SF30 - Amendment 1.pdf
PDF 83 KB Posted
- Solicitation number
- AG-4419-S-10-0582
About this file
SF30 - Amendment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cradle Trail Sign in Sheet.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section B - Schedule of Items.pdf | ||
| Exhibit 1 - Drawings.pdf | ||
| Section A - SF 1442.pdf | ||
| Attachment 1 - Specifications.pdf | ||
| Section B1 - SoI - Supp Instructions.doc | DOC document | |
| Sections C thru M - Solicitation.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-4419-S-10-0582
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ATLANTA GA 30309
1720 PEACHTREE ROAD NW
EROC EAST
US FOREST SERVICE
ATLANTA GA 30309
1720 PEACHTREE ROAD NW
EROC EAST
US FOREST SERVICE
AG4419S10-058205/03/2010000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/13/2010
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide:
1) Responses to questions asked at the pre-bid meeting:
1. Sheet P1 of 29 of the Drawings states "Remove 4" existing gravel & reuse as directed by
COR. Clean excess fill to be spread evenly over existing roadbed. Compact fill to be suitable for seeding. seed & mulch"
*** Reply *** This note should be restated to say " Remove existing stone in the areas of the constructed trail that will be effected with the new grading plan. Transition the existing trail into the new proposed grades and reuse the existing gravel/stone by removing
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
GARY S. BABER
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-4419-S-10-0582/000001
prior to grading and reusing as the finished surface material."
2. Sheet P2 of 29 of the Drawings states "Remove
4" existing gravel & reuse as directed by COR.
Clean excess fill to be spread evenly over existing roadbed. Compact fill to be suitable for seeding. seed & mulch"
***REPLY*** This note should be restated to say "
Remove existing stone in the areas of the constructed trail that will be effected with the new grading plan. Transition the existing trail into the new proposed grades and reuse the existing gravel/stone by removing prior to grading and reusing as the finished surface material."
3. Specification 02230 Clearing - This specification requires all clearing material to be removed from the project.
*** REPLY *** Add note to 3.01 Clearing under the execution part 3 to read.
D. All clearing debris shall be removed from the project site and disposed of by the contractor, or shipped on site and disposed of in areas designated by the COR within 1 mile of the project after shipping is complete.
2) Sign-in Sheet from pre-bid meeting - See attached
All other terms and conditions remain unchanged.
This project is funded in whole by the American
Recovery and Reinvestment Act (ARRA).
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .