Schedule of Items-1- EY-Trails.pdf

PDF 9 KB Posted

Attached to
RECOVERY - TRAILS RESTORATION ON EL YUNQUE NATIONAL FOREST IN PUERTO RICO
Solicitation number
AG-4419-S-10-0574
Issued by

About this file

Bid Schedule of Items

View the file

Other files

File Type Posted
SPEC. BT-LM-EP-Trail-Reconstruction-Specs.pdf PDF
R-6 Trail Specs Customary Units_ July 05.pdf PDF
ElYunqueTrailsDrawings.pdf PDF
PR2_dvb.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items

PAY ITEM DESCRIPTION OF ITEM Quantity MM UNIT COST TOTAL

I BIG TREE TRAIL

916(02) Removal of ExistingTread 3176 AQ SF

921(08) 10" PVC Pipe, Schedule 40 6 AQ LF

923(02) Rock Spillway 7 AQ CY

925(01) Concrete Dips 13 AQ EA

935(01) Rock Retaining Wall 2.5 AQ SY

945(01) Concrete Trail Surfacing 3585 AQ SF

951(01) Mobilization 1 LDQ L.S.

953(01) Barriers, Type Handrail 40 AQ LF

953(02) Barriers, Handrail Pipe Replacement 61 AQ LF

953(03) Barriers, Wood Posts Repair 1 LDQ LS

II LA MINA TRAIL

916(02) Removal of Existing Tread 68 AQ SF

923(02) Rock Spillway - Rip Rap 15 AQ CY

925(01) Concrete Dips 6 AQ EA

945(01) Concrete Trail Surfacing 68 AQ SF

953(01) Barriers, Type Handrail 27 AQ LF

953(02) Barriers, Type Handrail Pipe Replacement 90 AQ LF

III EL PORTAL TRAIL

912(06) Rolling Dip 14 AQ EA

941(02) Aggregate Surfacing, Grading A, Compaction Method b 30 AQ CY

Sub Total

BID ALTERNATES

BIG TREE

941(02) Aggregate Surfacing, Grading A, Compaction Method b 109 AQ CY

991(01) Drainage Maintenance 1 LSQ L.S.

LA MINA

923(02) Rock Spillway - Rip Rap 70 AQ CY

TOTAL=