Section B - Schedule of Items.pdf

PDF 53 KB Posted

Attached to
RECOVERY* Trail Maintenance, Panthertown Trails, Nantahala National Forest, North Carolina
Solicitation number
AG-4419-S-10-0755
Issued by

About this file

Section B - Schedule of Items

View the file

Other files

File Type Posted
Exhibit 2 - Map.pdf PDF
Attachment 2 - Wage Determination.doc DOC document
Section A - SF 1449.pdf PDF
Exhibit 4 - Trail Logs Combined.pdf PDF
Sections C thru M - Solicitation.doc DOC document
Exhibit 3 - Design Parameters Hike Bike Horse.pdf PDF
Attachment 1 - Specifications SOW.pdf PDF
Exhibit 1 - Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIM-0811-04T Package 9 NA TRAIL NAME

Base Bid Base Bid Optional Item

DESCRIPTION Unit Unit Price Qty Panthertown, Devil's Elbow Qty

Great Wall Trail (Sta 0+00 to Sta 21+20) Qty

Great Wall Trail (Sta 21+20 to 90+19)

Existing trail restoration (de-berming, outsloping, regrading, returning tread to original location, stump & root removal, etc.), cleaning & maintenance of exist. drainage structures & installation of new drainage structures (grade dips, drainage ditches, etc.), trail-head obliteration, switchback improvements Mile 1.5 0.4 1.3 Brush-cutting, Logging out, Danger tree removal Mile 1.5 0.4 1.3

Add compacted fill to trail tread SF 340 2,100 60 Install Armored Approaches at Water Crossings - Stone SF 0 60 240

Install Armored Approaches at Water Crossings - Grassy Pavers SF 320 0 120

Install Crib Wall SF 0 190 0

Install Terraced Riser Steps Each 0 34 0

Install L- Box Crib Steps Each 0 146 0

BID AMOUNT PER TRAIL - SUBTOTALS

Base Bid Total

Optional Item Total

Total Bid Amount (Base + Optional Items)

Contractor shall start work as soon as possible after award is made and no later than 9/30/2010.

Bidders must provide prices on all items to be considered for award. One award will be made for this solicitation.

All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.

Work for which a specific bid item is not provided is a subsidiary obligation of the Contractor.

Payment for such work is indirectly included under other pay items shown in the bid schedule.

Schedule of Items

Sheet1

File details come from the government source that posted it. Updated .