Pinnacle Tower Rehabilitation July 8, 2010 10:00 AM
Cherokee National Forest Nolichucky Ranger District Solicitation No: AG-4419-S-10-0729
Meeting was at the Watauga Ranger District. Everyone signed in and met in the large conference room.
Lynn DiFiore and Joyce Eskelsen were in attendance. About 9 contractors were in attendance.
Lynn stated drawings are posted on Fed Business Ops. Amendment Bids due: 7-26-2010 11:00 am
Government estimate $100,000.00 to $250,000.00 and Bonding is required. This is under the American
Recovery and Reinvestment Act & special reporting requirements must be met.
Contract time is 90 calendar days for this project after notice to proceed
Open for questions:
Hoilman Construction Co, Inc. had a list of questions/comments:
1. Refer to Section A/S1 and Section E/S1, is the 3/4” x 3 x 12”-0 flat bar located only on one of the vertical existing angle of the tower or is it on all four vertical angles of the existing tower legs?
Answer: All 4 legs.
2. What work is required at the stairs?
Answer: Reuse existing stringers – add new treads.
3. One side of the existing stair stringer is missing.
Answer: Site visit does not support this statement. All stringers are present.
4. Refer to Railing System Detail 1/S1, there is no information regarding member sizes or spacing of materials for the railing system fabrication. What are the sizes; spacing; and materials to be used for the top cap; mid channel; pickets; bottom channel; and main posts?
Answer: Contractor shall submit shop drawings of dimensions. General characteristics are ¾” square pickets extending to top rail, double top rails, less than 4” opening between pickets.
5. Refer to section A/S1 “El 41’-6 ¾”. What is the elevation relative to?
Answer: Benchmark 0.00 is top of concrete foundation.
6. Refer to sheet S4. Where is section A/S4 cut from? How many times does this section occur (is this for only one location?)
Answer: Should have been a detail, not a section. Detail is showing new concrete foundation for stairs.
7. Refer to sheet S4. Where is Section D/S4 cut from? How many times does this section occur?
Answer: Should have been a detail, not a section. Detail shows mesh installation for handrail on stairs.
8. Refer to D/S4. What kind of mesh is the 2 x 4 x 5/16 Mesh note referring to?
Answer: Steel.
9. Refer to Sheet S4, “Tread Plan View”; noted “Nosing as Specified By Owner”; what is required and how many times does it occur?
Answer: McNichols Type B Standard. Required for every stair tread.
10. S1 shows flat ceiling while S5 appears sloped up. Which is correct?
Answer: Detail 1/S5 shows flat ceiling.
General questions from group:
11. What size are posts?
Answer: Sheet S3 shows TS 6x6
12. Is demolition debris to be removed from site?
Answer: Yes.
13. Is there power on site?
Answer: Yes, available at the existing telecomm building.
14. Are we allowed to store equipment on site?
Answer: Yes, but at contractors risk.
15. Structure of the floor?
Answer: Shown on drawings: McNichols close mesh grating
16. We will need to use welders, what about fire?
Answer:Fight any fire within vicinity of work area. If it turns out contractor's employees caused fire, contractor will not be reimbursed for fire fighting expenses & may be liable for other costs.
17. Does slab come out in the old telecomm building?
Answer: No
18. Do they need to contain the sand on blasting?
Answer: Meet the requirements of Specification 09900 PAINTING.
19. The existing stringer for the stair handrail is bent. Do we need to replace?
Answer: Bid the project as if all existing stringers are functional.
20. How high off the ground is the tower?
Answer: 41’ 6-3/4”