Section B - Schedule of Items.pdf
PDF 56 KB Posted
- Attached to
- Recovery* Trail Maintenance project, Yancey County, Pisgah National Forest, North Carolina
- Solicitation number
- AG-4419-S-10-0751
About this file
Section B - Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Wage Determination.doc | DOC document | |
| Exhibit 3 - Map BHT 1-2.pdf | ||
| Exhibit 4 - Map BHT 2-3.pdf | ||
| Sections C thru M - Solicitation .doc | DOC document | |
| Attachment 3 - Combined Trail Logs.pdf | ||
| Exhibit 5 - Map Big Butt 2.21.10.pdf | ||
| Section A - SF1449.pdf | ||
| Exhibit 2 - Drawings.pdf | ||
| Attachment 1 - Specifications SOW.pdf | ||
| Exhibit 1 - Design Parameters.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRAIL NAME
Base Bid Base Bid Optional Item Optional Item
UNIT Big Butt Trail Buncombe Horse Trail Buncombe Horse Trail Buncombe Horse Trail DESCRIPTION UNIT PRICE QTY QTY Sections 1 & 2A QTY Section 2B QTY Section 3
Existing trail restoration (de-berming, outsloping, filling, returning tread to original location, stump & root removal, etc.), cleaning & maintenance of exist. drainage structures & installation of new drainage structures (grade dips, drainage ditches, etc.), trail obliteration, switchback improvements Mile 5.2 6.3 2.3 6.0
Corridor Clearing, Brush Cutting, Logging Out Mile 5.2 6.3 2.3 6.0
Hazard/ Danger tree removal Mile 5.2 6.3 2.3 6.0
Install Armored Approaches at Water Crossings SF 0 1,820 760 3,360
Armoring: Geogrid covered with compacted 6-inch layer #4 RR ballast, topped with 3-inch layer washed gravel (1" gravel) LF 0 0 70 0
Install Turnpike - Type I LF 470 340 90 390
Install Box Steps (Full or L-) EACH 390 20 0 70
Install Riser / Terraced Steps EACH 0 40 0 20
Crib Wall SF 0 200 360 230
BID AMOUNT PER TRAIL - SUBTOTALS
Base Bid Total Amount
Optional Items Bid Total Amount
TOTAL BID AMOUNT (BASE + OPTIONS)
Contractor shall start work as soon as possible after award is made and no later than 9/30/2010.
Bidders must provide prices on all items to be considered for award. One award will be made for this solicitation.
All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.
Work for which a specific bid item is not provided is a subsidiary obligation of the Contractor.
Payment for such work is indirectly included under other pay items shown in the bid schedule.