Wage Detemination Rates MN47.docx

DOCX document 19 KB Posted

Attached to
RECOVERY - AQUATIC ORGANISM PASSAGE STRUCTURES (HEARTBREAK CREEK), SUPERIOR NATIONAL FOREST, MN
Solicitation number
AG-4419-S-10-0559
Issued by

About this file

Wage Determination Statement MN47

View the file

Other files

File Type Posted
QUESTION.docx DOCX document
SF 30.pdf PDF
Revised SF1442.pdf PDF
0559 Standard Clauses.docx DOCX document
Heartbreak bridge plan - C.pdf PDF
Heartbreak bridge maps plan revised 031510-C.pdf PDF
SF1442.pdf PDF
Experience_Capability Statement.docx DOCX document
Heartbreak Bridge Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-4419-S-10-0559

WAGE DETERMINATION STATEMENT

General Decision Number: MN100047 03/12/2010 MN47

Superseded General Decision Number: MN20080047

State: Minnesota

Construction Type: Highway

Counties: Cook and Lake Counties in Minnesota.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 03/12/2010

ELEC0242-009 05/31/2009

Rates Fringes

ELECTRICIAN......................$ 31.24 63.5%

ENGI0049-030 05/01/2009

Rates Fringes

Power Equipment Operator

GROUP 1.....................$ 31.57 15.25

GROUP 2.....................$ 30.57 15.25

GROUP 3.....................$ 30.02 15.25

GROUP 4.....................$ 29.72 15.25

GROUP 5.....................$ 26.68 15.25

GROUP 6.....................$ 25.47 15.25

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1 - Hydraulic Backhoe and/or other similar equipment with Shovel-type Controls 3 cu. yds. & over Mfg. rated Cap.

GROUP 2 - Hydraulic Backhoe and/or similar equipment with Shovel-type Controls, up to 3 cu. yds. Mfg. rated cap.;

Front End Loader, 5 cu. yds. & over; Mixer (Paving) Concrete Paving, Road; Tandem Scraper

GROUP 3 - Scraper - Struck Cap. 32 cu. yds. & over

GROUP 4 - Bituminous Spreader & Finishing (Power); Cat & Scraper; Crushing Plant (Gravel & Stone) or Gravel Washing, Crushing & Screening Plant; Front End Loader, over 1 cu.

yd.; Rubber- tired Farm Tractor, Backhoe Attach.; Scraper, up to 32 cu. yds.; Tractor, Bulldozer

GROUP 5 - Bituminous Spreader & Bituminous Finishing Machine Tender (Power); Concrete Distributor & Spreader Finishing Machine, Longitudinal Float, Joint Machine, & Spray; Self-propelled Chip Spreader (Flaherty or similar); Shouldering Machine (Power) Apsco or similar type inclu. self-propelled Sand & Chip Spreader; Tractor Operator, Bulldozer, 50 HP or less

GROUP 6 - Oiler (Power Shovel, Crane, Dragline); & Truck Crane Oiler

UNDERGROUND WORK:

TUNNELS, SHAFTS, ETC. - $ .25 PREMIUM UNDER AIR PRESSURE -

$ .50 PREMIUM

HAZARDOUS WASTE PROJECTS (PPE Required):

LEVEL A - $1.25 PREMIUM

LEVEL B - $ .90 PREMIUM

LEVEL C - $ .60 PREMIUM

LABO1091-007 05/01/2009

Rates Fringes

Laborers: (Construction Laborer; Bituminous Worker-Shoveler, Raker, Floater, Squeegee, Utility)......$ 27.14 11.52

PLAS0633-009 05/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 29.63 15.45

SUMN1999-019 04/13/1999

Rates Fringes

LABORER: Landscape..............$ 9.13 3.39

* TEAM0160-011 05/01/2009

Rates Fringes

TRUCK DRIVER (Tandem Axles)......$ 25.10 12.40

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION