Clarification Notice.docx

DOCX document 12 KB Posted

Attached to
RECOVERY - Repair Downstream Face of Rock Creek Dam in Fannin County, GA
Solicitation number
AG-4419-S-10-0573
Issued by

About this file

Clarification notes

View the file

Other files

File Type Posted
drawing -2.pdf PDF
Drawing-1.pdf PDF
Wage Determination.pdf PDF
SOW.docx DOCX document
Location Map.pdf PDF
Clauses.docx DOCX document
SF 1442.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarification Notice:

1. Q. What is the contract performance time?

A. Performance time is 90 days

2. Q. Can we camp on site?

A. Yes – There is a campsite adjacent to the project site that the contractors may use for the duration of this contract. However, there is no electrical power or water at this site.

3. Q. Who will do the clearing of the workspace below the downstream face of the Dam?

A. Forest Service will clear a working zone below the downstream face of the Dam.

4. Q. Do you have any more information on the Dam’s length, height, or age?

A. Crest to streambed height is 28 feet; center line length is 186 ft; crest width is 5 ft; hydraulic height is 24 ft; crest elevation is 975 ft; and the year the bridge was constructed is 1937.

5. Q. Do you have drawings of the Dam?

A. See attached drawings 1 and 2.

6. Q. Will this solicitation be extended?

A. Yes, the response date for this solicitation is extended from 3 May 2010 to 10 May 2010.