Sheet1 The Pocket Campground Day Use Picnic Shelter Area

ItemDescriptionQuantityUnitUnit CostTotal Cost
Mobilization - permits1LS
Clearing and Grubbing0.5ACRES
Grading0.05ACRES
Demolish/Remove Existing Toilet1LS
Thinning Mid-story and under-story0.36ACRES
Erosion Control
InitialSilt Fence, Type C-Total460LF
InitialTree Save Fence120LF
Initial20' x 155' #4-Construction Exit344SY
IntermediateSeed around toilet0.05ACRES
4" Gravel Base (Walkways)43SY
SUBTOTAL0.00
03 - CONCRETE
4" Concrete Slab (Walkways)390SF
Finishing Slab - Broom All390SF

SUBTOTAL 0.00

TOTAL