About this file

Heartbreak Bridge Specifications

View the file

Other files

File Type Posted
QUESTION.docx DOCX document
SF 30.pdf PDF
Revised SF1442.pdf PDF
0559 Standard Clauses.docx DOCX document
Heartbreak bridge plan - C.pdf PDF
Heartbreak bridge maps plan revised 031510-C.pdf PDF
SF1442.pdf PDF
Experience_Capability Statement.docx DOCX document
Wage Detemination Rates MN47.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIM-0903/0909-8EW-222-0909-03

Aquatic Organism Passage Structures-Heartbreak Creek

Table of Contents

Table of Contents

Preface

101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid, Award, and Execution of Contract

102 Bid, Award, and Execution of Contract

103 - Scope of Work

Deletions

104 - Control of Work

Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources

105.02(a) Government-provided sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.01 Conformity with Contract Requirements

106.07 Delete

107 - Legal Relations and Responsibility To the Public

107.11 Protection of Forests, Parks, and Public Lands:

107.08 Sanitation, Health, and Safety

107.10 Environmental Protection

107.11 Protection of Forests, Parks, and Public Lands

108 - Prosecution and Progress

108 Delete

109 - Measurement and Payment

109 Deletions

109.02 Measurement Terms and Definitions

153 - Contractor Quality Control

153.02 Contractor Quality Control Plan

153.04 Records

155 - Schedules for Construction Contracts

155 Delete

157 - Soil Erosion Control

157.03 General

203 - Removal of Structures and Obstructions

203.01 Description

203.04 Removing Material

208 - Structure Excavation and Backfill for Selected Major Structures

208.04 General

208.08 Dewatering

208.10 Backfill

301 - Untreated Aggregate Courses

301 Title Change

301.01 Work

301.02 Material

301.03 General

301.04 Mixing and Spreading

301.05 Compacting

301.06 Surface Tolerance

Table 301-1 Field Density Requirements

Table 301-1—Acceptance Sampling and Testing Requirements

301.09 Measurement

551 - Driven Piles

551.03 Pile Driving Equipment

625 - Turf Establishment

625.03 General

625.04 Preparing Seedbed

625.05 Watering

625.06 Fertilizing

625.07 Seeding

625.08 Mulching

625.09 Protecting and Caring for Seeded Areas

625.11 Measurement

557- Timber Structures

557.03 General

557.21 Payment

635 - Temporary Traffic Control

635.03 General

703 - Aggregate

703.06 Crushed Aggregate

713 - Roadside Improvement Material

713.05 Mulch

714 - Geotextile and Geocomposite Drain Material

714.01 Geotextile

714.02 Geocomposite Drains

715 - Piling

715.02 Treated Timber Piles

715.08 Pile Shoes

715 – Piling

Soil Boring

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all

The intent of this contract is to provide for the construction of the Heartbreak Creek Bridge on low volume Forest Road 166; traffic control; remove and dispose of the existing 16’-7” x 10’-1” multiplate culvert; furnish and install new timber abutments and bulkhead planking; excavation and necessary for construction, geocomposite drainage material, furnish and place fill and aggregate to final road grade; install permanent bridge signs; furnish and install timber superstructure – including girders, deck system, railing systems and all associated hardware;

timber wearing surface on the bridge; furnish any specified rip-rap; seed and mulch all disturbed areas; and protect Heartbreak Creek and associated wetlands from siltation and other destructive impacts of construction.

The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies necessary to meet the intent of this contract; and shall perform all work in close conformity with the drawings and specifications, and in accordance with the provisions of the contract.

The CO must approve any deviation in the specifications or drawings.

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.01_nat_us_07_31_2007

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to

106.05 inclusive. The primary method of acceptance is specified in each Section of work.

However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program.

Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol.

If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility To the Public

107.11_nat_us_02_17_2005

107.11 Protection of Forests, Parks, and Public Lands:

Add the following:

No In-Stream work from September 15 to March 15.

All roads must be open and passable by the public from September 15 to October 15.

All seeding shall be completed before September 15, 2006.

107.08 Sanitation, Health, and Safety.

Add the following:

Perform all operations in a prudent, conscientious, safe and professional manner. Ensure that all personnel involved in handling and packaging the hazardous waste be trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures and spills. Provide handling and personnel protective equipment appropriate to ensure safe handling of the hazardous waste (at a minimum, in accordance with 29 CFR 1910.120). Provide notification to the Forest Service of all hazardous material that may be brought onto the National Forest as part of accomplishing the tasks under

107.10 Environmental Protection.

Add the following:

Do not locate equipment repair shops, stationary refueling sites, or other facilities where hazardous material may be spilled on Government land.

Before beginning any work, submit a Hazardous Spill Plan. In the plan, list actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, etc. Immediately notify the CO of all hazardous spills. Provide a written report in narrative form no later than 24 hours after the initial report and include the following:

Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

Exact time and location of spill including a description of the area involved.

Containment procedures.

Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue. Include copies of all spill related clean-up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for any and all spills or leaks and subsequent clean ups required during the performance of this contract which occur as a result of or are contributed to by the actions of its agents, employees, or subcontractors. Clean up such spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations. Perform the clean up at no cost to the Government.

107.11 Protection of Forests, Parks, and Public Lands.

Add the following:

Immediately extinguish without expense to the Government all fires on or in the vicinity of the project which are caused by the Contractor’s employee’s, whether set directly or indirectly as a result of construction operations, with or without direction by the Forest Service. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government resulting from fires set or caused by Contractor’s employees or resulting construction operations.

Contractor’s Responsibility for Controlling Other Emergencies - When requested by the Contracting Officer, allow the Forest Service to temporarily use employees and equipment for emergency control work. Payment will be made at not less than the current area rate established by the Forest Service.

Do not burn camp refuse, brush, slash, or debris such as that resulting from clearing around camps or on rights-of-way, without the written approval of the Contracting Officer. Submit written requests for burning to the Contracting Officer at least 48 hours in advance of intended burning. The Contracting Officer will approve routine camp refuse disposal incineration in the camp development proposal.

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

153 - Contractor Quality Control

153.02_nat_us_02_17_2005

153.02 Contractor Quality Control Plan.

Add the following:

Submit written proposals for approval of alternate AASHTO or State approved test methods.

Alternate methods may be allowed based on documented equivalence to the specified method.

153.04_nat_us_10_24_2007

153.04 Records.

Delete all but the first sentence

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

157 - Soil Erosion Control

157.03_nat_us_02_24_2005

157.03 General

Delete the entire subsection and replace with the following:

Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction.

Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted 30 days before intended use.

Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.

When erosion control measures are not functioning as intended, immediately take corrective action.

203 - Removal of Structures and Obstructions

203.01_nat_us_02_25_2005

203.01 Description.

Delete and replace with the following:

This work consists of removal and disposing the existing multiplate culvert from FR 166 as shown on the drawing. construction slash and debris, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.

203.04_nat_us_02_18_2005

203.04 Removing Material.

(a) Removal from the Project is the selected method.

208 - Structure Excavation and Backfill for Selected Major Structures

208.04_nat_us_08_05_2009

Construction Requirements

208.04 General.

Add the following to the end of the second sentence of the third paragraph:

"... to the CO a minimum of 5 days prior to beginning excavation work."

Add the following to the end of the third sentence of the third paragraph:

"...to the CO a minimum of 15 days prior to installation."

208.13 Measurement.

Add the following to the second paragraph:

(f) Material excavated to construct end walls or wing walls which lie outside the excavation limits specified above.

Add the following paragraph:

Foundation over-excavation and the resulting replacement material will not be measured for payment unless the CO determines the over-excavation was unavoidable because of the nature of the material.

During removal of existing bulkheads and installation of new bulkheads and all associated embankment work, the Contractor shall install silt fencing and hay bales to separate the areas of excavation from the river channel in accordance with the Federal Highway Administration’s “Best Management Practices for Erosion and Sediment Control”, and the Wisconsin DNR’s water quality permit for this project. As a minimum, Contractor will install silt fencing protecting water and drainage from any and all disturbed areas and stockpiles. Contractor will provide silt screening in the River and around any disturbances taking place that could drain into the river.

Excavation for the structure shall extend a sufficient distance from each bulkhead to accommodate construction and shall include removal of the existing roadbed and backfill down to the creek bed for the full width of the roadway and fill slopes.

Excavated materials deemed suitable by the CO will be stockpiled in an area designated by the CO, and may be used as backfill.

208.08 Dewatering.

Cofferdams and dewatering are not expected to by needed for proper construction of this project.

Construction will not occur during periods of high water.

The geotextile drainage material shall be installed with the bulkhead planking, AS SHOWN ON

THE DRAWINGS.

208.10 Backfill.

Add the following:

All backfill required to obtain additional width on this section of the road is included in this Pay Item. Backfill shall be placed and compacted in horizontal layers, not over 12 inches (loose measure), in gradation as SHOWN ON THE DRAWINGS. Aggregate moisture content shall be approved by the CO before compaction. Each aggregate and backfill layer shall be compacted by mechanical compaction means, as approved by the CO.

Material excavated to remove the culvert is expected to be able to be used for backfill ater approval by the CO. Any additional backfill material needed shall be suitable pit-run aggregate meeting with approval by the CO prior to hauling, and shall be free of excess moisture, muck, frozen material, roots, sod, or other unsuitable material. Backfill shall also be free of rock having its largest dimension greater than 6 inches.

301 - Untreated Aggregate Courses

301.00_nat_us_03_03_2005

301 Title Change.

Change the title to: Section 301 Aggregate Courses

301.01_nat_us_03_03_2005

301.01 Work.

Add the following:

Work includes producing aggregate by pit-run, grid rolling, screening, or crushing methods, or placing Government-furnished aggregate. Work may include additive mineral filler, or binder.

301.02_nat_us_05_16_2005

301.02 Material.

Add the following:

Bentonite 725.30

Calcium Chloride Flake 725.02

Lignon Sulfonate 725.20

Magnesium Chloride Brine or Calcium Chloride Liquid 725.02

301.03_nat_us_09_14_2005

301.03 General.

Add the following:

Written approval of the roadbed is required before placing aggregate.

For pit run or grid-rolled material, furnish material smaller than the maximum size. No gradation other than maximum size will be required for pit-run or grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size. After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.

Provide additives or binder, if required, at the proportions specified.

Develop and use Government furnished sources according to Section 105.

If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320. Establish stockpile sites at locations approved. Clear and grub stockpile sites according to Section 201.

301.04_nat_us_03_03_2005

301.04 Mixing and Spreading.

Delete the first sentence of the first paragraph and add the following:

Ensure that aggregate and any required additives, water, mineral filler, and binder are mixed by the specified method except, if crushed aggregate products are being produced and mineral filler, binder, or additives are required, uniformly blend following crushing. Control additive proportions to 0.5 percent dry weight.

(a) Stationary Plant Method. Mix the aggregate with other required materials in an approved mixer. Add water during the mixing operation in the amount necessary to provide the moisture content for compacting to the specified density. After mixing, transport the aggregate to the jobsite while it contains the proper moisture content, and place it on the roadbed or base course using an aggregate spreader.

(b) Travel Plant Method. After placing the aggregate for each layer with an aggregate spreader or windrow-sizing device, uniformly mix it with other required materials using a traveling mixing plant. During mixing, add water to provide the necessary moisture content for compacting.

(c) Road Mix Method. After placing the aggregate for each layer, mix it with other required materials at the required moisture content until the mixture is uniform throughout. Mix aggregate, water, and all other materials until a uniform distribution is obtained.

Spread the aggregate in a uniform layer, with no segregation of size, and to a loose depth that will provide the required compacted thickness.

When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.

Route and distribute hauling and leveling equipment over the width and length of each layer.

301.05_nat_us_05_17_2005

301.05 Compacting

Delete and replace with the following:

Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

Compaction A. Operating spreading and hauling equipment over the full width of the travelway.

Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).

Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

301.06_nat_us_03_03_2005

301.06 Surface Tolerance.

Add the following:

Thickness and Width requirements:

The maximum variation from the compacted specified thickness is ½ inch. The compacted thickness is not consistently above or below the specified thickness and the average thickness of 4 random measurements for any ½ mile of road segment is within + ¼ inch of the specified thickness.

The maximum variation from the specified width will not exceed +12 inches at any point. The compacted width is not consistently above the specified width and the average of any four random measurements along any ½ mile of road segment is within +4 inches of the specified width.

301.08_nat_us_02_07_2007

Table 301-1 Field Density Requirements.

Table 301-1: Delete laboratory and field density requirements for base, subbase, and surfacing and replace with the following:

Material or Product

Type of Acceptance (Subsection)

Characteristi c

Category Test Methods Specification s

Sampling Frequency

Point of Sampling

Split Sample

Reporting Time

Base and Subbase

Measured and tested conformance (Subsection 106.04)

Moisture Density ---

Method C --- AASHTO T 99 1 per type and source of material

Source of material

Yes Before using in work

Method C-1 --- R-1 Marshall “ “ “ “

Method D --- AASHTO T 180 “ “ “ “

Method D-1 --- R-1 Marshall “ “ “ “

Compaction ---

Method C, C-1, D, D-1

--- AASHTO T 310 or other approved procedures

1 per 500 t In-place --- Before placing the next layer

Surfacing Measured and tested conformance (Subsection 106.04)

Moisture Density

Method C-1 --- R-1 Marshall “ “ “ Before using in work

Method D --- AASHTO T 180 “ “ “ “

Method D-1 --- R-1 Marshall “ “ “ “

Compaction

Method C, C-1, D, D-1

--- AASHTO T 310 or other approved procedures

1 per 500 t In-place --- Before placing the next layer

301.08_nat_us_03_03_2005

Table 301-1: Add the following:

Table 301-1—Acceptance Sampling and Testing Requirements.

Material or Type of Characteristi Category Test Methods Sampling Point of Split Reporting

Product Acceptance (Subsection) c Specification s

Frequency Sampling Sample Time

Subbase & Base Courses L, M, N, O, P, Q, R

Measured and tested conformance

(Subsection 106.04)

Plastic Limit - AASHTO T 90 1 per each 1,000 T

From the windrow or roadbed after processing

Yes 4 Hours

Table 301-1—Acceptance Sampling and Testing Requirements.

Material or Product

Type of Acceptance (Subsection)

Characteristi c

Category Test Methods Specification s

Sampling Frequency

Point of Sampling

Split Sample

Reporting Time

Aggregate Width Measured and tested conformance

(Subsection 106.04)

Width - - 4 per each 0.5 mi

Roadbed after processing

- 4 Hours

Aggregate Thickness Measured and tested conformance

(Subsection 106.04)

Thickness - - 4 per each 0.5 mi

Roadbed after processing

- 4 Hours

Additive Measured and tested conformance

(Subsection 106.04)

Amount of Additive - 1 per each 1,000 T

From the windrow or roadbed after processing

No 4 Hours

301.09_nat_us_07_07_2005

301.09 Measurement.

Replace the second paragraph with the following:

Measure aggregate by cubic yard compacted in place when payment is by contract quantities.

301.10_nat_us_03_03_2005

301.10 Payment

Substitute the following:

Payment for crushed aggregate material and compaction is incidental to Pay Item 20806.

551 - Driven Piles

551.03_nat_us_08_05_2009

Construction Requirements

551.03 Pile Driving Equipment

(b) Approval of pile driving equipment.

Delete the entire subsection and add the following:

At least 30 days prior to use, the Contractor will notify the CO of the planned pile driving equipment and will submit the specification sheet. The CO will evaluate the suitability of the pile driving equipment and will accept or reject the system.

551.04 Pile Lengths.

Estimated pile lengths are indicated on the drawings. It is thought that test piles are not necessary. If, at actual driving, significantly different lengths are indicated, the CO will be notified and CO and Contractor will decide whether the lengths may have to be changed considering engineering requirements, efficiency, and economy of the project.

All piling furnished and paid for is the property of the Government, including piling not driven to full penetration as directed by the CO. For cutoff pile lengths over 5 feet, deliver these to a storage area designated by the CO.

Furnish pile lengths less than 60 feet long as one piece, unless field splices, at the contractors expense, are approved in writing at the time of material submittal.

551.06 Driven Pile Capacity.

Add the following at the start of the section:

Bearing capacity of the piles may be determined by the appropriate ENR formula approved by the CO, the Dynamic Formula, or the Wave Equation analysis in consultation with a geotechnical engineering firm.

Add the following at the end of the first paragraph:

Drive piles to the minimum tip elevations shown on the plans. If a pile reaches refusal above the minimum tip elevation shown on the plans, do not overdrive the pile. Refusal is defined as 7 blows/inch.

Delete paragraph two and subsections (a) and (b).

551.08 Preparation and Driving.

Replace paragraph 4 and add the following:

Correct all piles driven improperly, driven out of proper location, misaligned, or driven below the designated cutoff elevation in a manner approved by the CO.

Add the following:

The CO will approve the contractor’s layout before driving and be present at all pile driving.

Broken piles will be removed and will not be paid for.

Piles not used will remain the property of the Contractor and not paid for.

Cut-off ends of piles will remain the property of the Forest Service.

Minimum pile penetration shall be 10’ below the stream bed.

551.09 Splices.

(a) Steel Piles.

Delete the last sentence of the last paragraph and replace with the following:

Approved proprietary manufactured splices may be used in place of full penetration groove butt welds; submit manufacturer's literature and attachment instructions to the CO for approval.

551.16 Measurement.

Driven length of timber piles will be measured to the nearest foot of piling in place between the actual tip elevation and the elevation of the ground existing at the pile immediately prior to driving. Structure excavation shall have been performed prior to this measurement.

625 - Turf Establishment

625.03_nat_us_02_25_2005

625.01

Add the following:

Fertilizer, seed, and mulch shall be applied to all road slopes and disturbed areas within the clearing limits that do not receive sod.

625.03 General.

Delete this subsection and replace with the following:

Apply turf establishment to prepared ground or any disturbed area between May 15 to June 20 or between September 1 to October 15). Apply turf establishment to the areas shown on the plans or worklists within 10 days after completion of ground disturbing activities. Seeded areas damaged by construction activities shall be reseeded within 10 days of the damage. Do not seed during windy weather or when the ground is excessively wet, frozen, or snow covered.

Assure that all seed and mulch used in the work conforms to the weed free requirements of Section 713.

625.04 Preparing Seedbed.

Delete entire subsection and replace with the following:

Ensure that the surface soil is in a roughened condition favorable for germination and growth.

625.05 Watering

Delete entire subsection.

625.06 Fertilizing.

Delete entire subsection and replace with the following:

Apply fertilizer having a chemical analysis as listed below by the following methods.

Dry Method. Apply the fertilizer with approved mechanical equipment. Hand operated methods are satisfactory on areas inaccessible to mechanical equipment.

Fertilizer. Apply fertilizer at following rate and chemical analysis:

Seasonal Period Type Application Rate Spring 20-10-20 or 17-17-17 10#/1000SF Fall 10-10-20 or 10-20-30 10#/1000SF

625.07 Seeding.

Delete the first sentence and add the following.

Apply seed mix by the following methods:

(a) Dry method. Delete the third sentence.

Add the following after subsection (b).

Seed Mix. Furnish and apply the following kinds and amounts of pure live seed at the rate of 75#/acre by weight. To be used on road slopes and disturbed areas within the clearing limits that do not receive sod and shall be composed of the following:

Name Percent in Mix

Min. % Germination

Min. % Pure Seed

Red Fescue (Festuca rubra) 16 85 97 Redtop (Agrostis alba) 9 85 97 Slender Wheatgrass (Agropyron)

4 85 97

Canada Wild Rye (Elymus Canadensis)

18 85 97

Kentucky Bluegrass (Poa pratensis)

18 85 97

Regreen 35 85 97

Determine the pounds of seed to be furnished per acre by dividing the pounds of pure live seed required per acre by the product of the percent purity and percent germination.

625.08 Mulching.

Delete the entire subsection and replace with the following:

Apply Mulch within 2 hours after seeding by the following methods.

(a) Dry Method. Apply mulch with a hand spreader or a spreader utilizing forced air at a rate of 2000 pounds per acre. Do not mark or deface structure, pavements, utilities, or plant growth with tackifier.

Inaccessible areas may be mulched by hand. Apply mulch uniformly over the entire disturbed area.

625.09 Protecting and Caring for Seeded Areas

Delete the first sentence and add the following:

Protect and care for seeded areas until final acceptance.

625.11 Measurement.

Delete the entire Subsection and replace with the following:

Measure the Section 625 items listed in the bid schedule according to Subsection 109.02.

557- Timber Structures

557.03 General

Add the following:

No treated timber or glulaminated material shall be included in the work until certificates covering that material have been submitted to and the material accepted by the CO. The Contractor shall provide the CO with reasonable time to approve certifications and access to inspect work in progress.

Government inspection will be made at the shop and at the project site to ascertain compliance with the contract requirements. Fabricator must guarantee the CO access to the plant for inspection during fabrication. Any bridge members supplied by the Contractor and found defective or deficient may be rejected. Replacement with acceptable material shall be at no additional cost to the Forest Service. The Contractor shall notify the CO prior to any shop fabrication. Two (2) sets of SHOP DRAWINGS, detailing assembly and including a list of timber materials and hardware, shall be submitted to the CO for review and approval a minimum of 2 weeks prior to any fabrication.

The contractor shall place all the deck panels on the superstructure before fastening them to the superstructure. This placement shall be approved by the CO prior to fastening.

557.21 Payment.

Delete the entire subsection and add the following:

The Treated Timber Structure shall be measured as two Pay Items:

1) Bridge Abutments, including pilings, backing boards, pile caps, drainage material, and all hardware AS SHOWN ON THE DRAWINGS; and necessary labor and equipment to construct the bridge.

Pay Item 57107 Bridge Substructure, Bridge Abutments Systems, Excluding Piles

2)Superstructure and Bridge Rail Systems, including girders, deck, transverse bracing, bridge rail system, approach rails, and all hardware AS SHOWN ON THE DRAWINGS; and necessary labor and equipment to construct the bridge.

Pay Item 57108 Bridge Superstructure, Fabrication, Deliver and Install

635 - Temporary Traffic Control

635.03_nat_us_05_13_2004

635.03 General.

Install temporary traffic control signs to temporary posts or approved temporary sign mounts.

During construction, Forest Road 166 shall be closed to all traffic. The Contractor shall consult with the CO and representatives from the local Townships to determine appropriate detour routes during bridge closure. The CO can act as liaison between Contractor and the Township. The Contractor shall submit, for approval by the CO, a sign and barricade plan for the closure of Forest Road 166 and the establishment of a detour route during construction of the bridge. Prior to start of work on the project, approved signing and barricades shall be provided and erected by the Contractor to provide for the safety of persons traveling in the vicinity of the project. Signs shall be maintained by the Contractor and be removed only when notified by the CO.

Construction signing and barricades for traffic control shall conform to the Manual on Uniform Traffic Control Devices.

The sign and barricade plan will also indicate the expected duration of the closure.

703 - Aggregate

703.05_nat_us_08_14_2009

703.06 Crushed Aggregate.

Add:

Furnish and apply crushed aggregate as indicated on the plans per Minnesota Standard Specifications for Construction, 3138, Class 5.

713 - Roadside Improvement Material

713.05_nat_us_03_02_2005

713.05 Mulch.

Add the following:

Assure that mulch used on the project is certified noxious weed free by the appropriate authority in the jurisdiction of use.

714 - Geotextile and Geocomposite Drain Material

714.01 Geotextile.

This work shall consist of furnishing and placing geotextile material along the backs of the abutments and wingwalls. This material shall be Type IIA.

This item is an incidental cost and shall be included for payment in Pay Item 57106, Bridge Substructure.

714.02 Geocomposite Drains.

This work shall consist of furnishing and placing a prefabricated drainage material on the abutment backing boards on each abutment as shown on the plans.

Material shall be polystyrene core covered with geotextile. Contech Stripdrain 75, Mirafi Miradrain 6000, or equal.

This item is an incidental cost and shall be included for payment in Pay Item 57106, Bridge Substructure.

715 - Piling

715.08_nat_us_08_05_2009

715.02 Treated Timber Piles.

Delete the last sentence of paragraph one.

Add the following:

Pilings shall be treated timber pilings, Southern Pine, preservative treated with CCA to .8 pcf per AWPA spec C3. Pilings shall conform to ASTM D25 (Standard Specification for Round Timber Piles), Table 1, friction piles. Minimum circumference requirement is 38 inches, measured 3 feet from the butt end. Other piling and preservatives may be substituted with CO approval.

715.08 Pile Shoes.

Add:

Pile Shoes are optional

715 – Piling