Brush_Hollow_Roads_Sign Plan.pdf
PDF 15 KB Posted
- Solicitation number
- AG-4419-S-10-0355
About this file
Sign Plan
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIM-0919-8R-413-0919-05
(ANF DEFERRED ROAD MTCE & WATERSHED HEALTH II -
Brush Hollow Roads:
FR185, 185A, 239, 302, 302A, 302B, 304, 369, 497, 497A, 497B, 497C)
SPS – Sign Plan
• All signs must meet MUTCD standards
• The location for these signs will be field located by the Engineer.
Road # Sign # Description
FR 185 1 HEAVY TRUCK TRAFFIC (24” x 24” minimum)
(2 required, one at each end of FR 185 project area)
FR 185 2 WORK AREA AHEAD (24” x 24” minimum)
FR 185 3&4 AMERICAN RECOVERY AND REINVESTMENT
ACT (42” x 27”) and PUTTING AMERICA TO
WORK (42” x 9”) on two 10’ metal posts
FR 302 1 HEAVY TRUCK TRAFFIC (24” x 24” minimum)
(1 required, at beginning of FR 302)
FR 302 2 WORK AREA AHEAD (24” x 24” minimum)
FR 302 3&4 AMERICAN RECOVERY AND REINVESTMENT
FR 497 1 HEAVY TRUCK TRAFFIC (24” x 24” minimum)
(1 required, at beginning of FR 497)
FR 497 2 WORK AREA AHEAD (24” x 24” minimum)
FR 497 3&4 AMERICAN RECOVERY AND REINVESTMENT
File details come from the government source that posted it. Updated .