Clarification Notice.docx
DOCX document 12 KB Posted
- Solicitation number
- AG-4419-S-10-0573
About this file
Clarification notes
View the file
Other files
| File | Type | Posted |
|---|---|---|
| drawing -2.pdf | ||
| Drawing-1.pdf | ||
| Wage Determination.pdf | ||
| SOW.docx | DOCX document | |
| Location Map.pdf | ||
| Clauses.docx | DOCX document | |
| SF 1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarification Notice:
1. Q. What is the contract performance time?
A. Performance time is 90 days
2. Q. Can we camp on site?
A. Yes – There is a campsite adjacent to the project site that the contractors may use for the duration of this contract. However, there is no electrical power or water at this site.
3. Q. Who will do the clearing of the workspace below the downstream face of the Dam?
A. Forest Service will clear a working zone below the downstream face of the Dam.
4. Q. Do you have any more information on the Dam’s length, height, or age?
A. Crest to streambed height is 28 feet; center line length is 186 ft; crest width is 5 ft; hydraulic height is 24 ft; crest elevation is 975 ft; and the year the bridge was constructed is 1937.
5. Q. Do you have drawings of the Dam?
A. See attached drawings 1 and 2.
6. Q. Will this solicitation be extended?
A. Yes, the response date for this solicitation is extended from 3 May 2010 to 10 May 2010.