Exhibit 1 - Plans Drawings.pdf

PDF 1 MB Posted

Attached to
RECOVERY* Trail Repair - Botetourt County, VA - GW & Jefferson National Forest
Solicitation number
AG-4419-S-10-0430
Issued by

About this file

Exhibit 1 - Plans Drawings

View the file

Other files

File Type Posted
SF 30 - Amendment 1.pdf PDF
Section A - Solicitation Form 1442.pdf PDF
Sections C-M.doc DOC document
Section B - Supplies or Services and Price.docx DOCX document
Attachment 1 - Specifications.docx DOCX document
Attachment 2 - Wage Determinations.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROARING RUN STREAMSIDE TRAIL -DESCRIPTION OF WORK

Details and Specification No. 932-2 933-3 934 941 941-4

Unit of Measure LF LF LF Lump Sum LF

From Station To Station Puncheon

Bridge

Log

Cribbing

Elevated

Boardwalk New Trail

Log

Retainer w/ Fill

Remarks

0+00

First station is an exposed culvert and easy to find no need to measure from 0+00

3+53 20

Install log retainer 10 feet both sides and pad over exposed culvert

Bridge 2 7+77 Reference point

Bridge 3 10+70 Reference point

14+90 15+14 24 Install log cribbing

Hand Rail 15+48 Reference point

15+48 15+68 20 Install log cribbing

Rock w/ Bonsai 17+65

17+65 17+91 26 Begin new puncheon bridge extend to meet existing

End existing

Puncheon bridge 18+95

Reference point

18+95 19+13 20 Extend existing puncheon bridge no handrail

19+13 19+77 64 log crib/stepped log crib

19+77 20+36 59 Install new puncheon bridge

Cave Reference point

20+53 21+05 52 Install Log retainer on side of trail only

Bridge 4 21+15 Reference point end of handrail at trail instersection 21+90

Reference point

22+37 22+72 35 Install New boardwalk

22+72 23+12 1 Construct new trail to connect boardwalk to old trail.

Totals 105 108 35 1 72

RR_Loop_Trail_Repair-Sht_1
RR_Loop_Trail_Repair-Sht_2
RR_Loop_Trail_Repair-Sht_3
RR_Loop_Trail_Repair-Sht_4
RR_Loop_Trail_Repair-Sht_5
RR_Loop_Trail_Repair-Sht_6
RR_Loop_Trail_Repair-Sht_7
RR_Loop_Trail_Repair-Sht_8
RR_Loop_Trail_Repair-Sht_9
RR_Loop_Trail_Repair-Sht_10
RR_Loop_Trail_Repair-Sht_11

File details come from the government source that posted it. Updated .