Section B - Schedule of Items

View the file

Other files

File Type Posted
Attachment 2 - Wage Determination.doc DOC document
Exhibit 3 - Map BHT 1-2.pdf PDF
Exhibit 4 - Map BHT 2-3.pdf PDF
Sections C thru M - Solicitation .doc DOC document
Attachment 3 - Combined Trail Logs.pdf PDF
Exhibit 5 - Map Big Butt 2.21.10.pdf PDF
Section A - SF1449.pdf PDF
Exhibit 2 - Drawings.pdf PDF
Attachment 1 - Specifications SOW.pdf PDF
Exhibit 1 - Design Parameters.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAIL NAME

Base Bid Base Bid Optional Item Optional Item

UNIT Big Butt Trail Buncombe Horse Trail Buncombe Horse Trail Buncombe Horse Trail DESCRIPTION UNIT PRICE QTY QTY Sections 1 & 2A QTY Section 2B QTY Section 3

Existing trail restoration (de-berming, outsloping, filling, returning tread to original location, stump & root removal, etc.), cleaning & maintenance of exist. drainage structures & installation of new drainage structures (grade dips, drainage ditches, etc.), trail obliteration, switchback improvements Mile 5.2 6.3 2.3 6.0

Corridor Clearing, Brush Cutting, Logging Out Mile 5.2 6.3 2.3 6.0

Hazard/ Danger tree removal Mile 5.2 6.3 2.3 6.0

Install Armored Approaches at Water Crossings SF 0 1,820 760 3,360

Armoring: Geogrid covered with compacted 6-inch layer #4 RR ballast, topped with 3-inch layer washed gravel (1" gravel) LF 0 0 70 0

Install Turnpike - Type I LF 470 340 90 390

Install Box Steps (Full or L-) EACH 390 20 0 70

Install Riser / Terraced Steps EACH 0 40 0 20

Crib Wall SF 0 200 360 230

BID AMOUNT PER TRAIL - SUBTOTALS

Base Bid Total Amount

Optional Items Bid Total Amount

TOTAL BID AMOUNT (BASE + OPTIONS)

Contractor shall start work as soon as possible after award is made and no later than 9/30/2010.

Bidders must provide prices on all items to be considered for award. One award will be made for this solicitation.

All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.

Work for which a specific bid item is not provided is a subsidiary obligation of the Contractor.

Payment for such work is indirectly included under other pay items shown in the bid schedule.

Schedule of Items CIM-0811-04T Package 3 AP