Schedule of Items.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- AG-4419-S-10-0668
About this file
Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1442.pdf | ||
| Location 2 Plans.pdf | ||
| SCOPE OF WORK-SARAHS.docx | DOCX document | |
| Location 1 Plans.pdf | ||
| Wage Determinations.pdf | ||
| clauses.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOC -1
Sarah's Creek Campground Location #1
Item Description Quantity Unit Unit Cost Total Cost
| 02 - SITEWORK - General | |||||
| Mobilization/Permits | 1 | LS | |||
| Clearing and Grubbing | 0.16 | ACRES | |||
| Grading | 0.11 | ACRES | |||
| Demolish/Remove Existing Toilet | 1 | LS | |||
| Erosion Control | LS | ||||
| Initial | Silt Fence, Type C | 320 | LF | ||
| Initial | Tree Save Fence | 200 | LF | ||
| Initial | Construction Entrance/Exit | 1 | EA | ||
| Intermediate | Mulch- 3" Depth | 1200 | SY | ||
| Final | Seed | 0.03 | ACRES | ||
| Final | Plants | ||||
| Calycanthus floridus | 13 | 1 Gallon Container | |||
| Coreopsis Auriculata "nana" | 8 | 1 Gallon Container | |||
| Hamamelis Virginiana | 3 | 1 Gallon Container | |||
| Pycnanthemum icanum | 17 | 1 Gallon Container | |||
| Rhododendron calendulaceum | 8 | 1 Gallon Container | |||
| Rhus aromatica "Gro-low' | 15 | 1 Quart Container | |||
| Stokesia laevis 'Peachies Pick' | 12 | 1 Gallon Container | |||
| 6" Gravel Base (Parking Area) | 92 | SY | |||
| 4" Gravel Base (Walkways) | 36 | SY | |||
| 4" GAB Surface Course (Trail) | 34 | SY | |||
| 6" #4 Gravel Base (Trail) | 34 | SY | |||
| Stone Curb | 172 | LF | |||
| SUBTOTAL | 0.00 |
| 03 - CONCRETE | ||
| 4" Concrete Slab (Walkways) | 320 | SF |
| 6" Concrete Slab (Parking Area) | 825 | SF |
| Finishing Slab - Broom All | 1145 | SF |
| Expansion Joint | 176 | LF |
| Control Joint | 60 | LF |
| Paint Blue Accessible Markings | 134 | LF |
SUBTOTAL 0.00
| 05 - METALS | ||
| Steel Tube Hitching Post | LS | |
| SUBTOTAL |
| 12 - FURNISHINGS | ||||
| Trash Container | 2 | LS | ||
| Accessible Parking Signs | 2 | EA | ||
| Boulder | 24 | EA | ||
| SUBTOTAL | 0.00 |
SUBTOTAL 0.00
TOTAL
LOC-2
Sarah's Creek Campground Location #2
Item Description Quantity Unit Unit Cost Total Cost
| 02 - SITEWORK - General | |||||
| Mobilization/Permits | 1 | LS | |||
| Clearing and Grubbing | 0.12 | ACRES | |||
| Grading | 0.12 | ACRES | |||
| Erosion Control | LS | ||||
| Initial | Silt Fence, Type C | 310 | LF | ||
| Initial | Tree Save Fence | 70 | LF | ||
| Initial | Construction Entrance/Exit | 0 | EA | ||
| Intermediate | Mulch- 3" Depth | 544 | SY | ||
| Final | Seed | 0.03 | ACRES | ||
| Final | Plants | ||||
| Calycanthus floridus | 7 | 1 Gallon Container | |||
| Helianthus angustofolius | 20 | 1 Gallon Container | |||
| Muhlenbergia capillaris | 5 | 1 Gallon Container | |||
| Pinus strobus 'Blue Shag' | 3 | 1 Gallon Container | |||
| Rhus aromatica "Gro-low' | 10 | 1 Quart Container | |||
| Stokesia laevis 'Peachies Pick' | 31 | 1 Gallon Container | |||
| 6" Gravel Base (Parking Area) | 56 | SY | |||
| 4" Gravel Base (Walkways) | 56 | SY | |||
| 4" GAB Surface Course (Trail) | 9 | SY | |||
| 6" #4 Gravel Base (Trail) | 9 | SY | |||
| Stone Curb | 80 | LF | |||
| SUBTOTAL | 0.00 |
| 03 - CONCRETE | ||
| 4" Concrete Slab (Walkways) | 500 | SF |
| 6" Concrete Slab (Parking Area) with 6 x 6 WWM | 504 | SF |
| Finishing Slab - Broom All | 1004 | SF |
| Expansion Joint | 115 | LF |
| Control Joint | 75 | LF |
| Paint Blue Accessible Markings | 34 | LF |
SUBTOTAL 0.00
| 05 - METALS | ||||
| Steel Tube Hitching Post | 1 | LS | ||
| SUBTOTAL | 0.00 |
| 12 - FURNISHINGS | ||||
| Trash Container | 2 | LS | ||
| Accessible Parking Signs | 2 | EA | ||
| Boulder | 30 | EA | ||
| SUBTOTAL | 0.00 |
TOTAL
Sheet3
File details come from the government source that posted it. Updated .