Amendment to Specifications.doc
DOC document 94 KB Posted
- Solicitation number
- AG-4419-S-10-0351
About this file
Amendment to Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PreBid Meeting Notes Q A.doc | DOC document | |
| SF 30.Amendment 1.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Attachment 1 - Specifications.pdf | ||
| Section A - SF1442.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section B - Schedule of items.pdf | ||
| Exhibit 1 - Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Badin Lake Group Camp / Woodrun Vault Toilet Amendment Language Solicitation AG-4199-S-10-0351 Sheet 8 of 10
Add the following to the Wall Finish for the Restrooms:
“EXCEPTION: For the existing exterior wall that rock veneer is removed, smooth damaged CMU by applying Thoroseal Plaster Mix (or equal) to create an undamaged, uniform, flat surface. Finish with 2 coats of Devflex Paint. Block filler is not required.”
Sheet 9 of 10
Revise the toilet building and island information in accordance with the following sketch.
� EMBED AcroExch.Document.7 ���
_1333181480.pdf
File details come from the government source that posted it. Updated .