Schedule of Items 2-26-2010.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
RECOVERY: UPSTREAM ROCK RUN COAL MINE REMEDIATION, WAYNE NATIONAL FOREST
Solicitation number
AG-4419-S-10-0538
Issued by

About this file

Schedule

View the file

Other files

File Type Posted
Attachment 10001.pdf PDF
Attendees_Notes.docx DOCX document
SF 1442 Cont_0538.doc DOC document
CIM-0914-05A-02 Specifications.pdf PDF
SF 1442 Cont_0538.pdf PDF
CIM-0914-05A-02 Drawings .pdf PDF
Experience_Capability Statement.docx DOCX document
DBA_WD.pdf PDF
SF 1442.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule

U.S.F.S. WAYNE NATIONAL FOREST
CIM 0914-05A-02 Upstream Rock Run Coal Mine Remediation Project
COAL TOWNSHIP, PERRY COUNTY, OHIO
Schedule Of Items
Method of
ItemReference (FP-03)DescriptionMeasurementUnitQuantityUnit PriceItem Total
Base Items
1151MobilizationLSQEach1.0
2152Construction Survey and StakingLSQEach1.0
3201Clearing & Grubbing of Stumps - Method "A"CQAcres5.8
3201Clearing & Grubbing of Stumps - Method "B"CQAcres16.2
7223Riprap - Place Ohio Department of Transportation Size "C" limestone as channel liner and 16' pipe discharge as shown on drawings.AQTons1000.0
8204Topsoil conservationCQCu. Yd.3000.0
9301(A)Untreated Aggregate Courses - Ohio Department of Transportation type 89 aggregate as rock bedding for channel liner and 16' pipe discharge as shown on drawings.AQTons350.0
12157ASoil Erosion Control - Erosion Control BlanketsCQSq. Yd.4640.0
13157Soil Erosion Control - Silt FenceAQLF1000.0
14157AObtain OEPA - Storm Water Discharge Permit for Small and Large Construction SitesLSQEach1.0
16619Install and Modify Government provided gates.AQEach1.0
10A625ATurf Establishment - Standard Seed MixCQAcres16.0
10B625BTurf Establishment - Native Seed MixCQAcres2.8
4A204Excavation and Embankment - Engineered Fill, layer placement to minimum 95% maximum densityCQCu. Yd.28000.0
4B204Excavation and Embankment - Layer placement and compact to visual displacement stopsCQCu. Yd.37000.0
5A207Earthwork Geotextiles Geosynthetic clay linerCQSq. Yd.20900.0
5B207Earthwork Geotextiles - Channel separationCQCu. Yd.2100.0
6E640Construct prismatic Channel EAQLF230.0
SPS-1SPS-ITEM 18 Ft. Dia. ManholeAQEach1.0
SPS-2SPS-ITEM 24 Ft. Dia. ManholeAQEach1.0
SPS-3SPS-ITEM 316 in. Dia. Intake Certa-Lok Pipe and CouplingsCQLin. Ft.220.0
SPS-4SPS-ITEM 445 Deg. Sweep IntakeCQEach2.0
SPS-5SPS-ITEM 5Flange IntakeCQEach2.0
SPS-6SPS-ITEM 6Intake DeviceCQEach2.0
SPS-7SPS-ITEM 7Discharge 16 in. Dia. Certa-Lok Pipe and CouplingsCQLin. Ft.130.0
SPS-8SPS-ITEM 8Flange DischargeCQEach1.0

Subtotal Base Items $ - 0

Optional Items

9301(A)Untreated Aggregate Courses - Ohio Department of Transportation type 89 aggregate for full access trail surfacing.AQTons700.0
11602Culverts and Drains - 36" Polyethylene Culvert, smoothed lined corrugated pipe.AQLF80.0
15A214AComposite Trail Construction, Type "A" Trail meeting Architectural Barriers Act requirements for full access.AQLF4144.0
15B214BComposite Trail Construction, Type "B" trails in areas that can not meet ABA due to terrain restrictions.AQLF1644.0
17APer DrawingsEphemeral Pool construction as per drawingsLSQEach2.0
17BPer DrawingsLog placement in ponds and pools as per CORAQEach24.0

0.0 Optional Items $ - 0

ESTIMATE TOTALTOTAL$ - 0
One of the following methods of measurement for determining final payment is DESIGNATED IN THE SCHEDULE OF ITEMS for each PAY ITEM:
a.) Contract Quantities (CQ). These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units DESIGNATED IN THE SCHEDULE OF ITEMS may be authorized under any of the following conditions:
(1) Changes in the work authorized by the CO.
(2) A determination by the CO that errors exist in the original design that cause a PAY ITEM quantity to change by 15 percent or more.
(3) A written request submitted to the CO showing evidence of errors in the original design that cause the quantity of a PAY ITEM to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is in error.

b.) Staked Quantities (SQ). These quantities are determined from staked measurements prior to construction.

c.) Actual Quantities (AQ). These quantities are determined from measurements of completed work.

d.) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.

e.) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the unit of work.

File details come from the government source that posted it. Updated .