Schedule of Items.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- AG-4419-S-10-0667
About this file
Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1442.pdf | ||
| Construction Plans.pdf | ||
| SCOPE OF WORK-Pocket.docx | DOCX document | |
| CXT Installation-Specs.pdf | ||
| clauses.docx | DOCX document | |
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 The Pocket Campground Day Use Picnic Shelter Area
| Item | Description | Quantity | Unit | Unit Cost | Total Cost |
| Mobilization - permits | 1 | LS | |||
| Clearing and Grubbing | 0.5 | ACRES | |||
| Grading | 0.05 | ACRES | |||
| Demolish/Remove Existing Toilet | 1 | LS | |||
| Thinning Mid-story and under-story | 0.36 | ACRES |
| Erosion Control | |||
| Initial | Silt Fence, Type C-Total | 460 | LF |
| Initial | Tree Save Fence | 120 | LF |
| Initial | 20' x 155' #4-Construction Exit | 344 | SY |
| Intermediate | Seed around toilet | 0.05 | ACRES |
| 4" Gravel Base (Walkways) | 43 | SY | ||
| SUBTOTAL | 0.00 |
| 03 - CONCRETE | ||
| 4" Concrete Slab (Walkways) | 390 | SF |
| Finishing Slab - Broom All | 390 | SF |