CXT Installation-Specs.pdf
PDF 336 KB Posted
- Solicitation number
- AG-4419-S-10-0667
About this file
Instalation Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1442.pdf | ||
| Construction Plans.pdf | ||
| SCOPE OF WORK-Pocket.docx | DOCX document | |
| Schedule of Items.xlsx | XLSX spreadsheet | |
| clauses.docx | DOCX document | |
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK
STATEMENT
C.1 GENERAL REQUIREMENTS
A. DESCRIPTION OF WORK
This project involves pre-construction, demolition, and reconstruction at a toilet site located at the Pocket Day Use Group Picnic Shelter Area.
B. LOCATION
The Pocket Recreation Area Group Picnic Shelter is located on the Conasauga District of the Chattahoochee-Oconee National Forest, in the northeast corner of Floyd County. To get to the Pocket, take Georgia 136 east from LaFayette, Georgia, for 13.5 miles; 0.5 mile east of Villanow, turn right (south) on Georgia 156 and proceed about 7 miles to the Pocket Recreation Area. Take the second entrance, Forest Service Road 106, and go to the end of the road which is the parking lot for the Group Picnic Area. Go up to the Group Picnic Shelter and there you will find a concrete sidewalk which leads to an existing toilet building. This is the building which will be removed and replaced.
C. ENVIRONMENTAL CONDITIONS
The Contractor shall be responsible to submit for approval and maintain compliance with a pollution control plan that addresses human waste issues and equipment maintenance pollution.
This includes management of hazardous materials including hydrocarbons and petroleum based products.
Vegetation is an important feature on the project site. The contractor shall take care not to damage vegetation which is not to be removed.
D. PRICE RANGE: LESS THAN $100,000
E. CONTRACT TIME: 90 CALENDAR DAYS
Expected date of start of construction: June 2010
F. INSPECTION AND ACCEPTANCE
Periodic field inspection will be made by the Contracting Officer’s Representative (COR) or the COR’s designated inspector. Work not completed to Contract Specifications shall be reworked without compensation to the contractor.
CXT Installation 00001 - 1 THE POCKET RECREATION AREA
GROUP PICNIC SHELTER
SECTION 00001
PROJECT TITLE PAGE
THE POCKET RECREATION AREA GROUP PICNIC SHELTER
TOILET REPLACEMENT
CONASAUGA RIVER RANGER DISTRICT
CHATTACHOOCHEE-OCONEE NATIONAL FOREST
MARCH 1, 2010
PREPARED BY: SUPERVISOR'S OFFICE
CHATTAHOOCHEE-OCONEE NATIONAL FOREST
1755 CLEVELAND HIGHWAY
GAINESVILLE, GA 30501
CXT Installation 00011 - 1 THE POCKET RECREATION AREA
SECTION 00011
TABLE OF CONTENTS
SPECIFICATIONS
1.01 Division 01 -- General Requirements
A. 01 100 - Summary
B. 01 300- Administrative Requirements
C. 01 575 - Temporary Erosion and Sediment Control
D. 01 700 – Execution and Closeout Requirements
E. 01 732 - Construction Waste Management and Disposal
1.02 Division 02 -- Existing Conditions
A. 02 102 - Clearing and Grubbing
B. 02 225 – Removal and Disposal of Existing Toilet Structure
C. 02115 - Removal and Disposal of underground Storage Tanks
1.03 Division 03 -- Earthwork
A. 03 231 - Grading
1.04 Division 04 -- Concrete
A. 04 751 – Cement Concrete Pavement
B. 04 800 - Aggregate Base Course
1.05 Division 05 -- Exterior Improvements
A. 05 921 – Seeding
END OF TABLE OF CONTENTS
CXT Installation 00015 - 1 THE POCKET RECREATION AREA
SECTION 00015
INDEX TO CONSTRUCTION PLAN SHEETS
1 Title Sheet 2-6 Erosion Control Plan 7 Phase 1 – Demolition Plan 8 Phase 2 – Site Plan 9-11 CXT Details (Reference Only)
CXT Installation 01100 - 1 THE POCKET RECREATION AREA
SECTION 01100
SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. Project Name: The Pocket Recreation Area Group Picnic Shelter CXT Installation.
B. Chattahoochee-Oconee National Forests's Name: Chattahoochee-Oconee National Forest.
C. This project involves pre-construction, demolition, and reconstruction at a toilet site located at the Pocket Day Use Group Picnic Shelter Area.
Bidders are urged to make a site visit prior to bidding.
The Contractor shall provide all materials, tools, transportation, labor, proper personnel and environmental protection to successfully complete the project. Proper signage shall be placed, and precautionary measures shall be taken by the Contractor to insure the safety of employees and visitors to the Recreation Area.
The work consists of:
Phase 1:
• Installation and maintenance of erosion control measures for demolition and construction at the site throughout the life of the project/contract.
• Removal, thinning, and disposition of vegetation at direction of COR
• Grading at the direction of COR
• Demolition of an existing toilet, toilet vaults, and concrete pad
Phase 2:
• Reconstruction of the area immediately surrounding a new CXT toilet that has been emplaced by others.
• Reconstruction shall include sidewalk construction and finalization of erosion control measures.
• Finalization of erosion control measures.
Extreme care shall be taken by the Contractor to prevent damage to existing paving. Any damage caused by the Contractor shall be repaired at the Contractor’s expense as directed by the Contracting Officer’s Representative (C.O.R.).
The Contractor shall insure that the job site is left in a clean, neat, and safe condition on a daily basis throughout the life of the project.
SITE SPECIFICS:
The Pocket Recreation Area Group Picnic Shelter is located on the Conasauga District of the Chattahoochee-Oconee National Forest, in the northeast corner of Floyd County. To get to the Pocket, take Georgia 136 east from LaFayette, Georgia, for 13.5 miles; 0.5 mile east of Villanow, turn right (south) on Georgia 156 and proceed about 7 miles to the Pocket Recreation Area. Take the second entrance, Forest Service Road 106, and go to the end of the road which is the parking lot for the Group Picnic Area. Go up to the Group Picnic Shelter and there you will find a concrete sidewalk which leads to an existing toilet building. This is the building which will be removed and replaced.
CXT Installation 01100 - 2 THE POCKET RECREATION AREA
Existing toilet to be removed, sidewalk to be removed, and entry road into area to be widened
PHASE 1:
• Install 460 LF of two rows (920 LF total) of Type C Silt Fence along paved roadway as shown on plans.
Work to be done before any demolition, grading or vegetation removal begins.
• Install Construction Exit that will be 20 feet wide and 100 feet in length, use #4 course aggregate, per detail on plans. Work to be done before any demolition, grading or vegetation removal begins.
• Install 120 LF Tree Save Fence along and 10 feet distant from the Construction Exit on the uphill side of the access roadway. Work to be done before any demolition, grading or vegetation removal begins.
• Widen the gravel access road by approximately 8 additional feet of width on the uphill side of the roadway to existing toilet. The roadway is 120 feet in length. Limb up any remaining trees that overhang this area to a height of 20 feet.
• Clear mid-story and understory vegetation surrounding the toilet building area as directed by COR.
Approximately 0.5 acre will be thinned.
• Strip and stockpile topsoil around the existing toilet building. Topsoil is to be stockpiled to complete final grading of areas.
• Demolish existing toilet building. The building is approximately 8’ x 14’; the interior is polyethylene walls and floor and the exterior is cedar lap & batt with cedar shakes. Remove from FS land.
• Demolish concrete slab surrounding toilet, approximately 20’ x 24’, and 10 additional feet of 5’ wide concrete sidewalk and remove from FS land.
• Pump contents of two existing septic vaults/tanks and clean inside with 10% bleach/water solution.
• Remove and dispose of the two 750 gallon polyethylene vaults/tanks, each 325 pounds. Remove from FS land.
• Backfill hole with soil. Fill material shall be free of brush, rubbish, rocks, logs and stumps. Compact each
12 inch lift of fill and top with 6 inches of topsoil.
• Grade area around toilet to prepare site for the installation of the new toilet.
• Stabilize disturbed areas with mulching only. Organic material from clearing of mid-story and understory vegetation should remain on site and be chipped and applied as mulch if possible. Wood waste should be applied at a depth of 2” to 3” or 6 to 9 ton/acre.
• All disturbed areas shall be left with a neat appropriate temporary protective cover.
PHASE 2:
1. The second phase will not begin until the CXT toilet has been installed by others. Then work can begin on completion of the site improvements.
2. Maintain erosion control measures and Tree Save Fence erosion control measures. Replace if necessary.
3. Construct concrete walkway areas. The toilet building will have 5’wide x 72’ x 4” deep concrete walkway that abuts it on all four sides and an additional 5’wide x 10’ x 4” concrete walkway that adjoins the existing sidewalk. The side walk should have a cross-slope of 2% maximum and a running slope of 5% maximum to make it Accessible.
CXT Installation 01100 - 3 THE POCKET RECREATION AREA
4. Install final erosion control measures. Disturbed area stabilization of Ds3 around new toilet is about 0.05 acres.
5. Remove Tree Save Fencing at end of project and remove silt fence at direction of COR.
6. All disturbed areas shall be left with a neat appropriate temporary protective cover.
Example of CXT to be installed
1.02 DESCRIPTION OF ALTERATIONS WORK
A. Scope of demolition and removal work is shown on drawings and specified in Section 02225.
1.03 CONTRACTOR USE OF SITE AND PREMISES
A. Construction Operations: Limited to areas noted on Drawings.
B. Arrange use of site and premises to allow:
1. Work by Chattahoochee-Oconee National Forests.
2. Use of site and premises by the public.
C. Provide access to and from site as required by law and by Chattahoochee-Oconee National Forests:
1. Do not obstruct roadways, sidewalks, or other public ways without permit.
1.04 WORK SEQUENCE
A. Coordinate construction schedule and operations with Chattahoochee-Oconee National Forests.
END OF SECTION
CXT Installation 01100 - 1 THE POCKET RECREATION AREA
SECTION 01300
ADMINISTRATIVE REQUIREMENTS
1.01 SECTION INCLUDES
A. Preconstruction meeting.
B. Construction progress schedule.
C. Submittals for review and information.
D. Number of copies of submittals.
E. Submittal procedures.
1.02 RELATED SECTIONS – NOT USED.
1.03 PROJECT COORDINATION
A. Project Coordinator: Contracting Officer's Representative (COR).
B. Cooperate with the Project COR in allocation of mobilization areas of site; for field of-fices and sheds, for access, traffic, and parking facilities.
C. During construction, coordinate use of site and facilities through the Project Coordina-tor.
D. Comply with Project COR's procedures for intra-project communications; submittals, reports and records, schedules, coordination drawings, and recommendations; and reso-lution of ambiguities and conflicts.
E. Comply with instructions of the Project COR for use of temporary utilities and con-struction facilities.
F. Coordinate field engineering and layout work under instructions of the Project COR.
G. Make the following types of submittals to COR:
1. Requests for interpretation.
2. Requests for substitution.
3. Shop drawings, product data, and samples.
4. Test and inspection reports.
5. Design data.
6. Manufacturer's instructions and field reports.
7. Applications for payment and change order requests.
8. Progress schedules.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PRECONSTRUCTION MEETING
A. Government will schedule a meeting after Notice of Award.
B. Attendance Required:
CXT Installation 01100 - 2 THE POCKET RECREATION AREA
1. Contracting Officer.
2. COR
3. Contractor.
C. Agenda:
1. Execution of Government-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of Subcontractors, list of Products, schedule of values, and progress schedule.
5. Designation of personnel representing the parties to Contract, Contractor and Gov-ernment.
6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
7. Scheduling.
3.03 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Samples for selection.
B. Submit to COR for review for the limited purpose of checking for conformance with in-formation given and the design concept expressed in the contract documents.
3.04 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
6. Manufacturer's field reports.
7. Other types indicated.
B. Submit for Engineer's knowledge as contract administrator or for Forest Service. No action will be taken.
C. Provide submittals for the following materials:
1. All types of silt fence to be used
2. Seed mix
3. Fertilizer
4. Lime
5. Expansion Joint
3.06 NUMBER OF COPIES OF SUBMITTALS
A. Documents for Review:
CXT Installation 01100 - 3 THE POCKET RECREATION AREA
1. Small Size Sheets, Not Larger Than 8-1/2 x 11 inches: Submit the number of cop-ies which the Contractor requires, plus two copies which will be retained by the
COR.
2. Larger Sheets, Not Larger Than 36 x 48 inches: Submit the number of opaque re-productions which Contractor requires, plus two copies which will be retained by
COR.
B. Documents for Information: Submit two copies.
C. Documents for Project Closeout: Make one reproduction of submittal originally re-viewed. Submit one extra of submittals for information.
D. Samples: Submit the number specified in individual specification sections; one of which will be retained by COR.
1. After review, produce duplicates.
2. Retained samples will not be returned to Contractor unless specifically so stated.
3.07 SUBMITTAL PROCEDURES
A. Transmit each submittal with AIA Form G810.
B. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix.
C. Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number, and specification section number, as appropriate on each copy.
D. Apply Contractor's stamp, signed or initialed certifying that review, approval, verifica-tion of Products required, field dimensions, adjacent construction Work, and coordina-tion of information is in accordance with the requirements of the Work and Contract Documents.
E. Deliver submittals to Contracting Officer at business address.
F. Schedule submittals to expedite the Project, and coordinate submission of related items.
G. For each submittal for review, allow 15 days excluding delivery time to and from the Contractor.
H. Identify variations from Contract Documents and Product or system limitations which may be detrimental to successful performance of the completed Work.
I. Provide space for Contractor and COR review stamps.
J. When revised for resubmission, identify all changes made since previous submission.
K. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements.
END OF SECTION 01300
CXT Installation 01575 - 1 THE POCKET RECREATION AREA
SECTION 01575
TEMPORARY EROSION AND SEDIMENTATION CONTROL
1.01 SECTION INCLUDES
A. Prevention of erosion due to construction activities.
B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.
C. Restoration of areas eroded due to insufficient preventive measures.
D. Compensation of Chattahoochee-Oconee National Forests for fines levied by authorities having jurisdiction due to non-compliance by Contractor.
1.02 PERFORMANCE REQUIREMENTS
A. Comply with all requirements of U.S. Environmental Protection Agency for erosion and sedimentation control.
B. Best Management Practices Standard: EPA 832-R-92-005.
C. Best Management Practices Standard: State of Georgia Erosion and Sedimentation Control Manual.
D. Develop and follow an Erosion and Sedimentation Prevention Plan and submit periodic inspection reports.
E. Timing: Put preventive measures in place as soon as possible after disturbance of surface cover and before precipitation occurs.
F. Erosion On Site: Minimize wind, water, and vehicular erosion of soil on project site due to construction activities for this project.
1. Control movement of sediment and soil from temporary stockpiles of soil.
2. Prevent development of ruts due to equipment and vehicular traffic.
3. If erosion occurs due to non-compliance with these requirements, restore eroded areas at no cost to
Chattahoochee-Oconee National Forests.
G. Erosion Off Site: Prevent erosion of soil and deposition of sediment on other properties caused by water leaving the project site due to construction activities for this project.
1. Prevent windblown soil from leaving the project site.
2. Prevent mud and sediment from flowing onto sidewalks and pavements.
3. If erosion occurs due to non-compliance with these requirements, restore eroded areas at no cost to
Chattahoochee-Oconee National Forests.
H. Sedimentation of Waterways On Site: Prevent sedimentation of waterways on the project site, including rivers, streams, lakes, ponds, open drainage ways, storm sewers, and sanitary sewers.
1. If sedimentation occurs, install or correct preventive measures immediately at no cost to
Chattahoochee-Oconee National Forests; remove deposited sediments; comply with requirements of authorities having jurisdiction.
I. Sedimentation of Waterways Off Site: Prevent sedimentation of waterways off the project site, including rivers, streams, lakes, ponds, open drainage ways, storm sewers, and sanitary sewers.
1. If sedimentation occurs, install or correct preventive measures immediately at no cost to
Chattahoochee-Oconee National Forests; remove deposited sediments; comply with requirements of authorities having jurisdiction.
J. Maintenance: Maintain temporary preventive measures until permanent measures have been established.
1.03 SUBMITTALS
A. Erosion and Sedimentation Control Plan:
CXT Installation 01575 - 2 THE POCKET RECREATION AREA
1. Include:
a. Schedule of temporary preventive measures, in relation to ground disturbing activities.
b. Other information required by law.
c. Format required by law is acceptable, provided any additional information specified is also included.
2. Obtain the approval of the Plan by Chattahoochee-Oconee National Forests.
B. Certificate: Mill certificate for silt fence fabric attesting that fabric and factory seams comply with specified requirements, signed by legally authorized official of manufacturer; indicate actual minimum average roll values; identify fabric by roll identification numbers.
C. Inspection Reports: Submit report of each inspection; identify each preventive measure, indicate condition, and specify maintenance or repair required and accomplished.
PART 2 PRODUCTS
2.01 MATERIALS
A. Mulch: Use one of the following:
1. Wood mulch/wood waste
B. Grass Seed For Temporary Cover: Select a species appropriate to climate, planting season, and intended purpose. If same area will later be planted with permanent vegetation, do not use species known to be excessively competitive or prone to volunteer in subsequent seasons. See section 05921.
C. Silt Fence Fabric: Polypropylene geotextile resistant to common soil chemicals, mildew, and insects;
non-biodegradable; in longest lengths possible; fabric including seams with the following minimum average roll lengths:
1. Average Opening Size: 30 U.S. Std. Sieve (0.600 mm), maximum, when tested in accordance with
ASTM D 4751.
2. Permittivity: 0.05 sec^-1, minimum, when tested in accordance with ASTM D 4491.
3. Ultraviolet Resistance: Retaining at least 70 percent of tensile strength, when tested in accordance with ASTM D 4355 after 500 hours exposure.
4. Tensile Strength: 100 lb-f (450 N), minimum, in cross-machine direction; 124 lb-f (550 N), minimum, in machine direction; when tested in accordance with ASTM D 4632.
5. Elongation: 15 to 30 percent, when tested in accordance with ASTM D 4632.
6. Tear Strength: 55 lb-f (245 N), minimum, when tested in accordance with ASTM D 4533.
7. Color: Manufacturer's standard, with embedment and fastener lines preprinted.
D. Silt Fence Posts: One of the following, minimum 5 feet (1500 mm) long:
1. Steel U- or T-section, with minimum mass of 1.33 lb per linear foot (1.98 kg per linear m).
PART 3 EXECUTION
3.01 EXAMINATION
A. Examine site and identify existing features that contribute to erosion resistance; maintain such existing features to greatest extent possible.
3.02 PREPARATION
A. Schedule work so that soil surfaces are left exposed for the minimum amount of time.
3.03 SCOPE OF PREVENTIVE MEASURES
A. Linear Sediment Barriers: Made of silt fences.
1. Provide linear sediment barriers:
a. Along downhill perimeter edge of disturbed areas, including soil stockpiles.
b. Along the toe of cut slopes and fill slopes.
B. Soil Stockpiles: Protect using one of the following measures:
1. Cover with mulch at least 4 inches (100 mm) thickness of pine needles, sawdust, bark, wood chips, CXT Installation 01575 - 3 THE POCKET RECREATION AREA or shredded leaves.
C. Mulching: Use only for areas that may be subjected to erosion for less than 6 months.
3.04 INSTALLATION
A. Silt Fences:
1. Store and handle fabric in accordance with ASTM D 4873.
2. Where slope gradient is less than 3:1 or barriers will be in place less than 6 months, use nominal 16 inch (405 mm) high barriers with minimum 36 inch (905 mm) long posts spaced at 6 feet (1830
mm) maximum, with fabric embedded at least 4 inches (100 mm) in ground.
3. Where slope gradient is steeper than 3:1 or barriers will be in place over 6 months, use nominal 28 inch (710 mm) high barriers, minimum 48 inch (1220 mm) long posts spaced at 6 feet (1830 mm) maximum, with fabric embedded at least 6 inches (150 mm) in ground.
4. Where slope gradient is steeper than 3:1 and vertical height of slope between barriers is more than 20 feet (6 m), use nominal 32 inch (810 mm) high barriers with woven wire reinforcement and steel posts spaced at 4 feet (1220 mm) maximum, with fabric embedded at least 6 inches (150 mm) in ground.
5. Install with top of fabric at nominal height and embedment as specified.
6. Do not splice fabric width; minimize splices in fabric length; splice at post only, overlapping at least
18 inches (460 mm), with extra post.
7. Fasten fabric to steel posts using wire, nylon cord, or integral pockets.
8. Wherever runoff will flow around end of barrier or over the top, provide temporary splash pad or other outlet protection; at such outlets in the run of the barrier, make barrier not more than 12 inches (300 mm) high with post spacing not more than 4 feet (1220 mm).
B. Mulching Over Large Areas:
1. Wood chips
C. Mulching Over Small and Medium Areas:
1. Wood chips
3.05 MAINTENANCE
A. Inspect preventive measures weekly, within 24 hours after the end of any storm that produces 0.5 inches (13 mm) or more rainfall at the project site, and daily during prolonged rainfall.
B. Repair deficiencies immediately.
C. Silt Fences:
1. Promptly replace fabric that deteriorates unless need for fence has passed.
2. Remove silt deposits that exceed one-third of the height of the fence.
3. Repair fences that are undercut by runoff or otherwise damaged, whether by runoff or other causes.
D. Place sediment in appropriate locations on site; do not remove from site.
3.06 CLEAN UP
A. Remove temporary measures after permanent measures have been installed, unless permitted to remain by Chattahoochee-Oconee National Forest.
B. Clean out temporary sediment control structures that are to remain as permanent measures.
C. Where removal of temporary measures would leave exposed soil, shape surface to an acceptable grade and finish to match adjacent ground surfaces.
CXT Installation 01700 - 1 THE POCKET RECREATION AREA
SECTION 01700
EXECUTION REQUIREMENTS
1.01 SECTION INCLUDES
A. Examination, preparation, and general installation procedures.
B. Surveying for laying out the work.
1.02 RELATED SECTIONS
A. Section 01100 - Summary: Limitations on working in existing building; continued occupancy; work sequence; identification of salvaged and relocated materials.
B. Section 01732 - Waste Management: Additional procedures for trash/waste removal, recycling, salvage, and reuse.
1.03 QUALIFICATIONS
1.04 PROJECT CONDITIONS
A. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.
B. Protect site from puddling or running water. Provide water barriers as required to protect site from soil erosion.
C. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.
D. Erosion and Sediment Control: Plan and execute work by methods to control surface drainage from cuts and fills, from borrow and waste disposal areas. Prevent erosion and sedimentation.
1. Minimize amount of bare soil exposed at one time.
2. Construct fill and waste areas by selective placement to avoid erosive surface silts or clays.
3. Periodically inspect earthwork to detect evidence of erosion and sedimentation; promptly apply corrective measures.
E. Pollution Control: Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations.
PART 2 PRODUCTS
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work. Start of work means acceptance of existing conditions.
B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or mis-fabrication.
E. Verify that utility services are available, of the correct characteristics, and in the correct locations.
F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions
CXT Installation 01700 - 2 THE POCKET RECREATION AREA affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.
3.02 LAYING OUT THE WORK
A. Verify locations of survey control points prior to starting work.
B. Promptly notify Contracting Officer of any discrepancies discovered.
C. Utilize recognized engineering survey practices.
3.03 GENERAL INSTALLATION REQUIREMENTS
A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.
B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.
C. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.
D. Make neat transitions between different surfaces, maintaining texture and appearance.
3.04 PROGRESS CLEANING
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.
B. Collect and remove waste materials, debris, and trash/rubbish from site periodically and dispose off-site;
do not burn or bury.
3.05 PROTECTION OF INSTALLED WORK
A. Protect installed work from damage by construction operations.
3.06 FINAL CLEANING
A. Use cleaning materials that are nonhazardous.
B. Clean site; sweep paved areas, rake clean landscaped surfaces.
C. Remove waste, surplus materials, trash/rubbish, and construction facilities from the site; dispose of in legal manner; do not burn or bury.
CXT Installation 01732 - 1 THE POCKET RECREATION AREA
SECTION 01732
WASTE MANAGEMENT
1.01 WASTE MANAGEMENT REQUIREMENTS
A. Chattahoochee-Oconee National Forests requires that this project generate the least amount of trash and waste possible.
B. Employ processes that ensure the generation of as little waste as possible due to error, poor planning, breakage, mishandling, contamination, or other factors.
C. Minimize trash/waste disposal in landfills; reuse, salvage, or recycle as much waste as economically feasible.
D. Contractor shall submit periodic Waste Disposal Reports; all landfill disposal, incineration, recycling, salvage, and reuse must be reported regardless of to whom the cost or savings accrues.
E. Methods of trash/waste disposal that are not acceptable are:
1. Burning on the project site.
2. Burying on the project site.
3. Dumping or burying on other property, public or private.
4. Other illegal dumping or burying.
F. Regulatory Requirements: Contractor is responsible for knowing and complying with regulatory requirements, including but not limited to Federal, State and local requirements, pertaining to legal disposal of all construction and demolition waste materials.
1.02 DEFINITIONS
A. Clean: Untreated and unpainted; not contaminated with oils, solvents, caulk, or the like.
B. Construction and Demolition Waste: Solid wastes typically including building materials, packaging, trash, debris, and rubble resulting from construction, remodeling, repair and demolition operations.
C. Hazardous: Exhibiting the characteristics of hazardous substances, i.e., ignitibility, corrosivity, toxicity or reactivity.
D. Nonhazardous: Exhibiting none of the characteristics of hazardous substances, i.e., ignitibility, corrosivity, toxicity, or reactivity.
E. Nontoxic: Neither immediately poisonous to humans nor poisonous after a long period of exposure.
F. Recyclable: The ability of a product or material to be recovered at the end of its life cycle and remanufactured into a new product for reuse by others.
G. Recycle: To remove a waste material from the project site to another site for remanufacture into a new product for reuse by others.
H. Recycling: The process of sorting, cleansing, treating and reconstituting solid waste and other discarded materials for the purpose of using the altered form. Recycling does not include burning, incinerating, or thermally destroying waste.
I. Return: To give back reusable items or unused products to vendors for credit.
J. Reuse: To reuse a construction waste material in some manner on the project site.
K. Salvage: To remove a waste material from the project site to another site for resale or reuse by others.
L. Sediment: Soil and other debris that has been eroded and transported by storm or well production run-off water.
CXT Installation 01732 - 2 THE POCKET RECREATION AREA
M. Source Separation: The act of keeping different types of waste materials separate beginning from the first time they become waste.
N. Toxic: Poisonous to humans either immediately or after a long period of exposure.
O. Trash: Any product or material unable to be reused, returned, recycled, or salvaged.
P. Waste: Extra material or material that has reached the end of its useful life in its intended use. Waste includes salvageable, returnable, recyclable, and reusable material.
PART 3 EXECUTION
2.01 WASTE MANAGEMENT PLAN IMPLEMENTATION
A. Meetings: Discuss trash/waste management goals and issues at project meetings.
1. Pre-bid meeting.
2. Pre-construction meeting.
3. Regular job-site meetings.
B. Hazardous Wastes: Separate, store, and dispose of hazardous wastes according to applicable regulations.
C. Recycling: Separate, store, protect, and handle at the site identified recyclable waste products in order to prevent contamination of materials and to maximize recyclability of identified materials. Arrange for timely pickups from the site or deliveries to recycling facility in order to prevent contamination of recyclable materials.
CXT Installation 02102 - 1 THE POCKET RECREATION AREA
SECTION 02102
CLEARING & GRUBBING
PART 1 - GENERAL
1.1 SUMMARY
A. This work shall consist of clearing, grubbing, trimming, removing, and disposing of or treatment of timber, construction slash, and debris. This work shall also include preservation of vegetation and objects DESIGNATED to remain from injury or defacement.
PART 3 – EXECUTION
3.1 CLEARING & GRUBBING
A. All debris, trees, stumps, roots, and other protruding vegetative material within the clearing limits, not DESIGNATED to remain, shall be cleared, grubbed, removed, and disposed of.
B. All roots over 3 inches in diameter within the construction area shall be removed.
C. Trees shall be felled into the area being cleared when ground conditions, tree lean, and shape of clearing permit. Controlled felling shall be used that will ensure the direction of fall when necessary to prevent damage to property, structures, trees DESIGNATED to remain, or traffic.
3.2 UTILIZATION OF TIMBER
A. Logging methods and utilization shall conform to the following:
1. Felling and Bucking: Felling shall be done to minimize damage to merchantable timber and damage to remaining trees outside of clearing limits. Felling shall be done with saws or shears.
2. Disposal as Unmerchantable Timber. Timber on this project is not considered merchantable and shall be disposed of in accordance with Subsection 3.3.
3.3 SLASH TREATMENT
A. Treatment of construction slash larger than 3 inches in diameter and 3 feet in length shall be accomplished by the methods listed below. No construction slash shall be deposited in lakes, meadows, streams, or streambeds. Construction slash that interferes with drainage structures shall be removed immediately. Trees adjacent to the clearing limits scorched or damaged beyond recovery shall be felled and disposed of and treated as construction slash.
1. Scattering:
CXT Installation 02102 - 2 THE POCKET RECREATION AREA
a. The contractor can meet the following requirements. Construction slash shall be scattered outside the clearing limits without damaging trees.
2. Chipping:
a. Construction slash up to at least 4 inches in diameter and longer than 3 feet can be processed through a chipping machine.
3. Decking Unmerchantable Material:
a. Logs shall be decked in areas SHOWN ON THE DRAWINGS. Other locations may be approved by the COR. Material shall be cut into lengths not to exceed 3 feet and all limbs removed. Decks shall be stable and free of brush and soil.
4. Removal:
a. Construction slash can be removed or hauled off government property.
END OF SECTION 02102
CXT Installation 02115 - 1 THE POCKET RECREATION AREA
SECTION 02115
REMOVAL AND DISPOSAL OF EXISTING VAULT TOILET STRUCTURE
A. Selective demolition of built site elements
1.02 RELATED SECTIONS
A. Section 01100 - Summary: Limitations on Contractor's use of site and premises.
B. Section 01100 - Summary: Sequencing and staging requirements.
C. Section 01500 - Temporary Facilities and Controls: Site fences, security, protective barriers, and waste removal.
D. Section 01575 - Temporary Erosion and Sedimentation Control.
E. Section 01700 - Execution Requirements: Project conditions; protection of bench marks, survey control points, and existing construction to remain; reinstallation of removed products.
F. Section 01732 - Waste Management: Limitations on disposal of removed materials; requirements for recycling.
G. Section 02115 - Removal and Disposal of Underground Storage Tanks.
H. Section 02230 - Site Clearing: Vegetation and existing debris removal.
I. Section 02310 - Grading: Topsoil removal.
1.03 REFERENCES
A. NFPA 241 - Standard for Safeguarding Construction, Alteration, and Demolition Operations; 2004.
PART 3 EXECUTION
2.01 SCOPE
A. Remove the entire building designated existing toilet.
B. Remove paving and curbs as required to accomplish new work.
C. Clean and sanitize chemical toilet tanks with approved sanitizing solution remove off of FS land.
D. Fill excavations, open pits, and holes in ground areas generated as result of removals, using specified fill;
compact fill as required so that required rough grade elevations do not subside within one year after completion.
2.02 GENERAL PROCEDURES AND PROJECT CONDITIONS
A. Comply with applicable codes and regulations for demolition operations and safety of adjacent structures and the public.
1. Obtain required permits.
2. Take precautions to prevent catastrophic or uncontrolled collapse of structures to be removed; do not allow worker or public access within range of potential collapse of unstable structures.
3. Provide, erect, and maintain temporary barriers and security devices.
4. Use physical barriers to prevent access to areas that could be hazardous to workers or the public.
5. Conduct operations to minimize effects on and interference with adjacent structures and occupants.
6. Do not close or obstruct roadways or sidewalks without permit.
7. Conduct operations to minimize obstruction of public and private entrances and exits; do not
CXT Installation 02115 - 2 THE POCKET RECREATION AREA obstruct required exits at any time; protect persons using entrances and exits from removal operations.
B. Do not begin removal until receipt of notification to proceed from Chattahoochee-Oconee National Forests.
C. Protect existing structures and other elements that are not to be removed.
D. If hazardous materials are discovered during removal operations, stop work and notify Architect and Chattahoochee-Oconee National Forests; hazardous materials include regulated asbestos containing materials, lead, PCB's, and mercury.
E. Partial Removal of Paving and Curbs: Neatly saw cut at right angle to surface.
F. Underground Storage Tanks: Remove and dispose of as specified in Section 02115.
2.03 DEBRIS AND WASTE REMOVAL
A. Remove debris, junk, and trash from site.
B. Remove from site all materials not to be reused on site; comply with requirements of Section 01732 - Waste Management.
C. Leave site in clean condition, ready for subsequent work.
D. Clean up spillage and wind-blown debris from public and private lands.
CXT Installation 02225 - 1 THE POCKET RECREATION AREA
SECTION 02225
REMOVAL AND DISPOSAL OF UNDERGROUND STORAGE TANKS
1.01 SECTION INCLUDES
A. Removal and disposal of underground storage tanks and connected.
B. Cleaning and vapor freeing of tanks.
C. Fuel removal.
D. Providing reports required by regulatory agencies.
1.02 RELATED SECTIONS
A. Section 01700 - Execution Requirements: Dewatering of excavations and water control.
B. Section 02316 - Fill and Backfill: Fill materials, filling, and compacting.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PREPARATION FOR TANK REMOVAL AND DISPOSAL
A. Site Safety And Health Plan (SSHP): Furnish safety, health, and accident prevention provisions and develop a Site Safety and Health Plan (SSHP).
B. Spill And Discharge Control Plan: Develop, implement, and maintain a comprehensive spill and discharge control plan.
1. The plan shall provide contingency measures for potential spills and discharges from handling and transportation of contaminated soils and water.
C. Personnel Protection: Furnish appropriate personal safety equipment and protective clothing to personnel.
1. Ensure that safety equipment and protective clothing is kept clean and well maintained.
D. Decontamination: Decontaminate or properly dispose of personal protective equipment and clothing worn in contaminated areas at the end of the work day.
E. First Aid And Emergency Response Equipment And Procedures: Provide appropriate emergency first aid equipment for treatment of exposure to site physical and chemical hazards.
1. Provide and post a list of emergency phone numbers and points of contact for fire, hospital, police, ambulance, and other necessary contacts.
2. Provide and post a route map detailing the directions to the nearest medical facility.
F. Waste Disposal: The SSHP shall detail the practices and procedures to be utilized to dispose of wastes.
Upon completion of the project, certify that equipment and materials were properly decontaminated prior to being removed from the site.
G. Unforeseen Hazards: Notify the Architect of any unforeseen hazard or condition which becomes evident during work.
3.02 TANK CLEANING
A. Waste Removal:
1. All possible waste will be pumped or otherwise removed from the tank by Contractor.
3.03 DISPOSAL OF UNDERGROUND TANKS, ANCHORS, SLABS, AND ASSOCIATED PIPING
3.04 BACKFILLING
A. Provide backfill, compaction, grading, and seeding in accordance with Section 02316 - Fill and Backfill..
CXT Installation 02225 - 2 THE POCKET RECREATION AREA
CXT Installation 03231 - 1 THE POCKET RECREATION AREA
SECTION 03231
GRADING
1.01 SECTION INCLUDES
A. Removal of topsoil.
B. Rough grading and preparing the site for site structures, building pads, and a parking space.
C. Finish grading.
1.02 RELATED SECTIONS
A. Section 02921 - Seeding: Finish ground cover.
1.03 PROJECT CONDITIONS
A. Protect plants, lawns, rock outcroppings, and other features to remain as a portion of final landscaping.
B. Protect bench marks, survey control points, existing structures, fences, sidewalks, paving, and curbs from grading equipment and vehicular traffic.
PART 2 PRODUCTS
2.01 MATERIALS
A. Topsoil: See Section 02316.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that survey bench mark and intended elevations for the Work are as indicated.
3.02 PREPARATION
A. Identify required lines, levels, contours, and datum.
3.03 ROUGH GRADING
A. Remove topsoil from areas to be further excavated, re-landscaped, or re-graded, without mixing with foreign materials.
B. Do not remove topsoil when wet.
C. Remove subsoil from areas to be further excavated, re-landscaped, or re-graded.
D. Do not remove wet subsoil, unless it is subsequently processed to obtain optimum moisture content.
E. When excavating through roots, perform work by hand and cut roots with sharp axe.
F. Stability: Replace damaged or displaced subsoil to same requirements as for specified fill.
3.04 SOIL REMOVAL
A. Stockpile topsoil to be re-used on site; remove remainder from site.
B. Stockpiles: Use areas designated on site; pile depth not to exceed 8 feet (2.5 m); protect from erosion.
3.05 FINISH GRADING
A. Before Finish Grading:
1. Verify subgrade has been contoured and compacted.
B. Remove debris, roots, branches, stones, in excess of 1/2 inch (13 mm) in size. Remove soil contaminated with petroleum products.
CXT Installation 03231 - 2 THE POCKET RECREATION AREA
C. Place topsoil during dry weather.
D. Remove roots, weeds, rocks, and foreign material while spreading.
E. Fine grade topsoil to eliminate uneven areas and low spots. Maintain profiles and contour of subgrade.
3.06 TOLERANCES
A. Top Surface of Subgrade: Plus or minus 1/10 foot (30 mm) from required elevation.
B. Top Surface of Finish Grade: Plus or minus 1/2 inch (13 mm).
3.07 CLEANING AND PROTECTION
A. Remove unused stockpiled topsoil. Grade stockpile area to prevent standing water.
END OF SECTION 03231
CXT Installation 04751 - 1 THE POCKET RECREATION AREA
SECTION 04751
CEMENT CONCRETE PAVEMENT
PART 1 – GENERAL
1.1 SUMMARY
A. This Section includes cement concrete pavement for the following applications:
1. Driveways and roadways.
2. Parking lots.
3. Curbs and gutters.
4. Walkways.
5. Pavement – marking paint
6. Wheel stops
1.2 SUBMITTALS
A. Product Data: For each manufactured material and product indicated.
B. Design Mixes: For each concrete mix indicated.
C. Material certificates.
1.3 QUALITY ASSURANCE
A. Manufacturer Qualifications: Manufacturer of ready-mixed concrete products com-plying with ASTM C 94 requirements for production facilities and equipment.
B. ACI Publications: Comply with ACI 301, "Specification for Structural Concrete," un-less modified by the requirements of the Contract Documents.
PART 2 – PRODUCTS
2.1 STEEL REINFORCEMENT
A. Plain-Steel Welded Wire Fabric: ASTM A 185, fabricated from as-drawn steel wire into flat sheets.
B. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening steel reinforcement. Manufacture bar supports according to CRSI's "Manual of Standard Practice.
2.2 CONCRETE MATERIALS
A. Portland Cement: ASTM C 150, Type I or II.
1. Fly Ash: ASTM C 618, Class F or C.
2. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.
B. Aggregate: ASTM C 33, uniformly graded, from a single source.
C. Water: ASTM C 94.
CXT Installation 04751 - 2 THE POCKET RECREATION AREA
D. Synthetic Fiber: Fibrillated or monofilament polypropylene fibers engineered and de-signed for use in concrete pavement, complying with ASTM C 1116, Type III, 1/2 to 1-1/2 inch (13 to 38 mm) long.
E. Admixtures: Certified by manufacturer to contain not more than 0.1 percent water-soluble chloride ions by mass of cement and to be compatible with other admixtures, as follows:
1. Air-Entraining Admixture: ASTM C 260.
2. Water-Reducing Admixture: ASTM C 494, Type A.
3. High-Range, Water-Reducing Admixture: ASTM C 494, Type F.
4. Water Reducing and Accelerating Admixture: ASTM C 494, Type E.
5. Water Reducing and Retarding Admixture: ASTM C 494, Type D.
F. Curing Materials:
1. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. (305 g/sq. m) dry.
2. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.
3. Water: Potable.
4. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete.
5. Clear Solvent-Borne Liquid-Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B.
6. Clear Waterborne Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B.
7. White Waterborne Membrane-Forming Curing Compound: ASTM C 309, Type 2, Class B.
G. Related Materials:
1. Expansion- and Isolation-Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber, or ASTM D 1752, cork or self-expanding cork.
2. Coloring Agent: ASTM C 979, synthetic mineral-oxide pigments or colored water-reducing admixtures;
color stable, nonfading, and resistant to lime and other alkalis.
2.3 CONCRETE MIXES AND MIXING
A. Concrete Mixes: Prepare design mixes, proportioned according to ACI 211.1 and ACI 301, with the following properties:
1. Compressive Strength (28 Days): 3000 psi.
2. Maximum Water-Cementitious Materials Ratio: 0.50.
3. Slump Limit: 3 inches (100 mm).
4. Air Content: 4.5 to 7.5 percent.
B. Synthetic Fiber: Uniformly disperse in concrete mix at manufacturer's recommended rate, but not less than 1.0 lb/cu. yd. (0.60 kg/cu. m).
CXT Installation 04751 - 3 THE POCKET RECREATION AREA
C. Ready-Mixed Concrete: Comply with requirements and with ASTM C 94.
D. Ready-Mixed Concrete: Comply with requirements and with ASTM C 94 and ASTM C 1116.
E. Project-Site Mixing: Comply with requirements and measure, batch, and mix concrete materials and concrete according to ASTM C 94. Mix concrete materials in appropri-ate drum-type batch machine mixer.
2.4 AUXILIARY MATERIALS
A. Pavement Marking Paint: Alkyd-resin type, lead ad chromate free, ready mixed, com-plying with FS TT-P- 115, Type [I] [II] or AASHTO M 248, type [N] [F].
1. Color: White for standard parking and Blue for accessible parking.
B. Pavement-Marking Paint: Latex, waterborne emulsion, lead and chromate free, ready mixed, complying with FS TT-P-1952, with drying time of less than [3] [45] minutes.
1. Color: White for standard parking and Blue for accessible parking.
C. Wheel Stops: Precast, air-entrained concrete, 2500-psi (17.2-Mpa) minimum com-pressive strength, 4-1/2 inches (115 mm) height by 9 inches (225 mm) wide by 72 inches (1800 mm) long. Provide chamfered corners and drainage slots on underside and holes for anchoring to substrate.
1. Dowels: Galvanized steel, ¾-inch (19-mm) diameter, 10-inch (254-mm) mini-mum length
A. Signs: A Reserved Parking for persons with disabilities (R7-8) shall be used. A Van Accessible (R7-8a) plaque shall be mounted below the R7-8 sign.
PART 3 – EXECUTION
3.1 INSTALLATION
A. Surface Preparation: Proof-roll prepared sub base, and remove loose material from surface.
B. Forms: Set, brace, and secure edge forms, bulkheads, and intermediate screed guides for pavement to required lines, grades, and elevations.
C. Reinforcement: Accurately position and support reinforcement, and secure against displacement. Set wire ties with ends directed into concrete.
1. Install welded wire fabric in lengths as long as practicable; lap at least one full mesh, and lace splices with wire.
D. Joints: Locate and install construction, isolation, contraction, and expansion joints as indicated.
E. Concrete Placement: Comply with recommendations in ACI 304R for measuring, mixing, transporting, and placing concrete. Place concrete in a continuous operation within planned joints or sections.
1. Moisten sub base to provide a uniform dampened condition at time concrete is placed.
2. Consolidate concrete by mechanical vibrating equipment supplemented by hand spading, rodding, or tamping according to recommendations in ACI 309R.
3. Screed and initial-float concrete surfaces with darby or bull float before excess moisture or bleed water appears on the surface.
4. Protect concrete from cold or hot weather during mixing, placing, and curing.
F. Evaporation Retarder: Apply to concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h (1 kg/sq. m x h) before and during finishing operations. Apply according to manufacturers written instructions after plac-ing, screeding, and bull floating or darbying concrete, but
CXT Installation 04751 - 4 THE POCKET RECREATION AREA before float finishing.
3.2 FINISHES AND CURING
A. Float Finish: Begin the second floating operation when bleed-water sheen has disap-peared and the concrete surface has stiffened sufficiently to permit operations. Float surfaces to true planes with gaps below 10-foot- (3-m-) long, unleveled straightedge not to exceed 1/4 inch (6 mm). Cut down high spots, and fill low spots. Refloat sur-face immediately to uniform granular texture.
1. Medium-to-Coarse-Textured Broom Finish: Provide a coarse finish by striating float-finished concrete surface 1/16 to 1/8 inch (1.6 to 3 mm) deep with a stiff-bristled broom, perpendicular to line of traffic.
B. Curing: Begin curing after finishing concrete, but not before free water has disap-peared from concrete surface. Cure concrete by one or a combination of the following methods:
1. Moisture cure concrete by water, continuous fog spray, continuously wet ab-sorptive cover, or by moisture-retaining-cover curing. Keep surfaces conti-nuously moist for not less than seven days.
2. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions.