
NBS - National Bureau of Standards.
NCDOT – North Carolina Department of Transportation
OSHA - Occupational Safety and Health Administration.
PBSC – Performance Based Service Contract
PRS – Performance Requirements Summary
QA – Quality Assurance (Government Responsibility)
QC – Quality Control (Contractor Responsibility)
QASP – Quality Assurance Surveillance and COR Action Plan
SECTION C-3
GOVERNMENT FURNISHED
PROPERTY/MATERIAL
3.1. Government Keys The Government will provide a gate key to the contractor, if any of the road gates are locked. Refer to section Attachment 3, Section C1.2.3.
3.2. Gravel The Government reserves the right to provide gravel on certain portions of roads, prior to grading. Gravel will be placed to a uniform thickness by tailgating or similar methods ahead of the blading operation. See also Attachment 3, Section C-6.
SECTION C-4
CONTRACTOR FURNISHED
PROPERTY, SUPPLIES, MATERIALS, and EQUIPMENT
4.1 General. Except for those items or services specifically stated to be Government furnished in Section C-3 or other sections of this specification, the contractor shall furnish all equipment, materials, supplies, and incidentals required to perform the tasks identified in this contract in a skillful and workmanlike manner.
SECTION C-5
SPECIFIC TASKS
5.1 Grading Aggregate Surfaced and Non-surfaced Roads - Blading operations to remove ruts, potholes, corrugations and unnecessary berms.
5.1.1 Quality Standard
· Road bed is firm, smooth, and finished to the intended width and cross slope, including turnouts. Aggregate surface material (if present) is uniform depth. Surface is free of ruts, potholes, washes and washboarding.
· Road surface drains completely. Cross slope or crown is a uniform 3% ± 1% or existing slope if steeper than 4%.
· Intersections are smoothly blended. No abrupt grade breaks.
· Ruts, potholes, washboards and wash outs are scarified to the bottom of the defect. No areas of high blading exist.
· No loose rocks larger than 3” in its largest dimension remain on the traveled way and shoulders.
· No debris, trash, or otherwise unsuitable material exists on the traveled way and shoulders.
· Leaves and pine needles generated from ditch(es), traveled way and shoulders are evenly spread over traveled way unless otherwise directed by the COR.
5.1.2 Measurement
Measurement shall be made of actual work, acceptably completed, to the nearest tenth (0.1) of a mile using an odometer or distance measuring instrument calibrated over a measured mile.
5.1.3 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section C5.1 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this section.
Pay Item Pay Unit
C5.1(1) Grading Aggregate Surfaced and Non-surfaced Roads Mile
5.2 Cleaning and Reshaping Ditches - Maintaining all ditches in their original location to the shape and grade required to ensure roadway drainage. Clean associated lead-off ditches. Install wattles to contain sediment.
5.2.1 Quality Standard
· Ditches shall be cleaned to a minimum depth of 1 foot (12”) below the edge of shoulder or to rock and the slope of the ditch from the road shoulder to the bottom of the ditch is 2:1 or flatter. Transitions to 18” and 24” culverts are smooth and transition from normal ditch depth to the invert of the culvert in 20’ +/- 5’. Ditch debris shall not be left piled at or around culvert entrances. In no case shall ditches deeper than 24” be cut with a grader blade.
· Ditches shall not allow water to stand.
· Culvert inlets are unobstructed by grass, debris, dirt, brush, or trees less than 4” in diameter within a 3’ radius of culvert inlet. Relief ditches are exempt from this standard.
· Road prism is not cut into.
· Loose rocks that are impeding proper drainage, dirt, slough, debris and deposits are removed from the ditch, including foreslope and backslope. Additional tools may be necessary to clean ditches with depths greater than 12”.
· Backslopes match existing and have not been undercut to a greater height than ½ of the moldboard.
· Silt Traps are cleaned to original dimensions and depth.
· Lead off ditches completely drain.
· Wattles are installed in accordance with the manufacturer’s instructions.
5.2.2 Measurement
Road ditches where work was acceptably performed shall be measured to the nearest tenth of a mile by vehicle odometer. Measurement shall be made of actual ditch work on each side of the road.
No separate measurement will be made of leadoff ditches or roadside ditch silt traps. This work shall be considered incidental to the pay item for cleaning and reshaping ditches.
Wattles will be measured by counting each wattle accepted in place.
5.2.3 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section C5.2 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this section.
Pay Item Pay Unit
C5.2(1) Cleaning and Reshaping Ditches Mile
C5.2(2) Wattles, _Type/Size_____________ Each
5.3 Cleaning and Brushing of Culvert Inlets and Ditch Transitions– Culverts inspected and cleaned to remove dirt, silt, muck, debris and vegetative matter at and around culvert inlets. Transitions to culverts are smooth and transition from normal ditch depth to the invert of the culvert in 20’ +/- 5’.
5.3.1 Quality Standard
· Culverts barrels shall be cleaned at its immediate inlet to remove any dirt, silt, muck, debris, and vegetative matter that might cause culvert blockage.
· Culvert Inlets are unobstructed by grass, debris, brush, dirt, or trees less than 4” diameter within 3’ of its inlet.
· Loose rocks that are impeding proper drainage, dirt, slough, debris and deposits are removed from the Ditch Transition, including foreslope and backslope.
· Dispose of unsuitable material outside of the traveled way and shoulders, and in manner as to not impede any watercourses or as directed by the COR or Project Inspector.
5.3.2 Measurement
Measurement shall be made of the road served by the culverts, to the nearest tenth of a mile using a vehicle odometer or distance measuring instrument calibrated over a measured mile.
5.3.3 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section C5.3 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this section.
Pay Item Pay Unit
C5.3(1) Cleaning and Brushing of Culvert Inlets and Ditch Transitions Mile
5.4 Clean Culverts and Tail Ditches – Culverts inspected and cleaned to remove dirt, silt, muck, debris and vegetative matter to maintain an un-obstructed flow of water through the culvert to daylight.
5.4.1 Quality Standard
· Culverts shall be cleaned throughout its length so that no more than 2” of debris is left in any culvert of 36” or less diameter. Culverts larger than 36” shall be cleaned of debris so that no more than ⅛ the diameter of the culvert is blocked.
· Culvert inlets are unobstructed by grass, debris, brush, dirt, or trees less than 4” diameter within 3’ of its inlet and outlet.
· Tail ditches at culvert outlets completely drain.
5.4.2 Measurement
Measurement shall be made of the roadway served by the culverts, to the nearest tenth of a mile using a vehicle odometer or distance measuring instrument calibrated over a measured mile. Cleaning tail ditches and silt traps within tail ditches will not be measured separately, but will be considered incidental to cleaning culverts.
5.4.3 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section C5.4 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this section.
Pay Item Pay Unit
C5.4(1) Clean Culverts and Tail Ditches Mile
5.5 Aggregate Surfacing, Type ABC or ABC(M) - Replacement of surface aggregate lost due to traffic wear or erosion.
5.5.1 Quality Standard
· Road bed is firm, smooth, and finished to the intended width and cross slope, including turnouts. Aggregate surface material is uniform depth. Surface is free of ruts, potholes, washes and washboarding.
· Road surface drains completely. Cross slope or crown is a uniform 3% ± 1% or existing slope if steeper than 4%.
· Intersections are smoothly blended. No abrupt grade breaks.
· Ruts, potholes, washboards and wash outs are cut to the bottom of the defect. No areas of high blading exist.
· No loose rocks larger than 3” in its largest dimension remain on the traveled way and shoulders.
· No debris, trash, or otherwise unsuitable material exists on the traveled way and shoulders.
· Leaves and pine needles generated from ditch(es), traveled way and shoulders are evenly spread over traveled way unless otherwise directed by the COR.
5.5.2 Measurement
Measurement will be made to the nearest 0.01 Ton accepted in place, verified by certified weight tickets.
5.5.2 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section C5.5 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this section.
Pay Item Pay Unit
C5.5(1) Aggregate Surfacing, Type ABC TON
C5.5(1) Aggregate Surfacing, Type ABC (M) TON
5.6 Spot Surfacing - Load, haul, and place surface material to repair or stabilize road surfaces.
5.6.1 Quality Standard
· Road bed is firm, smooth, and finished to the intended width and cross slope, including turnouts. Aggregate surface material is uniform depth. Surface is free of ruts, potholes, washes and washboarding.
· Spot surfacing is complete when the designated quantity of the ordered material has been placed, spread, smoothed and compacted by running equipment over the full width of the placement.
· Surface material depth is as specified.
· Surface Material is spread to the dimensions specified.
· Material is compacted so not displacement occurs under heavy equipment traffic.
· New material transitions to adjacent road surfaces without abrupt changes.
· Surface material meets specifications.
5.6.2 Measurement
Measurement will be made to the nearest 0.01 Ton accepted in place, verified by certified weight tickets.
5.6.3 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 5.6 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit
| 5.6(1) | Spot Surfacing, Gradation ABC | Ton | |
| 5.6(2) | Spot Surfacing, Gradation Railroad Ballast | Ton | |
| 5.6(3) | Spot Surfacing, Gradation _____ | Ton |
5.7 Equipment Rental – Furnish and operate equipment.
5.7.1 Quality Standard
Make equipment available for inspection and approval before use. Furnish the equipment specified in the table below:
| Description |
| Max Age (years)** |
| Min HP |
| Min Reach (feet) |
| Weight (pounds) |
| Capacity |
| Attachments |
| Remarks |
| Excavator |
| 15 |
| 135 |
| 20 |
| 1 CY |
| thumb |
| Similar to Cat 320 |
| Backhoe/loader |
| 15 |
| 80 |
| 14 |
| 15,000 |
| thumb |
| Similar to Cat 420 |
| Grader |
| 15 |
| 140 |
| N/A |
| 30,000 |
| 12’ blade |
| Rippers/ Scarifiers |
| Similar to cat 12H |
| Crawler Tractor |
| 15 |
| 140 |
| N/A |
| 34,000 |
| U blade or similar |
Similar to Cat D 6
| Dump Truck - Tandem |
| 15 |
| 300 |
| N/A |
| N/A |
| 15 tons |
| 2 way radio |
| Dump Truck – tri axle |
| 15 |
| 400 |
| N/A |
| N/A |
| 20 tons |
| 2 way radio |
| Dump Truck – quad axle |
| 15 |
| 500 |
| N/A |
| N/A |
| 25 tons |
| 2 way radio |
| Boom mower |
| 15 |
| 90 |
| N/A |
| N/A |
4 ft cutter head min.
| Vibratory Roller |
| 15 |
| 100 |
| N/A |
| 20,000 |
| Min. drum width 5’6” |
Similar to Cat CS-533
| Low Boy Transporter |
| 15 |
N/A
| Skidder |
| 15 |
| 150 |
| N/A |
| 35,000 |
| N/A |
| Winch w/130’ ¾” cable |
| Similar to Cat 525 |
** Note: Equipment older than 15 years, in exceptionally good condition, meeting all current OSHA requirements may be allowed if approved by the Contracting Officer. Contractor shall submit all pertinent information demonstrating the condition, capabilities, and safety of the equipment and the reason for the request.
· Equipment is clean and free of weed seeds, well maintained, free of leaks, capable of operating at least 90% of the time. Meet all state and federal regulations.
· Equipment meets state and federal regulations.
· Operator is trained, qualified and competent.
· Equipment is clean and free of weed seeds.
· Equipment is well-maintained and free of leaks.
C5.7.2 Measurement
Measurement will be made per hour of actual work
Round portions of an hour up to the next half hour.
Do not measure time for non-operable equipment or equipment dependent on another piece of non-operable equipment.
Pay for moving of equipment at the established hourly rate if it is moved using its own power (crawling).
Transportation by lowboy will be measured as the number of hours of lowboy time plus 1 hour each to load and unload.
C5.7.3 Payment
Time in excess of 40 hours per week will be paid for at the same rate as the first 40 hours. The accepted quantities will be paid at the contract price per unit of measurement for the Section C5.6 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this section including operator/driver and moving.
Payment will be made under:
PAY ITEM PAY UNIT
C5.7(1) Equipment, Type ________ Hour
C5.7(2) Excavator Hour
C5.7(3) Backhoe/loader Hour
C5.7(4) Grader Hour
C5.7(5) Crawler Tractor Hour
C5.7(6) Dump Truck, Single Axle Hour
C5.7(7) Dump Truck, Tandem Hour
C5.7(8) Dump Truck, Tri-axle Hour
C5.7(9) Boom Mower Hour
C5.7(10) Vibratory Roller Hour
C5.7(11) Low Boy Hour
C5.7(12) Skidder Hour
5.8 Hazard and Obstruction Removal -Remove and/or stabilize hazards and obstructions.
5.8.1 Quality Standard
· Work is complete when hazards have been removed or stabilized and when the road is passable by the intended traffic.
· Removed timber to be marketed meets specified utilization standards.
· Stump heights meet specifications.
· Remaining trees are undamaged.
· Drainages have not been impeded by the work of this contract.
· Marked danger trees are removed.
· Hazards that interfere with the use of the road are removed or stabilized.
· Horizontal and vertical clearances are as specified.
· Work area is safe at all times.
5.8.2 Measurement
For items paid by mile, measure actual work activity along the centerline of the road to the nearest 0.1 mile using a vehicle odometer.
For items paid by each, count each hazard/obstruction acceptably removed.
No separate measurement and payment will be made for disposal. Disposal is considered incidental to removal.
5.8.3 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 5.10 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this section.
Pay Item Pay Unit
| C5.8(1) Danger Tree Removal | Mile | |
| C5.8(2) Danger Tree Removal | Each | |
| C5.8(3) Hazard or Obstruction Removal | Mile | |
| C5.8(4) Hazard or Obstruction Removal | Each |
5.9 Sign Maintenance -Furnish, install, and maintain forest entrance, destination, route markers, and traffic signs.
5.9.1 Quality Standard
Sign Maintenance is complete when designated signs meet the quality standards of Forest Service Handbook EM 7100-15 - Sign and Poster Guidelines for the Forest Service, and installed according to the current edition of Forest Service Sign Installation Guide 6E62H99 – Sign Installation Field Guide, available at http://fsweb.wo.fs.fed.us/eng/programs/signs.htm
5.9.2 Measurement
For items paid by mile, measure actual work activity along the centerline of the road to the nearest 0.1 mile using a vehicle odometer.
For items paid by each, count each item acceptably completed in place.
C5.9.3 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 5.12 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Payment will be made under:
Pay Item Pay Unit
| C5.9(1) | Clean Sign Face | Each | |||
| C5.9(2) | Recondition Sign Face | Each | |||
| C5.9(3) | Install or Replace Single Post and Sign | Each | |||
| C5.9(4) | Install or Replace Double Post and Sign | Each | |||
| C5.9(5) | Install or Replace Sign | Each | |||
| C5.9(6) | Remove Sign | Each | |||
| C5.9(7) | Remount Sign | Each | |||
| C5.9(8) | Apply New Sign Face | Each | |||
| C5.9(9) | Maintain Marker | Each | |||
| C5.9(10) | Replace Marker | Each | |||
| C5.9(11) | Sign, Marker Maintenance | Mile |
5.10 Mowing and Brushing-Mowing consists of cutting grass and woody plant growth up to two inches in diameter at mower height. Brushing consists of a combination of mowing and hand or machine cutting of brush and trees up to ten inches in diameter, measured at breast height
5.10.1 Quality Standard
· Shoulders, ditches and roadway appurtenances are mowed to the limits specified. No missed strips or high areas remain. Plant growth around signs, bridges, culverts and cattleguards is trimmed to match machine-mowed appearance.
· Stump heights of trees larger than 4”are less than 2” from ground level on the downhill side to the mowing/brushing limits specified.
· Stump heights of vegetation less than 4”are less than 2” from ground level or the height of the mower on the downhill side to the mowing/brushing limits specified.
· If required by a specific task order, stumps are left without sharp edges or splintering.
· Sight distance at intersections and blind curves are adequate.
· Remaining trees are undamaged.
· Area is clean and neat.
· Drainages have not been impeded by the work of this contract.
· Work area is safe at all times.
5.10.2 Measurement
Measurement for Mowing and Brushing will be made for actual mowing or brushing to the nearest tenth of a mile using an odometer calibrated over a measured mile. Measurement will be made along the centerline of the road for each type of work on each side of the road.
C5.10.3 Payment
Payment will be made for all work of this activity, inspected and accepted, in accordance with the following pay items and bid unit price.
Pay Item Description Pay Unit
| C5.10(01) | Mowing | Mile |
| C5.10(02) | Brushing | Mile |
5.11 Slide Repair-Remove and dispose of cut slide dirt, rocks and debris. Fill and stabilize voids in embankments caused by fill slope failures.
5.11.1 Quality Standard
· All slopes are stable
· The traveled way, ditches and shoulders are open, firm, safe, and restored to original width.
· Area is clean and neat.
· Disposal areas are neat and orderly. Silt migration is prevented.
· Work area is safe at all times.
· Seeding, if required, is complete.
5.11.2 Measurement
Measurement of Lump Sum items will not be made.
Measurement of cubic yard-mile items will be made by measuring the dimensions of the haul vehicle and the depth of the material in the truck after being leveled to determine the number of cubic yards. The number of cubic yards will be multiplied by the number of miles less 2miles, from the origin to the disposal site using the shortest viable route.
Measurement of cubic yard items will be made by measuring the dimensions of the haul vehicle and the depth of the material in the truck after being leveled.
Measurement of tons will be made to the nearest 0.01 Ton accepted in place, verified by certified weight tickets.
C5.11.3 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 5.11 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this section.
Pay Item Description Pay Unit
| C5.11(01) | Cut Slide Removal | Lump Sum | ||
| C5.11(02) | Haul (greater than 2 miles) | Cubic Yard-Mile | ||
| C5.11(03) | Bench Excavation | Lump Sum | ||
| C5.11(04) | Imported Rock Fill >24” | Ton | ||
| C5.11(05) | Imported Rock Fill 12”-24” | Ton | ||
| C5.11(06) | Imported Rock Fill 3”-12” | Ton | ||
| C5.11(07) | Imported Rock Fill <3” | Ton | ||
| C5.11(08) | Geotextiles | Square Yard | ||
| C5.11(09) | Imported Fill | Cubic Yard |
SECTION C-6
SPECIFIC TASKS OVERVIEW
TECHNICAL SPECIFICATIONS FOR ROAD MAINTENANCE
The Road Maintenance Schedule specifies the road number and required maintenance activity for each road. Adjustments to these schedules may be made in accordance with applicable FAR clauses. Any such adjustments require prior written documentation from the Contracting Officer.
Soil Moisture Conditions and Temperatures
Suitable moisture conditions for surface blading shall be within the range of five (5%) percent to fifteen (15%) percent by weight. Unless authorized, no surface blading may be performed while the moisture content is outside this range.
No grading or other maintenance operations shall be performed during periods of freeze/thaw or when the ground is frozen.
Aggregate Materials
Aggregate surfacing, if included as a pay item, shall be crushed stone with gradations being obtained by crushing, screening and mixing as necessary. Aggregates shall meet the requirements of NCDOT ABC or NCDOT ABC(M). Aggregate Base Course and shall meet all requirements for gradation, hardness, and durability. Certifications of Compliance are required from aggregate suppliers.
Maintenance and Control of Traffic
For all items of work provide safety signage, barricades, lane closures, flaggers, and other traffic control devices appropriate for the location of the work. Take all necessary precautions for the protection of workers and the public. At a minimum, erect warning signs in advance of any place on the project where operations may interfere with the use of the road or trail by traffic. The minimum may only be used on closed roads where public traffic is not expected, but administrative traffic or pedestrian use is possible. On any open road, more comprehensive warnings and traffic control is required. Maximum delay of any traffic on open roads is 10 minutes. See also, Attachment 3, Section C-1.2.2.
Erosion and Sedimentation Control
If the work of the contract creates potential for soil erosion or silt migration over areas of mature vegetation or natural areas the contractor will be responsible for providing silt fence, straw bales or other suitable containment and will also be required to seed, fertilize, and mulch bare ground areas. Such works includes, but is not limited to culvert cleaning, excess dirt generation from ditch transition cleaning, and disposal of slide or silt trap material. This does not include the newly graded ditch line.
Blading Aggregate Surfaced and Non-Surfaced Roads
Scarify sections of roads where numerous or severe deep defects have developed. Scarification depth shall be to a depth of 6 inches or to the bottom of the defect, whichever is less.
All suitable dislodged aggregate shall be smoothly spread over the entire traveled way to produce proper cross slope or crown. (1/4” to ½” per foot of width).
All suitable aggregate which has been worked onto road shoulders by traffic or maintenance activities shall be reclaimed onto the traveled way. A definite, continuous, and smooth line between aggregate surface and road shoulder shall be obtained. Grass, pine needle, or leaf litter shall be evenly spread within the traveled way after sifting out the surface aggregate. Excessive amounts of grass or leaf litter may be evenly spread along the shoulder if approved by the Project Inspector prior to placement. Excessive amounts of grass or leaf litter containing aggregate may be placed in areas designated by the COR. Berming of litter and litter balls containing aggregate along the fill side shoulder will not be allowed. The contractor shall make as many passes as necessary to assure that the aggregate is sifted out of the grass and leaf litter.
The Forest Service may supply aggregate to be placed by tailgate spreading at any time and in any amount. Finish blading by the contractor is required when aggregate is hauled and spread ahead of the contractor’s blading operations. No additional compensation will be allowed for finish grading government-furnished aggregate as long as the material is deposited by tailgating ahead of the blading operation.
Dislodged rocks of more than 3” in dimension will be removed from the traveled way. EXCEPTION: On non-surfaced roads, where the traveled way material is made up of a substantial amount of rocks over three inches, the contractor will remove those rocks that are greater than 25% larger than the typical stone size on the road. In no case will rocks over 6” be allowed to remain.
If erosion has removed gradable material to the extent that there is not sufficient material within 300 feet to provide the surface smoothness or cross-section specified, notify the Project Inspector prior to proceeding. The inspector or COR may allow a modified cross-section and/or surface smoothness that effectively utilizes available material. The Contractor will not be held responsible for substandard work that results from the lack of suitable material.
Undercutting of road surface at the shoulder will not be allowed.
Blading operations shall include removing all foreign material and debris from bridge decks without allowing any material to fall into watercourses, below. It includes sweeping sand and fines from the bridge decks and depositing the removed material in a location along the roadway that will not allow it to enter waterways or stream courses.
All traveled way widths shall be perpetuated as existing. Dips and swales within the traveled way designed to control surface drainage shall be maintained.
Cleaning and Reshaping Ditches
All ditches shall be maintained in their original location to the shape and grade required to ensure roadway drainage. Drainage structures and road appurtenances shall not be damaged during this operation. Handwork required to properly connect ditch flow to drainage structure inlets is considered a part of this activity. Cleaning lead-off ditches to drain is included in this item of work. Cleaning silt traps that service the roadside ditch(es) or lead-off ditch(es) is included in this work. Restore silt traps to their original dimensions and depth.
If erosion or other existing condition, has removed gradable material to the extent that the specified ditch depth or cross section cannot be maintained, notify the Project Inspector prior to proceeding. The inspector or COR may allow a modified cross-section and/or ditch depth that effectively utilizes available material. The Contractor will not be held responsible for substandard work that results from the lack of suitable material.
All suitable material having the same character as the road surface excavated through ditch cleaning shall be reclaimed and used within the traveled way. Unsuitable material from ditches or silt traps shall be spread along road shoulders, in depressions, or on fill slopes in a manner which will not affect watercourses, traveled way or shoulders. Unless otherwise directed, required to meet culvert inverts, or required to maintain positive flow of water, ditches shall be cleaned to a depth of 1 foot (12”) below the shoulder of the road and the slope of the ditch from the road shoulder to the bottom of the ditch is 2:1 or flatter. Deeper ditches may be required to maintain positive drainage or to match culvert entrances. No debris from ditches shall remain in or around culvert entrances.
Roadside Mowing And Heavy Brushing
Roadside mowing shall consist of cutting grass and woody plant growth two inches in diameter or less at mower height. Heavy brushing shall consist of a combination of mowing and hand or machine cutting of brush and trees up to ten inches in diameter, measured at breast eight. Either shall include brushing of all plant growth around signs, bridges, culverts and cattleguards. Stumps of all brush and trees shall be cut to within three inches of ground level, or mower height, and left without sharp edges.
All logs or brush exceeding two inches in diameter or three feet in length shall be disposed of outside the clearing limits or as otherwise required by individual task orders. Logs shall be limbed and all slash shall be sufficiently scattered to reduce unsightly concentrations or as otherwise required by individual task orders.
Remove all rocks larger than three inches in its largest dimension that are thrown on the riding surface. Remove from the riding surface, all woody material larger than one inch in diameter or two feet in length, and any other debris that could cause tire damage. Replace all signs damaged while mowing.
Where clearing limits are not defined by treelines or fences the limits are defined to be five feet beyond the top of the back slope, and five feet beyond the toe of fill slope.
Work on each road shall be completed prior to starting work on the next road, unless approved in advance by the Government.
Routine Mowing
Mowing from the centerline to five feet, beyond the traveled way on each side of the road. It includes any additional mowing needed for safe sight distance at road intersections and blind curves.
Reclamation Mowing
Mowing from the centerline to the clearing limits on both sides of the road, and includes all lead off ditches.
Heavy Brushing
Mowing and heavy brushing from the centerline to the clearing limits on both sides of the road, and includes all lead off ditches. Cut all trees ten inches or less in diameter at breast height to within 2 inches of ground level at the low side. Trees within the clearing limits that exceed ten inches in diameter at breast height shall not be cut. Trees cut under this specification shall not be removed from Government property.
Cleaning Culverts and Tail Ditches
All culverts within the work limits shown in Exhibit B shall be inspected for dirt, silt, muck, debris and vegetative matter and cleaned to ensure an un-obstructed flow of water.
Culverts shall be cleaned throughout its length so that no more than 2” of debris is left in any culvert of 36” or less diameter. Culverts larger than 36” shall be cleaned of debris so that no more than 1/8 the diameter of the culvert is blocked.
Tail ditches at culvert outlets shall be cleaned, to their original length or to daylight if feasible, to ensure unrestricted adequate flow from culvert outlets. Clean silt traps that service the tail ditches to their original dimensions and depth. Unsuitable material from ditches or silt traps shall be spread in depressions or on fill slopes in a manner which will not affect watercourses or the roadway. EXCEPTION: Silt traps on the Tusquitee Ranger District are not to be cleaned.
Remove grass, brush, and trees less than 4” diameter for a distance of 3 feet in all directions from the inlet and outlet of culverts.