SCOPE OF WORK-SARAHS.docx
DOCX document 1 MB Posted
- Solicitation number
- AG-4419-S-10-0668
About this file
Scope of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1442.pdf | ||
| Location 2 Plans.pdf | ||
| Location 1 Plans.pdf | ||
| Wage Determinations.pdf | ||
| clauses.docx | DOCX document | |
| Schedule of Items.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
for EROSION CONTROL, GRADING, GRUBBING, CLEARING/THINNING, DEMOLITION AND RECONSTRUCTION OF TWO AREAS within
SARAH’S CREEK CAMPGROUND
CHATTOOGA RIVER RANGER DISTRICT
CHATTAHOOCHEE-OCONEE NATIONAL FOREST
MARCH 2010
| This project involves pre-construction, demolition, and reconstruction of one existing toilet site and pre-construction and reconstruction of one new toilet site located at Sarah’s Creek Campground. |
| Bidders are urged to make a site visit prior to bidding. |
| The Contractor shall provide all materials, tools, transportation, labor, proper personnel and environmental protection to successfully complete the project. Proper signage shall be placed, and precautionary measures shall be taken by the Contractor to insure the safety of employees and visitors to the Recreation Area. |
| The work consists of: |
· Phase 1:
· Installation and maintenance of all erosion control measures for grading, demolition and reconstruction at the site throughout the life of the project/contract.
· Removal and thinning of vegetation at direction of COR
· Grading at the direction of COR
· Demolition of an existing toilet, toilet vault, and concrete pad and proper removal off of government land.
· Phase 2:
· Reconstruction of the areas immediately surrounding two new CXT toilets that has been emplaced by others.
· Reconstruction shall include boulder placement, concrete sidewalk construction, concrete parking construction, landscape planting, horse tie rack construction, and finalization of erosion control measures.
| Extreme care shall be taken by the Contractor to prevent damage to existing paving. Any damage caused by the Contractor shall be repaired at the Contractor’s expense as directed by the Contracting Officer’s Representative (C.O.R.). |
| The Contractor shall insure that the job site is left in a clean, neat, and safe condition on a daily basis throughout the life of the project. |
SITE SPECIFICS:
The area known as the Sarah’s Creek Campground covers over 100 acres. It is located in the Northeastern corner of Rabun County. From Clayton, go east on Warwoman Road (Ga. Hwy. 28) for 11.6 miles. Turn left (North) on paved Forest Service Road 157. This road turns to gravel and the camping area is about 2 miles on the left. There are two sites within this campground that will be covered within the Scope of Work.
SITE 1: Plans labeled “Sarah’s Creek Campground Location #1 CXT Installation Locate the bulletin board for the area on the right side of FS Road 157 before the campground begins.
Bulletin Board before campground
Once the bulletin board is reached, proceed onward and cross a double culvert river crossing. Bear to the right and follow this roadway through the campground. On your right a road will bear off and cross a small low-water ford and dead end in a loop. The existing toilet building is located on your left before the loop is reached and can be seen from the ford.
PHASE 1:
1. Install 160 LF of two rows (320 LF total) of Type C Silt Fence along gravel roadway as shown on Erosion Control Plans, Initial Phase. Work to be done before any grading, demolition, or vegetation removal begins.
2. Install Construction Exit that will be 20 feet wide and 70 feet in length per detail on plans. Work to be done before any grading, demolition, or vegetation removal begins.
3. Install 200 LF Tree Save Fence as shown on Erosion Control Plan, Initial Phase. Work to be done before any grading, demolition, or vegetation removal begins.
4. Demolish 5’ x 5’ existing toilet building. Remove from FS land.
5. Demolish 8’ x 8’ concrete slab surrounding toilet, and remove from FS land.
6. Pump contents of existing septic vaults/tank and clean inside with 10% bleach/water solution.
7. Remove and dispose of the vaults/tank. Remove from FS land.
8. Backfill hole with soil. Fill material shall be free of brush, rubbish, rocks, logs and stumps. Compact each 12 inch lift of fill and crown with 6 inches of topsoil.
9. Grade area around toilet to prepare site for the installation of the new toilet.
10. Clear mid-story and understory vegetation surrounding the toilet building area as directed by COR. Approximately 0.2 acre will be cleared and grubbed.
11. Remove all Autumn Olive off government land. Autumn olive shall not be used as mulching material.
12. Strip and stockpile topsoil in areas to be graded. Topsoil is to be stockpiled to complete final grading of areas.
13. Stabilize disturbed areas with appropriate stabilization methods per the Erosion Control Plan, Intermediate Phase. Organic material from clearing of mid-story and understory vegetation should remain stockpiled on site per the COR’s direction and be chipped and applied as mulch if possible in those areas marked Ds1. Wood waste should be applied at a depth of 2” to 3” or 6 to 9 ton/acre.
14. All disturbed areas shall be left with a neat appropriate temporary protective cover.
15. The CXT toilet will be installed by others. This Phase 1 is to prepare site for that to occur.
Example CXT to be installed but with left hand opening, not right hand as shown
PHASE 2:
1. The second phase will not begin until the CXT toilet has been installed by others. Then work can begin on completion of the site improvements.
2. Maintain erosion control measures and Tree Save Fence erosion control measures. Replace if necessary.
3. Purchase and install boulders at direction of COR before concrete is placed. Approx. 24 boulders of various sizes, ranging from 8 cu Ft (2’ x 2’ x2’) to 27 cu Ft (3’ x 3’ x3’). An equal amount of/or range between these will be acceptable.
4. Construct concrete parking area. Parking area is 20’ x 34’ x 6” thick finished concrete. The Parking approach area is 10’x 60’ x 6” thick finished concrete with ACQ treated timber edging 30LF of 6” x 6” #2 S4S Yellow Pine with edges chamfered/beveled 1 inch on top surfaces.
5. Construct concrete walkway to and around building. Area is about 5’ x 62’ x .33’. Some of this walkway (50LF) will have a Crab Orchard Brown edging of tumbled cobble stones as seen at Stone Forest, www.stoneforest.biz.
6. Paint accessible markings. About 134 LF of 4” wide solid blue lines.
7. Purchase and install accessible signage. One “Van Accessible” sign shall be 12” x 9” aluminum reflective sign and one “Reserved Parking” sign shall be 12” x 18” ARS or aluminum reflective sign. See detail.
8. Purchase and install two bear-proof trash cans. Unit specs are “Bear Saver”, Model HB2-P, Hid-A-Bag Double Trash container, 140 gallon capacity, 350 pounds each. Also install mounting on the concrete for the units as shown in details.
9. Construct and Install horse tie rack which will be 10’-6” in length. See detail.
10. Install GAB walkway/path to CXT toilet building from gravel roadway. Walkway/path is 5’ x 45’ x .5’. Install cobblestone edging both sides of the walkway from the gravel road to the concrete walkway around the CXT building. Use the same cobbles as used for edging concrete walkway.
11. Install erosion control measures. Ds1 about 80’ x 50’ x .25’. Ds3 about 25’ x 60’.
12. Remove Tree Save Fencing at end of project.
13. Remove construction exit at direction of COR.
14. All disturbed areas shall be left with a neat appropriate temporary protective cover.
15. Purchase and install planting plan vegetation. Most of these plants can be bought at:
· Sunlight Gardens, www.sunlightgardens.com
· Carolina Native Nursery, www.carolinanativenursery.com
· Meadowbrook Nursery, www.we-du.com
PLANTING PLAN VEGETATION
| Scientific Name |
| Common Name |
| Size of Plant |
| Number of Plants |
| Coreopsis Auriculata ‘nana’ |
| Dwarf Eared Coreopsis |
| 1 quart |
| 8 |
| Calycanthus floridus |
| Eastern Sweetshrub |
| 1 gallon |
| 13 |
| Hamamelis Virginiana |
| Native Witch Hazel |
| 1 gallon |
| 3 |
| Pycnanthemum icanum |
| Mountain mint |
| 1 gallon |
| 17 |
| Rhododendron calendulaceum |
| Flame Azalea |
| 1 gallon |
| 8 |
| Rhus aromatic ‘Gro-low’ |
| Gro-low Sumac |
| 1 quart |
| 15 |
| Stokesia laevis ‘Peachies Pick’ |
| Peachies Pick Stokes Aster |
| 1 gallon |
| 12 |
SITE 2: Plans labeled “Sarah’s Creek Campground Location #2 CXT Installation”
Locate the bulletin board for the area on the right side of FS Road 157 before the campground begins. Once the bulletin board is reached, proceed onward and almost immediately turn left into a small 5 campsite area that is a dead end. The area is shown below and is between FS Road 157 and the truck shown parked below. This area is before you reach a double culvert river crossing.
Existing site to be constructed
PHASE 1:
1. Install 155 LF of two rows (310 LF total) of Type C Silt Fence along gravel roadway as shown on Erosion Control Plans, Initial Phase. Work to be done before any grading, demolition, or vegetation removal begins.
2. Install 70 LF Tree Save Fence as shown on Erosion Control Plan, Initial Phase. Work to be done before any grading, demolition, or vegetation removal begins.
3. Grade area around toilet to prepare site for the installation of the new toilet.
4. Clear mid-story and understory vegetation surrounding the toilet building area as directed by COR. Approximately 0.12 acre will be cleared and grubbed.
5. Strip and stockpile topsoil in areas to be graded. Topsoil is to be stockpiled to complete final grading of areas.
6. Stabilize disturbed areas with appropriate stabilization methods per the Erosion Control Plan, Intermediate Phase. Organic material from clearing of mid-story and understory vegetation should remain stockpiled on site per the COR’s direction and be chipped and applied as mulch if possible in those areas marked Ds1. Wood waste should be applied at a depth of 2” to 3” or 6 to 9 ton/acre.
7. All disturbed areas shall be left with a neat appropriate temporary protective cover.
8. The CXT toilet will be installed by others. This Phase 1 is to prepare site for that to occur.
PHASE 2:
1. The second phase will not begin until the CXT toilet has been installed by others. Then work can begin on completion of the site improvements.
2. Maintain erosion control measures and Tree Save Fence erosion control measures. Replace if necessary.
3. Purchase and install boulders at direction of COR before concrete is placed. Approx. 30 boulders of various sizes, ranging from 8 cu Ft (2’ x 2’ x2’) to 27 cu Ft (3’ x 3’ x3’). An equal amount of/or range between these will be acceptable.
4. Construct concrete parking area. Parking area is 12’ x 42’ x 6” thick finished concrete.
5. Construct concrete walkway to and around building. Area is about 5’ x 88’ x .33’. Some of this walkway (50LF) will have a Crab Orchard Brown edging of tumbled cobble stones as seen at Stone Forest, www.stoneforest.biz.
6. Paint accessible markings. About 34 LF of 4” wide solid blue lines.
7. Purchase and install accessible signage. One “Van Accessible” sign shall be 12” x 9” aluminum reflective sign and one “Reserved Parking” sign shall be 12” x 18” ARS or aluminum reflective sign. See detail.
8. Purchase and install two bear-proof trash cans. Unit specs are “Bear Saver”, Model HB2-P, Hid-A-Bag Double Trash container, 140 gallon capacity, 350 pounds each. Also install mounting on the concrete for the units as shown in details.
9. Construct and install horse tie rack which will be 10’-6” in length. See detail.
10. Install GAB walkway/path to CXT toilet building from gravel roadway. Walkway/path is 5’ x 16’ x .5’. Install cobblestone edging both sides of the walkway from the gravel road to the concrete walkway around the CXT building. Use the same cobbles as used for edging concrete walkway.
11. Purchase and install planting plan vegetation. Most of these plants can be bought at:
· Sunlight Gardens, www.sunlightgardens.com
· Carolina Native Nursery, www.carolinanativenursery.com
· Meadowbrook Nursery, www.we-du.com
12. Install erosion control measures. Ds1 about 70’ x 30’ x .25’. Ds3 about 70’ x 30’.
13. Remove Tree Save Fencing at end of project.
14. Remove construction exit at direction of COR.
15. All disturbed areas shall be left with a neat appropriate temporary protective cover.
PLANTING PLAN VEGETATION
| Scientific Name |
| Common Name |
| Size of Plant |
| Number of Plants |
| Calycanthus floridus |
| Eastern Sweetshrub |
| 1 gallon |
| 7 |
| Helianthus angustifolius |
| ‘Low Down’ Dwarf Perennial Sunflower |
| 1 gallon |
| 20 |
| Muhlenbergia capillaris |
| Pink Muhly Grass |
| 1 gallon |
| 5 |
| Pinus stobus ‘Blue Shag’ |
| ‘Blue Shag’ dwarf white pine |
| 1 gallon |
| 3 |
| Rhus aromatic ‘Gro-low’ |
| Gro-low Sumac |
| 1 quart |
| 10 |
| Stokesia laevis ‘Peachies Pick’ |
| Peachies Pick Stokes Aster |
| 1 gallon |
| 31 |
Sarah’s Creek Campground Page 1 image4.jpeg image5.jpeg image1.jpeg image2.jpeg image3.jpeg
File details come from the government source that posted it. Updated .