Schedule of Items Trail Mtc LLBO and MCC.doc

DOC document 41 KB Posted

Attached to
RECOVERY - Signs, Posts & Materials
Solicitation number
AG-4419-S-10-0506
Issued by

About this file

Schedule of items.

View the file

Other files

File Type Posted
Evaluation Criteria.doc DOC document
Specifications.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIM--0901-1T-508-0903-03

Chippewa Trail Maintenance - Purchase Signs, Posts, materials Schedule of Items: Combined District Materials

Schedule of Items

Item
FS District For Delivery
Description
Method of Measure
Est. Quantity
Unit
Unit Price
Amount
1
Walker
Treated 4”x4”x8’
Each
60
LS
2
Walker
Treated 6” x6” x 8’
Each
132
LS
3
Walker
Treated 2” x 10” x 8’
Each
312
LS
4
Walker
Treated CDX plywood 4x8’
Each
12
LS
5
Walker
Fasteners – wood screws 2.5”, 9 boxes
Each
9
LS
6
Walker
Fasteners – heavy duty staples, T50s, 0.5 inches; 5 boxes
Each
5
LS
8
Blackduck
Treated 8”x10’. These posts are round with an 8” diameter and 10 feet long.
Each
20
LS
9
Blackduck
Hardware for posts: A set is: specialty strapping: .25” x 3” steel bent to fit the 8” diameter posts. Also, 3.5” bolt screws.
Each
8 sets
LS
10
Blackduck
Treated 6”x8”x8’
Each
51
LS
11
Blackduck
Treated 2”x10”x8’
Each
104
LS
12
Blackduck
Fasteners – wood screws 2.5”, 2 boxes
Each
2
LS

Total Estimate:

LS = Lump Sum The Government may choose to proceed with multiple awards based on bids.

File details come from the government source that posted it. Updated .