Solicitation_AG-4431-S-15-0038_Specifications.pdf
PDF 802 KB Posted
- Attached to
- Install Metal 50' x 20' Metal Building Addition
- Solicitation number
- AG-4431-S-15-0038
About this file
Solicitation No. AG-4431-S-15-0038 Sepcifications
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SPECIFICATIONS
METAL SEED
STORAGE BUILDING
USDA, ARS
CROPPING SYSTEMS AND NEMATOLOGY RESEARCH UNIT
JACKSON, TENNESSEE
Prepared For:
U.S. DEPARTMENT OF AGRICULTURE
Agricultural Research Service
Prepared By:
THE JOHNSON-McADAMS FIRM, P.A.
Greenwood, Mississippi
July 24, 2015
TABLE OF CONTENTS Page 1
TITLE: METAL SEED STORAGE BUILDING
JACKSON, TENNESSEE
TABLE OF CONTENTS
Section Number Section Title
DIVISION 01 GENERAL REQUIREMENTS
01 00 01 Warranty of Construction 01 00 11 General Paragraphs 01 00 21 Contractor Quality Control 01 33 00 Submittal Procedures 01 50 00 Project Closeout 01 57 50 Temporary Environmental Controls 01 78 23 Operation and Maintenance Data
DIVISION 02 EXISTING CONDITIONS
02 41 00 Demolition
DIVISION 03 CONCRETE
03 30 00 Cast-In-Place Concrete
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 92 00 Joint Sealants
DIVISION 08 OPENINGS
08 11 13 Steel Doors and Frames 08 33 23 Overhead Coiling Doors 08 51 13 Aluminum Windows 08 71 00 Door Hardware 08 81 00 Glazing
DIVISION 13 SPECIAL CONSTRUCTION
13 34 19 Metal Building Systems
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems 23 03 00 Basic Mechanical Materials and Methods 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 82 46 Electric Unit Heaters
DIVISION 26 ELECTRICAL
26 00 00 Basic Electrical Materials and Methods 26 05 00 Common Work Results for Electrical 26 05 19 Insulated Wire and Cable 26 09 23 Lighting Control Devices 26 51 00 Interior Lighting 26 52 00 Emergency Lighting 26 53 00 Exit Signs 26 56 00 Exterior Lighting
DIVISION 31 EARTHWORK
31 23 00 Excavation and Fill
DIVISION 32 EXTERIOR IMPROVEMENTS
32 15 00 Aggregate Surface Course
-- End of Table of Contents --
METAL SEED STORAGE BUILDING SEEDSTORAGE
SECTION 01 00 01 Page 1
SECTION 01 00 01
WARRANTY OF CONSTRUCTION
PART 1 GENERAL
1.1 WARRANTY OF CONSTRUCTION
1.1.1 General
In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.
1.1.2 Notification and Compliance
The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage described in paragraph 1.1.1 above within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.
1.2 EXPRESSED WARRANTY
In addition to the other rights and remedies provided by this clause, all subcontractors', manufacturers', and suppliers' warranties expressed or implied, respecting any work and materials shall, at the direction of the Government, be enforced by the Contractor for the benefit of the Government.
In such case, if the Contractor's warranty under paragraph 1.1.1 above has expired, any suit directed by the Government to enforce a subcontractor's, manufacturer's, or supplier's warranty shall be at the expense of the Government. The Contractor shall obtain any warranties which the subcontractors, manufacturers, or suppliers would give in normal commercial practice. If so directed by the Contracting Officer, the Contractor shall require any such warranties to be executed in writing to the Government.
1.3 LATENT DEFECTS
The Warranty specified herein shall not limit the Government's rights with respect to latent defects, gross mistake, or fraud.
-- End of Section --
SECTION 01 00 11 Page 1
SECTION 01 00 11
GENERAL PARAGRAPHS
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.1.1 Work To Be Done
The work to be done consists of furnishing all labor, materials, and equipment and performing all work in strict accordance with these specifications for Metal Seed Storage Building, Cropping Systems and Nematology Research Unit, Jackson, TN.
1.1.2 Location
The site of work contemplated by this specification is at the Cropping Systems and Nematology Research Unit, Jackson, TN.
1.1.3 Principal Features of Work:
1. Soil excavation and fill.
2. Erection of a pre-engineered metal building frame with roof and limited wall panels.
3. Concrete spread footings and slab.
4. Installation of doors and windows.
5. Installation of heating and ventilation equipment.
6. Installation of lighting and electrical requirements.
The project consists of a Base Bid and four Additive Bid Items as follows:
Base Bid Provide all labor and materials required to complete the work as shown in contract documents.
1.2 SITE VISIT
A site visit and inspection tour will be held at Cropping Systems and Nematology Research Unit, Jackson, TN. All potential bidders will be notified of the exact time and date and are strongly urged to attend the site visit. Inspection may only be made at this time, unless prior written approval is obtained to inspect at another date and time. Contact:
U.S. Department of Agriculture, ARS
Cropping Systems and Nematology Research Unit 605 Airways BLVD.
Jackson, TN 38301 Attn: Chris Street Tel. No.: (731) 426-0438
1.3 COORDINATION OF WORK
1.3.1 Work space and space available for storing materials shall be subject to the approval of the Contracting Officer. Do not store materials and
SECTION 01 00 11 Page 2 equipment in other than assigned areas.
1.3.2 Execute work so as to interfere as little as possible with normal functioning of the facility, including operations of utility services and any existing equipment, and with work being done by others.
1.3.3 Minimize interference of construction activities with the flow of traffic by keeping roads, walks and entrances to grounds, to parking areas and to occupied areas of buildings clear of construction materials, debris, construction equipment and vehicles except where noted on plans or in specifications. Provide unobstructed access to areas required to remain in operation.
1.3.4 The Contractor shall complete all work within 180 consecutive calendar days after Notice to Proceed. Within 14 calendar days after Contract Award, the Contractor shall provide the Government with a detailed schedule of dates on which the Contractor plans to accomplish the work. In addition, the Contractor shall notify the Contracting Officer 10 days in advance of starting work. A planned work schedule shall be submitted to the Contracting Officer for approval. The schedule shall include a detailed description of the methods and equipment to be used for each operation and the sequence of operations. This schedule shall be updated monthly and submitted to the Contracting Officer for approval.
1.3.5 The Contractor shall take all measures and provide all material necessary for protecting existing equipment, property, and ongoing operations in affected areas of construction against dust, noise and debris.
1.3.6 Power sources for the Contractor's operations will be available and supplied by the Government to the Contractor as long as its use does not interfere with the operations of the Government's facilities. Water sources will be available and supplied by the Government to the Contractor as long as its use does not interfere with the operations of any building. The Contractor is responsible for extending utility sources to his work locations. Such extensions shall be removed after work is completed, to the satisfaction of the Contracting Officer.
1.3.7 All references in the specifications to the Contracting Officer and
Contracting Officer's Representative shall constitute referrals initially to the Contracting Officer's Representative.
1.3.8 Contractor shall provide sanitary facilities for use by his employees and the employees of his subcontractors working on job site.
1.4 DRAWINGS
1.4.1 All dimensions shown of existing work and all dimensions required for work that is to be connected with existing work shall be verified by the Contractor by actual field measurements. Any work at variance with that specified or shown on the drawings, shall not be performed by the Contractor until the Contractor has received approval in writing from the Contracting Officer.
1.5 MATERIAL SAFETY DATA SHEETS (MSDS)
Material Safety Data Sheets must be submitted to the Contracting Officer prior to the commencement of any work with any substance that may be considered hazardous.
SECTION 01 00 11 Page 3
1.6 UTILITIES OR STRUCTURAL ITEMS CONFLICTING WITH PROPOSED CONSTRUCTION
In the event the Contractor finds an area where existing utilities or structural items conflict with proposed construction, the Contracting Officer shall be notified immediately. The Contractor shall then propose a method of solving the problem. Work shall not resume in the problem area until the Contractor has received written approval from the Contracting Officer. There shall be no additional cost to the Government.
1.7 ACCEPTANCE OF WORK
1.7.1 Final inspection will not be made until the contract work is completed. The Contractor shall notify in writing the Contracting Officer fifteen working days prior to the date on which the work will be ready for final inspection.
1.7.2 Final inspection and acceptance of the work shown by the drawings and specifications forming a part of this contract shall not be binding or conclusive on the Government if it shall be shown that (1) the Contractor has willfully or through collusion with persons or firms engaged in the performance of the contract supplied inferior materials, equipment, or workmanship, or (2) the Contractor has otherwise departed from the terms of the contract.
SECTION 01 00 21 Page 1
SECTION 01 00 21
CONTRACTOR QUALITY CONTROL
1.1 GENERAL
This section covers the quality control inspection, sampling, and testing of all materials, services, and workmanship required to be performed by the contract drawings, specifications, and other contract requirements. The Contractor shall perform all quality control inspection, sampling, and testing required by this contract and shall review and certify that each submittal is correct and in strict conformance with the contract drawings and specifications for all shop drawings and lists of materials, fixtures, and equipment. All work performed under this contract shall be in strict accordance procedures and requirements detailed on the plans and specifications.
1.1.1 Certificate of Compliance
Upon completion of the contract work and prior to final acceptance, the Contractor shall submit to the Contracting Officer a certificate of compliance which states that all materials, equipment, design, and workmanship incorporated in the work are in strict compliance with contract drawings and specifications except for approved deviations. The certificates of compliance shall be signed and dated by both the manufacturer’s representative and the Contractor. Based upon this certificate of compliance and other contract requirements, the Contractor shall be responsible for correcting at his expense any defects, omissions, and deviations (other than those previously approved) which are detected during the contract period or during the one year warranty period as defined in
SECTION 01 00 01, WARRANTY OF CONSTRUCTION.
1.2 INSPECTION
The Contractor shall inspect all materials, services, and workmanship to assure conformance with contract requirements.
1.3 REVIEW AND APPROVAL OF SHOP DRAWINGS, SUBMITTALS, MATERIALS, FIXTURES,
AND EQUIPMENT
1.3.1 Prior to submission to the Government for approval, the Contractor shall review and certify that all shop drawings, submittals, lists of materials, fixtures, and equipment as called for under the various headings of these specifications are correct and in strict compliance with the contract drawings and specifications. These drawings, submittals and lists shall be accurate, complete, and adequately detailed. The top copy of data comprising each item listed on the transmittal form shall be identified as having received the quality control inspector's approval by being so stamped, signed and dated. Approval of shop drawings, submittals, materials, fixtures, and equipment by the Contracting Officer will not relieve the Contractor of the responsibility for any errors which may exist and the Contractor shall be responsible for the satisfactory construction of all work. All samples of materials submitted as required by these specifications shall be properly identified and labeled for ready identification, and upon being approved, stored at the site of the work for jobsite use until all work has been accepted by the Contracting Officer.
The Contractor shall provide four (4) sets of all shop drawings.
SECTION 01 00 21 Page 2
1.3.2 All proposed deviations required by the Contractor shall be noted in the "Remarks" column of the Form. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the shop drawing. The Government reserves the right to rescind inadvertent approval of shop drawings containing unnoted deviations.
1.4 DAILY RECORDS
The Contractor shall maintain a daily record of quality control measures performed for each shift of Contractor or Subcontractor operations on an appropriate format. These records shall provide factual evidence that continuous quality control inspections have been performed, including but not limited to the following: job progress, problems encountered; problems resolved; type and number of inspections; results of inspections or tests including all computations; nature of defects; causes for rejection; safety violations; proposed remedial action; and corrective action taken. These records shall cover both conforming and defective items and shall include a statement that all supplies and materials incorporated in the work are in full compliance with the terms of the contract. The Contractor shall maintain a current record of all inspections and shall furnish to the Contracting Officer on a daily basis, legible copies of all inspection records for his permanent retention. The daily records of inspections shall cover all work placement subsequent to the previous report, and shall be verified by the Contractor's designated representative.
1.5 RECURRING DEFICIENCIES
If recurring deficiencies in an item or items being inspected by the Contractor indicate that the inspection system is not providing adequate quality control, the Contractor shall take such corrective measures as deemed necessary by the Contracting Officer.
1.6 CONFLICTS
In the event of a difference of opinion between the Contractor and the Contracting Officer, the Contracting Officer shall govern.
SECTION 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
1. SHOP DRAWINGS
The Contractor shall furnish the Contracting Officer six copies with such promptness as to cause no delay in this work or the work of any other contractors, one sepia copy of the shop drawings as required for the various subheadings for the Contracting Officer's approval. Shop drawings of any other subcontractor should be reviewed and approved by each subcontractor where their contract work comes in contact with or interferes with that of another subcontractor.
1.1 The Contracting Officer's approval, however, shall not relieve the
Contractor from responsibility for errors in shop drawings. Shop drawings are the instruments of the Contractor, not the Contracting Officer; the Drawings and Specifications shall always be final.
2. SAMPLES
Within and not later than thirty (30) days from the date of the General Contract, the General Contractor shall have secured and submitted to the Contracting Officer for his consideration, two samples of each kind and grade of materials and finish as noted under the various headings of the specifications. These samples shall be finished completely and shall accurately represent the work as it is proposed to be installed. The Contracting Officer will give immediate consideration to such samples and shall notify the General Contractor within ten (10) days after receipt of either approval or rejection. If such samples are rejected, the General Contractor shall, without delay, submit corrected samples for approval, and shall continue to do so until such approval is given the Contracting Officer. All approvals will be given by the Contracting Officer to the General Contractor in writing.
2.1 It shall be the Contractor's responsibility to obtain materials at such time as to cause no delay to the project. No allowance for additional time nor substitution of approved materials will be allowed for Contractor's negligence in late ordering of materials.
3. PRODUCT DATA
Submit six copies of preprinted material such as illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer’s descriptive literature, catalog data, and other data to illustrate portion of work.
4. GOVERNMENT ACTIONS POSSIBLE
Submittals will be returned to the Contractor with one of the following notations:
a. Submittals marked “approved” or “approved as submitted” authorize
Contractor to proceed with work covered.
b. Submittals marked Aapproved as noted@ or Aapproval except as noted; resubmission not required@ authorize Contractor to proceed with work as noted provided the Contractor takes no exception to the notations.
SECTION 01 33 00 Page 2
c. Submittals marked Arevise and “resubmitall” or “disapproved” indicate submittal is incomplete or does not comply with design concept or requirements of the contract documents and shall be resubmitted with appropriate changes. No work shall proceed for this item until resubmittal is approved.
5. SUBMITTAL REGISTER
Contractor shall submit items as listed on the attached Submittal Register.
S U B M
IT
T A L F O R M ,J a n
P R E V
IO
U S E D
IT
IO
N I S O
B S O L E T E
P A G E O
F P A G E S
M E T A L S E E D S T O R A G E B U
IL
D
IN
G
S D -0 P re c o n s tr u c ti o n S u b m it ta ls
.1
G
S u b m it ta l R e g is te r
S D -0 S h o p D ra w in g s
.6 .1 .1
R e in fo rc in g s te e l
S D -0 P ro d u c t D a ta
.4 .5
A d m ix tu re s
.4 .7
M a te ri a ls f o r C u ri n g C o n c re te
S D -0 D e s ig n D a ta
.3 .1 m ix d e s ig n
S D -0 T e s t R e p o rt s
.6 .2 .1
C o n c re te m ix d e s ig n
.1 .2 .3
C o m p re s s iv e s tr e n g th t e s ts
.1 .2 .4
A ir C o n te n t
.4 .3
A g g re g a te s
S D -0 C e rt if ic a te s
.6
B a tc h T ic k e t
S D -0 P ro d u c t D a ta
.1
S e a la n ts
.2
P ri m e rs
.3
B o n d b re a k e rs
.4
B a c k s to p s
S D -0 C e rt if ic a te s
.6
W a rr a n ty
.3 .6
S e a la n t
S D -0 S h o p D ra w in g s
.1
D o o rs
S U B M
IT
T A L R E G
IS
T E R
C O N T R A C T N
O
T
IT
L E A N D L O C A T
IO
N C O N T R A C T O R
C O N T R A C T O R
S C H E D U L E D A T E S
C O N T R A C T O R
A C T
IO
N A P P R O V
IN
G A U T H O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E S C R
IP
T
IO
N
IT
E M S U B M
IT
T E D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S U B M
IT
A P P R O V A L
N E E D E D
B Y
M A T E R
IA
L
N E E D E D
B Y
A C T I O N C O D E
D A T E
O F
A C T
IO
N
D A T E F W D
T O A P P R
A U T H
D A T E R
C D
F R O M
C O N T R
D A T E F W D
T O O
T H E R
R E V
IE
W E R
D A T E R
C D
F R O M O
T H
R E V
IE
W E R
A C T I O N C O D E
D A T E
O F
A C T
IO
N
M A
IL
E D
T O
C O N T R
D A T E R
C D
F R M A P P R
A U T H
R E M A R K S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
(r
B M
IT
T A L F O R M ,J a n
P R E V
IO
U S E D
IT
IO
N I S O
B S O L E T E
P A G E O
F P A G E S
M E T A L S E E D S T O R A G E B U
IL
D
IN
G
.1
D o o rs
.4
F ra m e s
.4
F ra m e s
.2
A c c e s s o ri e s
S D -0 P ro d u c t D a ta
.1
D o o rs
.4
F ra m e s
.2
A c c e s s o ri e s
S D -0 S h o p D ra w in g s
.3
O v e rh e a d C o ili n g D o o rs
.4
C o u n te rb a la n c in g M e c h a n is m
.5
C o u n te rb a la n c in g M e c h a n is m
.4
M a n u a l D o o r O p e ra to rs
.6
M a n u a l D o o r O p e ra to rs
.3 .3
B o tt o m B a rs
.3
G u id e s
.5 .1
M o u n ti n g B ra c k e ts
.3 .7
O v e rh e a d D ru m
.4
H o o d
.4
P a in ti n g
.3
In s ta lla ti o n D ra w in g s
S D -0 P ro d u c t D a ta
.3
O v e rh e a d C o ili n g D o o rs
.4
H a rd w a re
.4
C o u n te rb a la n c in g M e c h a n is m
.5
C o u n te rb a la n c in g M e c h a n is m
S U B M
IT
T A L R E G
IS
T E R
C O N T R A C T N
O
T
IT
L E A N D L O C A T
IO
N C O N T R A C T O R
C O N T R A C T O R
S C H E D U L E D A T E S
C O N T R A C T O R
A C T
IO
N A P P R O V
IN
G A U T H O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E S C R
IP
T
IO
N
IT
E M S U B M
IT
T E D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S U B M
IT
A P P R O V A L
N E E D E D
B Y
M A T E R
IA
L
N E E D E D
B Y
A C T I O N C O D E
D A T E
O F
A C T
IO
N
D A T E F W D
T O A P P R
A U T H
D A T E R
C D
F R O M
C O N T R
D A T E F W D
T O O
T H E R
R E V
IE
W E R
D A T E R
C D
F R O M O
T H
R E V
IE
W E R
A C T I O N C O D E
D A T E
O F
A C T
IO
N
M A
IL
E D
T O
C O N T R
D A T E R
C D
F R M A P P R
A U T H
R E M A R K S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T A L F O R M ,J a n
P R E V
IO
U S E D
IT
IO
N I S O
B S O L E T E
P A G E O
F P A G E S
M E T A L S E E D S T O R A G E B U
IL
D
IN
G
.4
M a n u a l D o o r O p e ra to rs
.6
M a n u a l D o o r O p e ra to rs
S D -0 D e s ig n D a ta
.3
O v e rh e a d C o ili n g D o o rs
.4
H a rd w a re
.4
C o u n te rb a la n c in g M e c h a n is m
.5
C o u n te rb a la n c in g M e c h a n is m
.4
M a n u a l D o o r O p e ra to rs
.6
M a n u a l D o o r O p e ra to rs
S D -1 O p e ra ti o n a n d M a in te n a n c e
D a ta
.3
O p e ra ti o n a n d M a in te n a n c e
M a n u a ls
.4
M a te ri a ls
.4
D e v ic e s
.4
P ro c e d u re s
.4
M a n u fa c tu re 's B ro c h u re s
.4
P a rt s L is ts
.2 .2
C le a n in g
S D -0 S h o p D ra w in g s
.1
W in d o w s
.8
F a b ri c a ti o n D ra w in g s
S D -0 P ro d u c t D a ta
.1
W in d o w s
.2 .5 .1
H a rd w a re
.2 .3
F a s te n e rs
S U B M
IT
T A L R E G
IS
T E R
C O N T R A C T N
O
T
IT
L E A N D L O C A T
IO
N C O N T R A C T O R
C O N T R A C T O R
S C H E D U L E D A T E S
C O N T R A C T O R
A C T
IO
N A P P R O V
IN
G A U T H O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E S C R
IP
T
IO
N
IT
E M S U B M
IT
T E D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S U B M
IT
A P P R O V A L
N E E D E D
B Y
M A T E R
IA
L
N E E D E D
B Y
A C T I O N C O D E
D A T E
O F
A C T
IO
N
D A T E F W D
T O A P P R
A U T H
D A T E R
C D
F R O M
C O N T R
D A T E F W D
T O O
T H E R
R E V
IE
W E R
D A T E R
C D
F R O M O
T H
R E V
IE
W E R
A C T I O N C O D E
D A T E
O F
A C T
IO
N
M A
IL
E D
T O
C O N T R
D A T E R
C D
F R M A P P R
A U T H
R E M A R K S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T A L F O R M ,J a n
P R E V
IO
U S E D
IT
IO
N I S O
B S O L E T E
P A G E O
F P A G E S
M E T A L S E E D S T O R A G E B U
IL
D
IN
G
.3
T h e rm a l- B a rr ie r W in d o w s
.2 .7
S c re e n s
.2 .2
W e a th e rs tr ip p in g
.2 .5
A c c e s s o ri e s
S D -0 S a m p le s
.4 .2 .1
F in is h S a m p le
S D -0 D e s ig n D a ta
.1
S tr u c tu ra l c a lc u la ti o n s f o r d e fl e c ti o n
S D -0 T e s t R e p o rt s
.4 .1
A A M A /W
D M A /C
S A
/1 .S .5 /A
S D -1 O p e ra ti o n a n d M a in te n a n c e
D a ta
.1
W in d o w s
S D -0 S h o p D ra w in g s
.3
H a rd w a re s c h e d u le
.2 .4
K e y in g s y s te m
S D -0 P ro d u c t D a ta
.2
H a rd w a re i te m s
S D -0 M a n u fa c tu re r’ s I n s tr u c ti o n s
.1
In s ta lla ti o n
S D -1 O p e ra ti o n a n d M a in te n a n c e
D a ta
.3
H a rd w a re S c h e d u le
S D -1 C lo s e o u t S u b m it ta lsS U B M
IT
T A L R E G
IS
T E R
C O N T R A C T N
O
T
IT
L E A N D L O C A T
IO
N C O N T R A C T O R
C O N T R A C T O R
S C H E D U L E D A T E S
C O N T R A C T O R
A C T
IO
N A P P R O V
IN
G A U T H O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E S C R
IP
T
IO
N
IT
E M S U B M
IT
T E D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S U B M
IT
A P P R O V A L
N E E D E D
B Y
M A T E R
IA
L
N E E D E D
B Y
A C T I O N C O D E
D A T E
O F
A C T
IO
N
D A T E F W D
T O A P P R
A U T H
D A T E R
C D
F R O M
C O N T R
D A T E F W D
T O O
T H E R
R E V
IE
W E R
D A T E R
C D
F R O M O
T H
R E V
IE
W E R
A C T I O N C O D E
D A T E
O F
A C T
IO
N
M A
IL
E D
T O
C O N T R
D A T E R
C D
F R M A P P R
A U T H
R E M A R K S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T A L F O R M ,J a n
P R E V
IO
U S E D
IT
IO
N I S O
B S O L E T E
P A G E O
F P A G E S
M E T A L S E E D S T O R A G E B U
IL
D
IN
G
.4
K e y B it ti n g
S D -0 P ro d u c t D a ta
.2
In s u la ti n g G la s s U n it s
.3
G la z in g A c c e s s o ri e s
S D -0 C e rt if ic a te s
.6 .1
In s u la ti n g G la s s W a rr a n ty
.3
G la z in g A c c e s s o ri e s
S D -0 M a n u fa c tu re r’ s I n s tr u c ti o n s
.3
S e tt in g a n d s e a lin g m a te ri a ls
.2
G la s s s e tt in g
S D -0 P re c o n s tr u c ti o n S u b m it ta ls
.6 .3
M a n u fa c tu re r' s Q u a lif ic a ti o n s
S D -0 S h o p D ra w in g s
.6 .1
D e ta il D ra w in g s
S D -0 P ro d u c t D a ta
.6 .1
M a n u fa c tu re r' s c a ta lo g d a ta
S D -0 S a m p le s
.6 .1
C o il S to c k
.1 .8
C o il S to c k
.2 .1 .7
R o o f P a n e ls
.2 .1 .7
W a ll P a n e ls
.5 .2
F a s te n e rs
.4 .3
M a n u fa c tu re r' s c o lo r c h a rt s a n d c h ip s
S D -0 D e s ig n D a ta
S U B M
IT
T A L R E G
IS
T E R
C O N T R A C T N
O
T
IT
L E A N D L O C A T
IO
N C O N T R A C T O R
C O N T R A C T O R
S C H E D U L E D A T E S
C O N T R A C T O R
A C T
IO
N A P P R O V
IN
G A U T H O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E S C R
IP
T
IO
N
IT
E M S U B M
IT
T E D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S U B M
IT
A P P R O V A L
N E E D E D
B Y
M A T E R
IA
L
N E E D E D
B Y
A C T I O N C O D E
D A T E
O F
A C T
IO
N
D A T E F W D
T O A P P R
A U T H
D A T E R
C D
F R O M
C O N T R
D A T E F W D
T O O
T H E R
R E V
IE
W E R
D A T E R
C D
F R O M O
T H
R E V
IE
W E R
A C T I O N C O D E
D A T E
O F
A C T
IO
N
M A
IL
E D
T O
C O N T R
D A T E R
C D
F R M A P P R
A U T H
R E M A R K S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T A L F O R M ,J a n
P R E V
IO
U S E D
IT
IO
N I S O
B S O L E T E
P A G E O
F P A G E S
M E T A L S E E D S T O R A G E B U
IL
D
IN
G
.6 .1 d e s c ri p ti v e a n d t e c h n ic a l lit e ra tu re
.6 .1 b u ild in g d e s ig n a n a ly s is
S D -0 T e s t R e p o rt s
.6 .1
T e s t re p o rt s
.6 .1
C o a ti n g s a n d b a s e m e ta ls
.6 .1
F a c to ry C o lo r F in is h P e rf o rm a n c e
R e q u ir e m e n ts
S D -0 C e rt if ic a te s
.6 .1
S y s te m c o m p o n e n ts
.6 .1
C o il S to c k
.1 .8
C o il S to c k
.6 .1
A lu m in iz e d S te e l R e p a ir P a in t
.6 .1
G a lv a n iz in g R e p a ir P a in t
.6 .1
E n a m e l R e p a ir P a in t
.6 .1
Q u a lif ic a ti o n o f M a n u fa c tu re r
.6 .1
Q u a lif ic a ti o n o f E re c to r
S D -0 M a n u fa c tu re r’ s I n s tr u c ti o n s
.7
S h ip p in g h a n d lin g a n d s to ra g e
S D -1 C lo s e o u t S u b m it ta ls
.1 .1
M a n u fa c tu re r' s W a rr a n ty
.1 .2
C o n tr a c to r' s W a rr a n ty f o r
In s ta lla ti o n
S D -0 S h o p D ra w in g s
.4 .4
D e ta il D ra w in g s
S D -0 P ro d u c t D a ta
S U B M
IT
T A L R E G
IS
T E R
C O N T R A C T N
O
T
IT
L E A N D L O C A T
IO
N C O N T R A C T O R
C O N T R A C T O R
S C H E D U L E D A T E S
C O N T R A C T O R
A C T
IO
N A P P R O V
IN
G A U T H O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E S C R
IP
T
IO
N
IT
E M S U B M
IT
T E D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S U B M
IT
A P P R O V A L
N E E D E D
B Y
M A T E R
IA
L
N E E D E D
B Y
A C T I O N C O D E
D A T E
O F
A C T
IO
N
D A T E F W D
T O A P P R
A U T H
D A T E R
C D
F R O M
C O N T R
D A T E F W D
T O O
T H E R
R E V
IE
W E R
D A T E R
C D
F R O M O
T H
R E V
IE
W E R
A C T I O N C O D E
D A T E
O F
A C T
IO
N
M A
IL
E D
T O
C O N T R
D A T E R
C D
F R M A P P R
A U T H
R E M A R K S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T A L F O R M ,J a n
P R E V
IO
U S E D
IT
IO
N I S O
B S O L E T E
P A G E O
F P A G E S
M E T A L S E E D S T O R A G E B U
IL
D
IN
G
.7 .2
M a n u a l B a la n c in g D a m p e rs
.7 .4
A ir V e n ts L o u v e rs a n d
G o o s e n e c k s
.8 .1 .1
C e n tr if u g a l F a n s
.8 .1 .2
P a n e l T y p e P o w e r W a ll
V e n ti la to rs
.8 .1 .3
C e n tr if u g a l T y p e P o w e r W a ll
V e n ti la to rs
.4 .5
T e s t P ro c e d u re s
S D -0 T e s t R e p o rt s
.8
P e rf o rm a n c e T e s ts
S D -0 C e rt if ic a te s
.4 .1
B o lt s
S D -0 M a n u fa c tu re r’ s I n s tr u c ti o n s
.2
M a n u fa c tu re r' s I n s ta lla ti o n
In s tr u c ti o n s
.1 .2
O p e ra ti o n a n d M a in te n a n c e
T ra in in g
S D -1 O p e ra ti o n a n d M a in te n a n c e
D a ta
.1 .1
O p e ra ti o n a n d M a in te n a n c e
M a n u a ls
.7 .2
M a n u a l B a la n c in g D a m p e rs
.8 .1 .1
C e n tr if u g a l F a n s
.8 .1 .2
P a n e l T y p e P o w e r W a ll
V e n ti la to rs
S U B M
IT
T A L R E G
IS
T E R
C O N T R A C T N
O
T
IT
L E A N D L O C A T
IO
N C O N T R A C T O R
C O N T R A C T O R
S C H E D U L E D A T E S
C O N T R A C T O R
A C T
IO
N A P P R O V
IN
G A U T H O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E S C R
IP
T
IO
N
IT
E M S U B M
IT
T E D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S U B M
IT
A P P R O V A L
N E E D E D
B Y
M A T E R
IA
L
N E E D E D
B Y
A C T I O N C O D E
D A T E
O F
A C T
IO
N
D A T E F W D
T O A P P R
A U T H
D A T E R
C D
F R O M
C O N T R
D A T E F W D
T O O
T H E R
R E V
IE
W E R
D A T E R
C D
F R O M O
T H
R E V
IE
W E R
A C T I O N C O D E
D A T E
O F
A C T
IO
N
M A
IL
E D
T O
C O N T R
D A T E R
C D
F R M A P P R
A U T H
R E M A R K S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T A L F O R M ,J a n
P R E V
IO
U S E D
IT
IO
N I S O
B S O L E T E
P A G E O
F P A G E S
M E T A L S E E D S T O R A G E B U
IL
D
IN
G
S D -0 P re c o n s tr u c ti o n S u b m it ta ls
.3
R e c o rd s o f E x is ti n g C o n d it io n s
.5 .3 .1
T A B F ir m
.2
T A B t e a m a s s is ta n ts
.2
T A B t e a m e n g in e e r
.2
T A B t e a m f ie ld l e a d e r
.5 .3 .2
T A B S p e c ia lis t
S D -0 S h o p D ra w in g s
.3 .2
T A B S c h e m a ti c D ra w in g s a n d
R e p o rt F o rm s
S D -0 P ro d u c t D a ta
.3
E q u ip m e n t a n d P e rf o rm a n c e
D a ta
.5 .3 .4
T A B R e la te d H
V A C S u b m it ta ls
.5 .2
T A B P ro c e d u re s
.5 .2
C a lib ra ti o n
.3 .2
S y s te m s R e a d in e s s C h e c k
.5 .4
T A B E x e c u ti o n
S D -0 T e s t R e p o rt s
.5
T A B W o rk E x e c u ti o n S c h e d u le
.5
T A B P ro c e d u re s S u m m a ry
.2 .6
T A B r e p o rt s
S D -0 C e rt if ic a te s
.5 .1
In d e p e n d e n t T A B a g e n c y a n d p e rs o n n e l q u a lif ic a ti o n sS U B M
IT
T A L R E G
IS
T E R
C O N T R A C T N
O
T
IT
L E A N D L O C A T
IO
N C O N T R A C T O R
C O N T R A C T O R
S C H E D U L E D A T E S
C O N T R A C T O R
A C T
IO
N A P P R O V
IN
G A U T H O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E S C R
IP
T
IO
N
IT
E M S U B M
IT
T E D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S U B M
IT
A P P R O V A L
N E E D E D
B Y
M A T E R
IA
L
N E E D E D
B Y
A C T I O N C O D E
D A T E
O F
A C T
IO
N
D A T E F W D
T O A P P R
A U T H
D A T E R
C D
F R O M
C O N T R
D A T E F W D
T O O
T H E R
R E V
IE
W E R
D A T E R
C D
F R O M O
T H
R E V
IE
W E R
A C T I O N C O D E
D A T E
O F
A C T
IO
N
M A
IL
E D
T O
C O N T R
D A T E R
C D
F R M A P P R
A U T H
R E M A R K S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T A L F O R M ,J a n
P R E V
IO
U S E D
IT
IO
N I S O
B S O L E T E
P A G E O
F P A G E S
M E T A L S E E D S T O R A G E B U
IL
D
IN
G
.5 .1
In d e p e n d e n t T A B a g e n c y a n d p e rs o n n e l q u a lif ic a ti o n s
.5 .3 .1
T A B F ir m
.6 .1
T A B S u b m it ta l a n d W o rk
S c h e d u le
.6 .3
T A B S u b m it ta l a n d W o rk
S c h e d u le
.6 .3
A d v a n c e d n o ti c e f o r T A B f ie ld w o rk
.6 .3
P re re q u is it e H
V A C W o rk C h e c k
O u t L is t
S D -0 S h o p D ra w in g s
.2 .1
F a b ri c a ti o n D ra w in g s
S D -0 P ro d u c t D a ta
.2 .1
E q u ip m e n t a n d P e rf o rm a n c e
D a ta
.1
E le c tr ic U n it H e a te rs
.2 .1
H e a ti n g E le m e n t
.2 .2
C o n tr o ls
.1 .1
C a s in g s
.2 .3
P ro p e lle rs a n d M o to rs
S D -0 M a n u fa c tu re r’ s I n s tr u c ti o n s
.2 .1
M a n u fa c tu re r' s I n s tr u c ti o n s
S D -0 P re c o n s tr u c ti o n S u b m it ta ls
.1
M a te ri a l, E q u ip m e n t, a n d F ix tu re
L is ts
S U B M
IT
T A L R E G
IS
T E R
C O N T R A C T N
O
T
IT
L E A N D L O C A T
IO
N C O N T R A C T O R
C O N T R A C T O R
S C H E D U L E D A T E S
C O N T R A C T O R
A C T
IO
N A P P R O V
IN
G A U T H O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E S C R
IP
T
IO
N
IT
E M S U B M
IT
T E D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S U B M
IT
A P P R O V A L
N E E D E D
B Y
M A T E R
IA
L
N E E D E D
B Y
A C T I O N C O D E
D A T E
O F
A C T
IO
N
D A T E F W D
T O A P P R
A U T H
D A T E R
C D
F R O M
C O N T R
D A T E F W D
T O O
T H E R
R E V
IE
W E R
D A T E R
C D
F R O M O
T H
R E V
IE
W E R
A C T I O N C O D E
D A T E
O F
A C T
IO
N
M A
IL
E D
T O
C O N T R
D A T E R
C D
F R M A P P R
A U T H
R E M A R K S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T A L F O R M ,J a n
P R E V
IO
U S E D
IT
IO
N I S O
B S O L E T E
P A G E O
F P A G E S
M E T A L S E E D S T O R A G E B U
IL
D
IN
G
S D -0 P ro d u c t D a ta
.1 .1
C o n d u it s a n d R a c e w a y s
.1 .2
W ir e a n d C a b le
.1 .1 .6
S p lic e s a n d C o n n e c to rs
.1 .3
S w it c h e s
.1 .4
R e c e p ta c le s
.1 .5
O u tl e ts O u tl e t B o x e s a n d P u ll
B o x e s
.1 .6
C ir c u it B re a k e rs
.1 .7
L a m p s a n d L ig h ti n g F ix tu re s
S D -0 M a n u fa c tu re r’ s I n s tr u c ti o n s
P a rt
M a n u fa c tu re r' s I n s tr u c ti o n s
S D -0 P ro d u c t D a ta
.1
In s ta lla ti o n I n s tr u c ti o n s
S D -0 P ro d u c t D a ta
.1 .1
P h o to c o n d u c ti v e C o n tr o l D e v ic e s
.2 .1
O c c u p a n c y S e n s o rs
S D -0 P ro d u c t D a ta
.2 .1
F lu o re s c e n t L ig h ti n g F ix tu re s
.2 .1 .1
F lu o re s c e n t E le c tr o n ic B a lla s ts
S D -1 O p e ra ti o n a n d M a in te n a n c e
D a ta
.3 .1
O p e ra ti o n a l S e rv ic e
S D -0 P ro d u c t D a ta
.2 .1
E m e rg e n c y L ig h ti n g E g re s s U n it s
S D -0 T e s t R e p o rt s
S U B M
IT
T A L R E G
IS
T E R
C O N T R A C T N
O
T
IT
L E A N D L O C A T
IO
N C O N T R A C T O R
C O N T R A C T O R
S C H E D U L E D A T E S
C O N T R A C T O R
A C T
IO
N A P P R O V
IN
G A U T H O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E S C R
IP
T
IO
N
IT
E M S U B M
IT
T E D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S U B M
IT
A P P R O V A L
N E E D E D
B Y
M A T E R
IA
L
N E E D E D
B Y
A C T I O N C O D E
D A T E
O F
A C T
IO
N
D A T E F W D
T O A P P R
A U T H
D A T E R
C D
F R O M
C O N T R
D A T E F W D
T O O
T H E R
R E V
IE
W E R
D A T E R
C D
F R O M O
T H
R E V
IE
W E R
A C T I O N C O D E
D A T E
O F
A C T
IO
N
M A
IL
E D
T O
C O N T R
D A T E R
C D
F R M A P P R
A U T H
R E M A R K S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T A L F O R M ,J a n
P R E V
IO
U S E D
IT
IO
N I S O
B S O L E T E
P A G E O
F P A G E S
M E T A L S E E D S T O R A G E B U
IL
D
IN
G
.2
S y s te m O p e ra ti o n a l T e s ts
S D -1 C lo s e o u t S u b m it ta ls
.3
W a rr a n ty
S D -0 P re c o n s tr u c ti o n S u b m it ta ls
.2 .1
M a te ri a l, E q u ip m e n t, a n d F ix tu re
L is ts
S D -0 S h o p D ra w in g s
.2 .1
E x it L ig h ti n g U n it s
.2
E x it L ig h ti n g U n it s
S D -0 P ro d u c t D a ta
.2 .1
E x it L ig h ti n g U n it s
.2
E x it L ig h ti n g U n it s
S D -0 T e s t R e p o rt s
.2
O p e ra ti o n a l T e s ts
S D -0 C e rt if ic a te s
.2 .1
E n e rg y E ff ic ie n c ie s
.1 .1
E n e rg y E ff ic ie n c ie s
S D -0 P re c o n s tr u c ti o n S u b m it ta ls
.6 .1
L E D L u m in a ir e W a rr a n ty
S D -0 P ro d u c t D a ta
.2
L E D L u m in a ir e s
.2 .2
L u m in a ir e a n d P o w e r S u p p ly
U n it s D ri v e rs
.3 .1
M o ti o n S e n s o r
S D -0 T e s t R e p o rt s
S U B M
IT
T A L R E G
IS
T E R
C O N T R A C T N
O
T
IT
L E A N D L O C A T
IO
N C O N T R A C T O R
C O N T R A C T O R
S C H E D U L E D A T E S
C O N T R A C T O R
A C T
IO
N A P P R O V
IN
G A U T H O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E S C R
IP
T
IO
N
IT
E M S U B M
IT
T E D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S U B M
IT
A P P R O V A L
N E E D E D
B Y
M A T E R
IA
L
N E E D E D
B Y
A C T I O N C O D E
D A T E
O F
A C T
IO
N
D A T E F W D
T O A P P R
A U T H
D A T E R
C D
F R O M
C O N T R
D A T E F W D
T O O
T H E R
R E V
IE
W E R
D A T E R
C D
F R O M O
T H
R E V
IE
W E R
A C T I O N C O D E
D A T E
O F
A C T
IO
N
M A
IL
E D
T O
C O N T R
D A T E R
C D
F R M A P P R
A U T H
R E M A R K S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
B M
IT
T A L F O R M ,J a n
P R E V
IO
U S E D
IT
IO
N I S O
B S O L E T E
P A G E O
F P A G E S
M E T A L S E E D S T O R A G E B U
IL
D
IN
G
.5 .1
L E D L u m in a ir e I E S L M -7 T e s t
R e p o rt
.5 .2
L E D L ig h t S o u rc e I E S L M -8
T e s t R e p o rt
S D -0 C e rt if ic a te s
.6 .1
L u m in a ir e U s e fu l L if e C e rt if ic a te
S D -0 T e s t R e p o rt s
.1 .2 .1
F ill a n d b a c k fi ll
.1 .2 .2
S e le c t m a te ri a l
.1 .2 .3
P o ro u s f ill
.1 .2 .4
D e n s it y t e s ts
S D -0 P ro d u c t D a ta
.4 .4
E q u ip m e n t
S D -0 T e s t R e p o rt s
.4
S a m p lin g a n d T e s ti n g
S U B M
IT
T A L R E G
IS
T E R
C O N T R A C T N
O
T
IT
L E A N D L O C A T
IO
N C O N T R A C T O R
C O N T R A C T O R
S C H E D U L E D A T E S
C O N T R A C T O R
A C T
IO
N A P P R O V
IN
G A U T H O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D E S C R
IP
T
IO
N
IT
E M S U B M
IT
T E D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R S U B M
IT
A P P R O V A L
N E E D E D
B Y
M A T E R
IA
L
N E E D E D
B Y
A C T I O N C O D E
D A T E
O F
A C T
IO
N
D A T E F W D
T O A P P R
A U T H
D A T E R
C D
F R O M
C O N T R
D A T E F W D
T O O
T H E R
R E V
IE
W E R
D A T E R
C D
F R O M O
T H
R E V
IE
W E R
A C T I O N C O D E
D A T E
O F
A C T
IO
N
M A
IL
E D
T O
C O N T R
D A T E R
C D
F R M A P P R
A U T H
R E M A R K S
(a
(b
(c
(d
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
SECTION 01 50 00 Page 1
SECTION 01 50 00
PROJECT CLOSEOUT
1.1 AS-BUILT DRAWINGS
At the completion of the project, the Contracting Officer will furnish the
Contractor, free of charge, one set of drawings on which the Contractor will indicate all variations in locations, construction, equipment, etc.
from that shown on the original Drawings.
1.2 SUBSTANTIAL COMPLETION AND COMPLETION OF PUNCH LIST CORRECTIONS
Set date and notify Contracting Officer as to time construction will be ready for preliminary punch list and, upon completion of that list, set time and date for inspection of punch list corrections. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. When the Contracting Officer on the basis of an inspection, determines that the Work or designated portion thereof is sufficiently complete, in accordance with the Contract Documents, so that the Owner or separate contractors can occupy or utilize the Work or designated portion thereof for the use for which it is intended, he will prepare a Certificate of Substantial Completion which shall establish the Date of Substantial Completion, shall state the responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work, and insurance, and shall fix the time within which the Contractor shall complete the items listed therein or attached thereto. Warranties required by the Contract Documents shall commence on the Date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. The Certificate of Substantial Completion shall be submitted to the Owner and the Contractor for their written acceptance of the responsibilities assigned to them in such Certificate.
1.3 FINAL INSPECTION
The Contractor shall notify the Contracting Officer and Owner in writing 10 days prior to the date that the project will be ready for final inspection.
An inspection of the project will be made by the Contracting Officer and Contractor at a mutually agreed upon time. If the project is complete, in the opinion of the Contracting Officer, the Contracting Officer shall issue a certificate as set forth hereinafter. Minor unfinished items of work may be excluded from the certificate. The Contracting Officer and Contractor shall mutually agree on a date for the completion of these items of work.
Should the Contractor fail to complete the work within the agreed time, the Owner shall have the option of having the unfinished work completed.
1.4 RELEASE OF LIENS AND CERTIFICATION ALL BILLS ARE PAID
The Contractor, before final acceptance is given by the Contracting Officer, shall furnish for himself and all sub-contractors, in triplicate, duly
SECTION 01 50 00 Page 2 certified by a notary, a full release of liens, damages, and a guarantee that all materials and labor are paid in accordance with the Contractual Documents.
1.5 GUARANTEE
The Contractor, before final acceptance by the Contracting Officer, shall furnish the Owner, in triplicate, a written notarized guarantee. All Contractors shall guarantee their work for a period of one year from the date of Substantial Completion as stated by the Contracting Officer.
Neither the final Certificate for Payment, nor any provision in the Contract Documents shall relieve the contractors of their responsibility for negligence or defective materials or workmanship within the extent and period covered by law; and upon written notice he shall remedy any defects due thereto, and pay all expenses for any damages to other work resulting therefrom. Emergency defective workmanship and defective materials within the year's guarantee shall be corrected within a few days after receipt of a written order from the Contracting Officer. Any items that are not considered of an emergency nature by the Contracting Officer may be corrected prior to the expiration of the Guarantee period.
1.5.1 The wording for the Guarantee shall be as follows:
"We hereby guarantee all work performed by us on the above captioned project to be free from defective materials and workmanship for a period of one year, or for such longer period of time as may be called for in the Contractual Documents for such portions of the work."
1.6 OTHER FINAL DOCUMENTS
Deliver to the Owner, through the Contracting Officer, all required bonds, warranties, individual guarantees, etc. that are required by the various following sections of these specifications.
1.7 ACCEPTANCE
Upon satisfactory submittal of the above documents the Contracting Officer shall issue to the Owner a certificate recommending final acceptance of the project. Minor unfinished items of work may be listed on the certificate and excepted from final acceptance. A sum sufficient to cover the cost of completing these unfinished items of work will be withheld by the Owner from the final payment. All other funds including retainage shall be due and payable upon receipt by the Owner of the Contracting Officer's certificate.
Upon certification by the Contracting Officer that the items of work have been completed, all monies withheld by the Owner shall be due the Contractor.
SECTION 01 57 50 Page 1
SECTION 01 57 50
TEMPORARY ENVIRONMENTAL CONTROLS
1.1 APPLICABLE PUBLICATIONS
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
ENVIRONMENTAL PROTECTION AGENCY (EPA)
40 CFR 112 Regulations on Oil Pollution Prevention
40 CFR 261 Regulations Identifying Hazardous Waste
40 CFR 262 Regulations for Hazardous Waste Generators
40 CFR 263 Regulations for Hazardous Waste Transporters
40 CFR 264 Regulations for Owners and Operators of Permitted
Hazardous Waste Facilities
40 CFR 403 General Pretreatment Standards
PL 96 510 Comprehensive Environmental Response Compensation and Liability Act of 1980
DEPARTMENT OF TRANSPORTATION (DOT)
49 CFR 171 Standards for Transportation of Hazardous Materials
49 CFR 172 Hazardous Materials Tables and Regulations
49 CFR 178 Regulations for Shipping Container Specifications
1.2 DEFINITIONS
1.2.1 Sediment
Soil and other debris that have eroded and have been transported by runoff water or wind.
1.2.2 Solid Waste
Rubbish, debris, garbage, and other discarded solid materials, except hazardous waste as defined in paragraph entitled, "Hazardous Waste," resulting from industrial, commercial, and agricultural operations and from community activities.
1.2.3 Rubbish
Combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.
1.2.4 Debris
Combustible and noncombustible wastes such as ashes and waste materials
SECTION 01 57 50 Page 2 resulting from construction or maintenance and repair work, leaves, and tree trimmings.
1.2.5 Chemical Waste
This includes salts, acids, alkalies, herbicides, pesticides, and organic chemicals.
1.2.6 Sanitary Wastes
1.2.6.1 Sewage
Waste characterized as domestic sanitary sewage.
1.2.6.2 Garbage
Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.
1.2.7 Hazardous Waste
Hazardous substances as defined in 40 CFR 261 or as defined by applicable state and local regulations.
1.2.8 Oily Waste
Petroleum products and bituminous materials.
1.2.9 Landscape Features
Trees, plants, shrubs and ground covers.
1.2.10 Hazardous Substances
As defined in EPA PL 96-510.
1.2.11 Hazardous Materials
As defined in DOT Regulation 49 CFR 171 and listed in 49 CFR 172.
1.3 ENVIRONMENTAL PROTECTION REQUIREMENTS
Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with Federal, state, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances and noise pollution.
PART 2 EXECUTION
2.1 NATURAL RESOURCES
Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work. Confine construction activities to within the limits of the work indicated or specified.
SECTION 01 57 50 Page 3
2.1.1 Landscape Features
Do not remove, cut, deface, injure, or destroy existing landscape features without the Contracting Officer's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages, unless authorized by the Contracting Officer. Where such use of attach ropes, cables, or guys is authorized, the Contractor shall be responsible for any resultant damage.
2.1.1.1 Protection
Protect existing landscape features which are to remain and which may be injured, bruised, defaced, or otherwise damaged by construction operations.
By approved excavation, remove trees with 30 percent or more of their root systems destroyed.
2.1.1.2 Replacement
Remove existing landscape features scarred or damaged by equipment operations, and replace with equivalent, undamaged features. Obtain the Contracting Officer's approval before replacement.
2.1.2 Water Resources
2.1.2.1 Oily and Hazardous Substances
Prevent oily or other hazardous substances from entering the ground, drainage areas, or local bodies of water. Take precautions to ensure that no oil or other hazardous material is released to the water, land, sanitary sewer system, or storm sewer system. Environmental requirements for the prevention of oil spills are contained in 40 CFR 112. For oil and hazardous substance spills which may be large enough to violate Federal, State or Local Regulations, the Contracting Officer shall be verbally notified immediately. Clean up any spills of oil or hazardous substances which result from the Contractor's operations. If the Contractor can not clean up any spill in a timely manner, the Government will perform the cleanup at the Contractor's expense.
2.1.3 Fish and Wildlife Resources
Do not disturb fish and wildlife. Do not alter water flows or otherwise disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as indicated or specified.
2.2 HISTORICAL AND ARCHEOLOGICAL RESOURCES
Carefully preserve and report immediately to the Contracting Officer items having possible historical or archeological interest which are discovered in the course of work. Protect monuments, markers, and works of art.
2.3 EROSION AND SEDIMENT CONTROL
2.3.1 Burnoff
Burnoff of the ground cover is prohibited.
2.3.2 Protection of Erodible Soils
Immediately finish the earthwork brought to a final grade, as indicated or specified. Immediately protect the side slopes and back slopes upon completion of rough grading. Plan and conduct earthwork to minimize the
SECTION 01 57 50 Page 4 duration of exposure of unprotected soils.
2.3.3 Temporary Protection of Erodible Soils
Provide the following methods to prevent erosion and control sedimentation.
2.3.3.1 Mechanical Retardation and Control of Runoff
Mechanically retard and control the rate of runoff from the construction site. Provide diversion ditches, benches, and berms to retard and divert runoff to protected drainage courses.
2.3.3.2 Seeding
Provide seeding where ground is disturbed. Include topsoil or nutriment during the seeding operation necessary to establish or re-establish a suitable stand of grass.
2.4 SOLID AND SANITARY WASTES
Pick up solid wastes, and place in containers which are regularly emptied.
Prevent contamination of the site and other areas when handling and disposing wastes. On completion, leave the areas clean. Control and dispose of wastes.
2.4.1 Disposal of Solid Wastes
Dispose of solid wastes in accordance with the requirements specified.
2.4.1.1 Removal From Government Property
Remove solid wastes from Government property.
2.4.2 Garbage Disposal
Place garbage in approved containers, and move to a pickup point or disposal area, where directed.
2.4.3 Sewage, Odor, and Pest Control
Di…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .