J1 - Specifications.pdf
PDF 20 MB Posted
- Solicitation number
- AG-4419-S-10-0326
About this file
J1 - Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.doc | DOC document | |
| J5 - Wage Determinations.docx | DOCX document | |
| J3 - Manistee overview map.pdf | ||
| SF-33 Contractor to Complete and Return.rtf | RTF text file | |
| AG-4419-S-10-0326.rtf | RTF text file | |
| J2 - Huron overview map.pdf | ||
| J4 Location Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIM-0900-1F-100-0904-01 Huron-Manistee National Forests Dam Maintenance Service Contract
SECTION C – HURON-MANISTEE NATIONAL FORESTS DAM MAINTENANCE SERVICE
CONTRACT SPECIFICATIONS
Description Page
Section 01010 Scope of Work 3
Section 01019 General Notes 5
Section 01030 Measurement and Payment 6
Section 01060 Regulatory Requirements 6
Section 01070 Abbreviations and Symbols 7
Section 01340 Shop Drawings, Product Data, Samples & All Other Submittals 8
Section 01530 Barriers and Enclosures 9
Section 02000 Specific Dam Maintenance Details 10
Section 02000-2.01 Minnie Lake Dam 11
Section 02000-2.02 Mitchell Creek Dam 14
Section 02000-2.03 Brandy Brook Dam 17
Section 02000-2.04 Olga Lake Dam 19
Section 02000-2.05 Linkes Dam 21
Section 02000-2.06 Lower Wakeley Lake Dam 24
Section 02000-2.07 Wakeley Lake Dam 25
Section 02000-2.08 Buck Creek Dam 28
Section 02000-2.09 Tuttle Marsh Dam 30
Section 02000-2.10 Shagpoke Dam 32
Section 02000-2.11 McGillis Dam 34
Section 02000-2.12 Foote Dam 35
Section 02000-2.13 Dahms Dam 37
Section 02000-2.14 Nowhere Dam 39
Section 02000-2.15 Otter Dam 41
Description Page
Section 02000-2.16 Big Gulch Dam 43
Section 02000-2.17 Outlaw Dam 46
Section 02000-2.18 Ketchikan Dam 47
Section 02000-2.19 Caddo Dam 49
Section 02000-2.20 Deer River Dam 51
Section 02000-2.21 Cattail Dam 53
Section 02000-2.22 Sprinkler Lake Dam 55
SECTION 01010 - SCOPE OF WORK
PART 1 GENERAL
1.01 SUMMARY
A. Description of Work:
1. Work Covered by Contract Documents:
a. Provide for and furnish all labor, superintendence, materials, tools, equipment, transportation, permits (if needed), certificates, insurance, temporary protection, and other items designated under provisions of this contract necessary to perform maintenance on the Huron-Manistee National Forests’ dams and associated structures located in the State of Michigan, as outlined in the contract specifications and indicated on the Schedule of Items.
Maintenance items are described in general as follows, with specific detail further listed in the specifications for each dam.
b. Mowing – mow the existing dam profile including 15’ past the toe of the dam on the downstream side and to the existing water line on the upstream side to a height of no more than 3”. Any woody material over 1” diameter x 24” long deposited on dams (from high water events, trees blown over, etc.) shall be removed and/or chipped in order to allow for normal mowing operations.
c. Brushing and tree removal – remove brush and trees on the original dam profile including 15’ past the toe of the dam on the downstream side and to the existing water line on the upstream side. Trees larger than 3” DBH shall have their stumps removed and the resulting void filled and compacted with suitable soil, topsoiled, seeded and mulched. All woody material to be removed shall be chipped on site with chips dispersed on site (as directed by the COR) but no chips will be allowed to be dispersed on the dam profile, in water, within 30’ of the water or on the access roads unless directed by the
COR.
d. Remove access road obstacles – as required, remove fallen trees, stumps, etc. that have fallen into the access road to the dams. These materials can be deposited no closer than 5’ from the edge of the cleared road edge or the outside existing ditch line (if present), whichever is greater. Minor shaping of the road profile may occur to remove major ruts, soil erosion , etc. and to make the Contractor’s access to the dam possible. Any access road damage caused by the Contractor shall be repaired to CORs satisfaction.
e. Leveling and reshaping – using heavy equipment such as a bulldozer/skid steer to relevel the top of the earthen dam or to spread new soil material along the dam profile to re-establish the dam’s original shape on an as-needed basis.
f. Turf establishment – placement of topsoil, fertilizer, seed and mulch to re-establish vegetation on the dam profile as needed.
g. Rip-rap – placement of crushed rock (not concrete) measuring in size from 6” – 18” in size unless otherwise specified to reduce erosion in the dam profile, spillway, embankment, etc.
h. Spillway repairs – replacement of wood stop logs, culvert protection devices, minor concrete repair and other miscellaneous minor repairs to spillways, culverts, whistle tubes, walkways and as maintenance needs arise.
END OF SECTION 01010
01019 – GENERAL NOTES
PART 1 - GENERAL
A. Contractor shall notify the COR immediately of slumps, erosion, water leaking out of the face of the dam, or other defects found on the dam or adjoining area.
B. Fuel storage in bulk stationary containers will not be allowed. Fuel deliveries in Contractor owned equipment will be allowed in slip-on truck mounted tanks with less than 250 gallon capacity. Delivery by State of Michigan licenesed fuel transportation companies will be allowed in excess of 250 gallons. The Contractor will keep 20+ fuel absorption pads, 100 pounds of fuel absorption material such as Oil Dry and a 55 gallon metal sealable barrel to use as a spill containment system on site during operations. In no circumstance will refueling take place within 50’ of any surface water.
C. Trails that cross the tops of dams will remain open during mowing or other maintenance activities. Contractor to provide all necessary temporary signage to safely control traffic.
D. Any damage to USFS facilities, vegetation, or property caused by the Contractor that is outside the work area or is considered non-necessary for the prosecution of work at hand will be repaired at no cost to the Government.
This includes damage to trees adjacent to dams, spillways, access roads, or drainages not marked for removal. If trees are damaged they will be painted with tree wound dressing as required by the COR. The Contractor will be charged up to $500.00 for each damaged tree.
E. In times of extreme fire danger where activities will increase the likelihood of ignition, a stop work order may be issued. If the suspension is over seven calendar days, remobilization may be paid if the equipment is removed from the site to a location off Forest in order to complete non-federal work elsewhere.
F. Contractors shall not go around gates or other closure devices. Gates shall be opened up to gain access to each dam by the COR. If another type of closure device, such as barrier posts, rocks, etc. are moved to gain access they shall be replaced when work is completed and shall be considered incidental to the work.
G. Costs for mobilization and moves between job locations will be considered incidental to the ordered work, therefore the contractor must consider this in the pricing.
H. All equipment shall be washed and be free of mud, seeds and weeds prior to leaving each project site. If machinery is taken off FS land for other use it shall be washed and inspected again prior to arriving on the next FS dam site.
Parts 2 and 3 - Not Applicable.
END OF SECTION 01019
01030 - MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.01 Measurement and Payment
The quantities to be measured shall be the items as shown on the SCHEDULE OF ITEMS completed in place and operational. All other work and materials shall be considered incidental to and included in the payment of the pay items in the SCHEDULE OF ITEMS.
1.02 Payment
The quantities shall be paid for as lump sum quantities or by other methods of measure as listed in the SCHEDULE OF ITEMS. Such payment shall be considered full compensation for the complete line item in accordance with the plans and specifications. Pay requests may be made every 30 days. Line items of LS can be requested for payment once the entire line item is 100% completed, inspected and approved by the CO/COR.
Parts 2 and 3 - Not Applicable.
END OF SECTION 01030
SECTION 01060 - REGULATORY REQUIREMENTS
1.01 SUMMARY
A. Section includes: Obligations for compliance with specific codes, ordinances, and regulations for this Contract.
1.02 QUALITY ASSURANCE
A. Regulatory Requirements:
1. The following codes, ordinances, and regulations are applicable to this project:
a. USDA Health and Safety Code Handbook FSH 6709.11.
b. OSHA Safety and Health Standards.
c. When conflicts occur, the more protective code, ordinance, or regulation shall govern.
END OF SECTION 01060
SECTION 01070 - ABBREVIATIONS AND SYMBOLS
1.01 SUMMARY
A. Section includes: Abbreviations used in the Contract Specifications.
1.02 REFERENCES
A. Abbreviations:
1. The following abbreviations are used in the Contract Specifications:
ASTM American Society for Testing and Materials
CIP Compacted In Place
CMP Corrugated Metal Pipe
CO Contracting Officer
COR Contracting Officer's Representative
DBH Diameter at Breast Height
FR Forest Road
FS Forest Service
LS Lump Sum
OSHA Occupational Safety and Health Administration, United States Department of Labor
USDA United States Department of Agriculture
END OF SECTION 01070
SECTION 01340 - SHOP DRAWINGS, PRODUCT DATA, SAMPLES & ALL
OTHER SUBMITTALS
PART 1 GENERAL
1.01 SUMMARY
A. Section includes: Requirements for submitting all submittals.
1.02 SUBMITTALS
A. Submittals:
1. Requirements:
a. "Or Equal" and " Alternate" Submittals:
1) The Government may determine that items varying from the products specified require a different selection of related materials. It is the intent of the Government to use the exact specified materials as listed in the specifications.
a) The Government will determine the changes needed in addition to those proposed by the Contractor.
b) All material changes proposed by the Contractor shall be at no additional cost to the Government.
2) Selection or approval action will not be started on "Or Equal" submittals until the Government receives all requested information on all the material involved.
a) Provide technical information on the product for the proposed use and the Material Safety Data Sheets.
3) The following is a list of submittals and product data the Contractor must submit prior to start of work. Two copies of each submittal must be submitted to the COR using ENG Form 4025 which the COR will provide to the Contractor before the Pre-work meeting.
a) Schedule of Work.
b) List of Contact Emergency Numbers specific to that county in which work is being conducted and of the contractor’s work force.
c) Shop drawings for all metal fabrication.
d) Weight tickets for all emankment, topsoil and rip-rap material (as they arrive at the job site).
e) Seed and fertilizer certificates of compliance
f) Spill prevention/spill response plan
g) Fire prevention plan
END OF SECTION 01340
SECTION 01530 - BARRIERS AND ENCLOSURES
1.01 SUMMARY
A. Section includes: Requirements for temporary barricades, fences, and tree and plant protection.
PART 2 EXECUTION
2.01 PREPARATION
A. Protection:
1. Temporary Barricades, Fences, Signs and Tree/Plant Protection: Provide and install temporary barricades, fences, signs, and tree/plant protection necessary during construction at the jobsite. A barrier (i.e. snow fence) shall be constructed around the work area to protect the public when needed. The COR will have the ultimate authority to tell the Contractor when a barrier is needed, even if the Contractor does not feel it needs to install a barrier.
B. Access Roads to the Jobsites:
1. See attached maps and directions to the dams.
C. On site storage:
1. COR will coordinate with the Contractor for adequate storage of equipment and materials as close to the dam as possible.
END OF SECTION 01530
SECTION 02000 - SPECIFIC DAM MAINTENANCE DETAILS
1.01 SUMMARY
A. Section includes: Specific maintenance items needing to be completed for each of the 22 dams. Pictures, quantities and directions to each dam are also provided in this section.
B. Distinction between left and right on the dam is taken from the center of the dam looking downstream.
C. Mowing dimensions include sideslopes and the crest. Mow the original dam profile including 15’ past the toe of the dam on the downstream side and to the existing water line on the upstream side to a height of no more than 3”. Any large woody material deposited on dams (from high water events, trees blown over, etc.) shall be removed and/or chipped in order to allow for normal mowing operations.
D. Brushing and tree removal – remove brush and trees on the existing dam profile including 15’ past the toe of the dam on the downstream side and to the existing water line on the upstream side. Trees larger than 3” DBH shall have their stumps removed and the resulting void filled and compacted with suitable soil, topsoiled and turf established. All woody material shall be chipped and dispersed on site. No chips will be allowed to be dispersed on the dam profile in or within 30’ of the water or on the access roads unless directed by the COR.
E. Remove access road obstacles – as required, remove fallen trees, stumps, etc. that have fallen into the access road to the dams. These materials can be deposited no closer than 5’ from the edge of the cleared road edge or the outside existing ditch line (if present), whichever is greater. Minor shaping of the road profile may occur to remove major ruts, soil erosion , etc. and to make the Contractor’s access to the dam possible. Any access road damage caused by the Contractor shall be repaired to CORs satisfaction.
F. Leveling and reshaping – using heavy equipment such as a bulldozer/skid steer to relevel the top of the earthen dam or to spread new soil material along the dam profile to re-establish the dam’s original shape on an as-needed basis.
G. Turf establishment – placement of topsoil, fertilizer, seed and mulch to re-establish vegetation on the dam profile as needed. Topsoil shall be spread 4” thick CIP.
Fertilizer shall be 12-12-12 and spread at a rate of 4 pounds/1000 square feet and raked into the topsoil prior to seeding. Seed shall be perennial rye spread with a hand spreader at a rate of 4 pounds/1000 square feet. Spreading by hand is not permitted. Mulch shall be weed free straw and spread at a rate of 1-1/2 bales (bales weighing 50 pounds dry weight each) per 1000 square feet. Straw shall form a continuous blanket at least 1-1/2” thick over all new turf establishment areas.
H. Rip-rap – placement of crushed rock (not concrete) measuring in size from 6” – 18” in size, unless otherwise specified, to reduce erosion in the dam profile, spillway, embankment, etc. Placement of woven geotextile fabric equal to Mirafi 500X (woven, 1% open area, permeability 0.01cm/sec) will be placed under all rip-rap unless specified as not required. Overlaps of geotextile shall be 2’ minimum.
I. Spillway repairs – replacement of wood stop logs, culvert protection devices, minor concrete repair and other miscellaneous minor repairs to spillways, culverts, whistle tubes, walkways and as maintenance needs arise.
PART 2 EXECUTION
2.01 Minnie Lake Dam (Infra #48136), T14N, R13W, Section 5, Newaygo County, Latitude N43.6278276, Longitude W85.8990860 (See map for more information.)
This dam is a historical dam built by the CCC in the 1930s. Care must be taken not to damage any existing structure and the following work must follow the specifications in the strictest manner.
Mow entire dam, measuring approximately 160’ x115’ (to the existing tree line) on the left side of the dam and 225’x65’ on the right side of the dam equaling approximately 0.75 acres.
Access to the left side of the dam will entail the contractor to move and replace at least one boulder weighing approximately 2000 pounds.
Perform brush and tree removal in all areas where mowing will occur. Tree removal consists of 5 small trees (do not remove stumps, but flush cut).
Place a total of 50 cubic yards of 24”x24” crushed stone rip-rap in the existing wood cribs and banks located on the upstream side of the spillway. Place a total of 5 cubic yards rip-rap on the downstream wingwall terminations. Place a total of 2 cubic yards rip-rap on the downstream wingwall sides. COR will be on site to indicated areas of placement. Geotextile fabric is not required.
Place 10 cubic yards of topsoil on the crest of the dam on the right side of the spillway and perform turf establishment.
Remove from FS property the old log steps at the canoe launch, place 30 cubic yards of clean 2NS sand CIP and then place 20 cubic yards of topsoil and perform turf establishment. Grade to match exsiting dam profile.
Upstream face of Minnie Dam, typical mowing and brushing.
Downstream face of Minnie Dam, typical mowing and brushing.
Right upstream wing wall of spillway showing area of needed rip-rap.
Left upstream wing wall of spillway showing area of needed rip-rap.
Overview of Minnie Dam and location of 10 yards topsoil.
Canoe launch needing to be removed, filled and turf establishment.
2.02 Mitchell Creek Dam (Infra #48631), T21N, R10W, Section 9, Wexford County, Latitude N44.234444, Longitude W85.5324444 (See map for more information.)
Mow entire dam, measuring approximately 400’ x 50’ equaling approximately 0.46 acres.
Perform brush and tree removal in all areas where mowing will occur. Tree removal includes 5 trees 8”-12” DBH.
Place 20 cubic yards CIP of 2NS material at outlet pipe after clearing and grubbing all vegetation. Place a total of 10 cubic yards rip-rap around the outlet pipe.
Place a total of 5 cubic yards rip-rap around the inlet riser structure.
Place 50 cubic yards of topsoil on the crest in low areas and relevel the crest to restablish a uniform level grade. COR will establish the elevation.
Remove access road obstacles and brush the entire access road in accordance with Brushing and Tree Removal specifications. Road length is 400’ and the width of the clearing dimension shall be 14 feet.
Provide eight (8) new 4”x6”x54”+/- stop logs. Stop logs shall be 4”x6” treated Southern Yellow Pine to a minimum treatment of UC4A, notched only as necessary on the ends to allow easy installation in channel guides and shall have 2 each #6 rebar 12” long driven and centered through the stop log 6” from each end to allow for stop log removal. Predrill holes ½” diameter for rebar.
Provide a new riser lid for the water control structure. The existing water control structure is 54” diameter CMP. The new lid shall be 1.5” deep galvanized grating capable of supporting a concentrated load of 400 pounds in the center of the lid, be hinged to allow the lid to be opened 180 degrees in order to remove the stop logs. The stationary portion of the lid shall be securely bolted to the CMP using a minimum of 4 each ¾” diameter galvanized bolts. The entire outside edge of the grating shall be covered with a galvanized L 2x2x1/4”. A locking device similar to the one currently installed shall be furnished using all galvanized steel.
Contractor to provide shop drawings prior to any fabrication as per Section 01340. See photograph of existing lid for Sprinkler Lake Dam paragraph 2.22 this section for an example of what is required.
Access road to Mitchell Creek Dam
Typical brushing/mowing at toe of dam
Existing water control structure lid to be replaced.
2.03 Brandy Brook Dam (Infra #48633), T22N, R10W, Section 33, Wexford County, Latitude N44.2587777, Longitude W85.5243888 (See map for more information.)
Mow entire dam, which is both sides of existing FR9770, 300’ in length x 36’ in width equaling
0.25 acres.
Perform brush and tree removal in all areas where mowing will occur.
Place a total of 20 cubic yards of topsoil on the reservoir side of the dam in various locations and perform turf establishment.
Place a total of 20 cubic yards of topsoil around the outlet pipe, after clearing and grubbing all vegetation, and perform turf establishment. Place a total of 5 cubic yards rip-rap around the outlet pipe.
Place a total of 3 cubic yards of rip-rap around the inlet riser structure.
Dig out the overflow inlets and outlets and add 3 cubic yards of rip-rap at the inlets.
Provide eight (8) new 4”x6”x36”+/- stop logs. Stop logs shall be 4”x6” treated Southern Yellow Pine to a minimum treatment of UC4A, notched only as necessary on the ends to allow easy installation in channel guides and shall have 2 each #6 rebar 12” long driven and centered through the stop log 6” from each end to allow for stop log removal. Predrill holes ½” diameter for rebar.
Brandy Brook Dam showing mowing and brushing requirements (both sides of road).
Brandy Brook Dam inlet structure.
Overflow inlets to be dug out and rip-rap added.
2.04 Olga Lake Dam (Infra #48634), T20N, R11W, Section 1, Lake County, Latitude N44.1574722, Longitude W85.5688611 (See map for more information.)
This dam is a historical dam built by the CCC in the 1930s. Care must be taken not to damage any existing structure and the following work must follow the specifications in the strictest manner.
Mow entire dam, measuring approximately 360’ x 67’ equaling approximately 0.55 acres.
Access to the dam will entail the contractor to move and replace at least one boulder weighing approximately 2000 pounds.
Perform brush and tree removal in all areas where mowing will occur. Tree removal includes 2 trees 6”+/- DBH (do not remove stumps, but flush cut). Downstream brushing shall only extend 10’ from the toe of the dam.
Place a total of 3 cubic yards of rip-rap around the water control structure riser. Geotextile fabric is not required.
Place a total of 3 cubic yards of rip-rap around the outlet pipe and rearrange existing rip-rap as needed to provide a neat appearance. Geotextile fabric is not required.
Provide twenty two (22) new 4”x6”x36”+/- stop logs. Stop logs shall be 4”x6” treated Southern Yellow Pine to a minimum treatment of UC4A, notched only as necessary on the ends to allow easy installation in channel guides and shall have 2 each #6 rebar 12” long driven and centered through the stop log 6” from each end to allow for stop log removal. Predrill holes ½” diameter for rebar.
Typical mowing and brushing on Olga Lake Dam. Picture is of downstream side & crest.
Water control structure riser needing rip-rap.
Olga Lake Dam stop logs requiring replacement (typical of all stop log replacements).
2.05 Linkes Dam (Infra #48666), T21N, R15W, Section 30, Manistee County, Latitude N44.1883333, Longitude W86.1795277 (See map for more information.)
Access across the dam will be limited to small equipment due to the width of the dam and the dam having a wooden deck. Contractor shall ensure equipment will not damage the dam in any way.
Mow entire dam, measuring approximately 150’ x 40’ equaling approximately 0.14 acres. This is performing mowing operatons on 75’ each side of the dam centerline.
Access to the dam will entail the contractor to move and replace at least one small boulder weighing approximately 500 pounds. The access road has several large fallen trees, stumps, etc. These materials can be deposited no closer than 5’ from the edge of the cleared road edge on the downhill side of the road or the outside existing ditch line (if present), whichever is greater. Minor shaping of the road profile may occur to remove major ruts, soil erosion , etc.
and to make the Contractor’s access to the dam possible.
Perform brush and tree removal in all areas where mowing will occur.
Place 10 cubic yards of topsoil to various areas on the top of the dam to level it and fill any voids and perform turf establishment.
Place 10 cubic yards of new rip-rap to sparse areas on dam embankments, remove existing rip-rap from downstream channel and place it on dam embankments and rearrange existing rip-rap on banks and in front of the dam to cover existing geotextile and neoprene sheet.
Trim off neoprene sheet material on the face of the dam and cover this area with 3 cubic yards of new rip-rap.
Remove log debris in downstream channel and all wood debris on upstream and downstream faces of dam. Do not remove the wood piling remants located downstream of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Provide twelve (12) new 4”x6”x96”+/- stop logs. Stop logs shall be 4”x6” treated Southern Yellow Pine to a minimum treatment of UC4A, notched only as necessary on the ends to allow easy installation in channel guides and shall have 2 each #6 rebar 12” long driven and centered through the stop log 6” from each end to allow for stop log removal. Predrill holes ½” diameter for rebar.
Replace four (4) stop log sockets/guides with 4’ long galvanized steel channel C5x6.7 bolted to the existing 6x6 frame work. All hardware to be ¾” diameter x 4” long galvanized lag bolts with washers, spaced 12” o.c. and 6” from ends (total of 4 lag bolts per channel).
Linkes Dam downstream side showing rip-rap needs and dam structure.
Linkes Dam showing downstream channel work.
Linkes Dam showing typical mowing/brushing.
Linkes Dam upstream face showing rip-rap needs, stop log sockets, wood debris removal.
2.06 Lower Wakely Lake Dam (Infra #49688), T26N, R2W, Section 14, Crawford County, Latitude N44.6435000, Longitude W84.5146388 (See map for more information.)
Access to the dam is limited to 4x4 equipment and tracked equipment due to the access road having some wet areas. The contractor will be responsible to repair all road damage caused by their activities. An excavator or backhoe with extendable boom will be needed to remove silt material in front of the existing stop logs. The front face of the stop logs is 8.5’ from the top edge of the dam/concrete headwall. Contractor to keep equipment at least 5’ from the edge of the concrete structure.
Mow entire dam, measuring approximately 200’ x 50’ equaling approximately 0.23 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, pipe and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Provide six (6) new 4”x6”x52”+/- stop logs. Stop logs shall be 4”x6” treated Southern Yellow Pine to a minimum treatment of UC4A, notched only as necessary on the ends to allow easy installation in channel guides and shall have 2 each #6 rebar 12” long driven and centered through the stop log 6” from each end to allow for stop log removal. Predrill holes ½” diameter for rebar. Contractor is to remove all silt material in front of existing logs prior to removing the stop logs. Excavated material is to be placed in areas of slight settlement of dam as directed by the COR and fertilize, seed and mulch as per turf establishment requirement.
Lower Wakeley Lake Dam inlet.
Lower Wakeley Lake Dam typical mowing.
2.07 Wakeley Lake Dam (Infra #50045), T26N, R2W, Section 23, Crawford County, Latitude N44.6399722, Longitude W84.5122777 (See map for more information.)
Access to the dam is limited to 4x4 equipment and tracked equipment due to the access road having some wet areas. The contractor will be responsible to repair all access road damage caused by their activities. An excavator or backhoe with extendable boom will be needed to remove silt material in front of the existing stop logs. Contractor to keep equipment at least 5’ from the edge of the sheetpile. The Contractor will have to cross the existing spillway structure which is comprised of 2x8’s over L3x3+/- on 48” o.c. The width of the spillway structure is 6’+/-. It is suggested the Contractor provide adequate timbers to bridge the structure for access.
Mow entire dam, measuring approximately 565’ x 55’ equaling approximately 0.71 acres.
Perform brush and tree removal in all areas where mowing will occur. There are at least 12 white pines and 1 cherry tree to remove on the dam. There is one tree down on the NE end of the spillway that must be completely removed.
Remove all woody debris from inlet structure, spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Relevel and shape top of entire dam to an elevation so after turf establishment the dam crest will be equal to the top of the wood walkway over the spillway. If additional material is needed, a borrow area at the west end of the dam can be utilized. Contractor will have to remove and replace a small cedar post and rail fence for access.
Place 100 cubic yards of topsoil along top and sides of dam and perform turf establishment.
Contractor will not be able to use dumptrucks to access the dam. Track loaders/haulers shall be used.
Provide nine (9) new 4”x6”x62”+/- stop logs. Stop logs shall be 4”x6” treated Southern Yellow Pine to a minimum treatment of UC4A, notched only as necessary on the ends to allow easy installation in channel guides and shall have 2 each #6 rebar 12” long driven and centered through the stop log 6” from each end to allow for stop log removal. Predrill holes ½” diameter for rebar. Contractor is to remove all silt material in front of existing logs prior to removing the stop logs. Excavated material is to be placed in areas of slight settlement of dam as directed by the COR and fertilize, seed and mulch as per turf establishment requirement.
Remove and properly dispose of the entire wood deck structure over the spillway. Replace with new 2x8x16’ full length treated Southern Yellow Pine to a minimum treatment of UC3B.
The wood deck measures 5’-8” x 15’9” (+/-). Wood decking shall be securely fastened to the existing steel frame structure using galvanized ½” diameter carriage bolts, nuts washers, two bolts per board/steel bearing. Neatly trim all edges to provide a uniform, level, professional looking walkway deck.
Wakely Lake Dam spillway deck, mowing, tree removal, cedar fence.
Spillway debris to be removed, steel framing closeup.
Wakelely Lake Dam inlet, stop log location.
2.08 Buck Creek Dam (Infra #50354), T23N, R7E, Section 3, Iosco County, Latitude N44.4121111, Longitude W83.5730000 (See map for more information.)
Access to the dam is limited to 4x4 equipment and tracked equipment due to the access road is mainly the side of the lowered reservoir. The Contractor will be responsible to repair all access road damage caused by their activities.
Mow entire dam, measuring approximately 220’ x 70’ and the emergency spillway measuring approximately 180’ x 30’ equaling approximately 0.48 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR. It is the intent to place this material on the steep slope to the right of the dam to stop erosion.
Place 30 cubic yards of topsoil along top and sides of dam and perform turf establishment as directed by the COR. Contractor will not be able to use dumptrucks to access the dam. Track loaders/haulers may be used.
Place a total of 3 cubic yards rip-rap around the outlet pipe after clearing and grubbing all vegetation.
Place a total of 2 cubic yards rip-rap around the inlet structure after clearing and grubbing all vegetation.
Buck Creek Pond Dam overview.
Buck Creek Pond Dam outlet showing area of needed rip-rap.
Buck Creek Pond Dam inlet structure.
2.09 Tuttle Marsh Dam (Infra #50355), T23N, R8E, Section s 22, 27 & 28, Iosco County, Latitude N44.3682066, Longitude W83.4431227 (See map for more information.)
Mow entire dam, measuring approximately 12,400’ x 40’ equaling approximately 11.4 acres.
This includes, but is not limited to, all emergency spillways, mowing around existing signs, water control structures, fences and parking turnouts. Since Tuttle Marsh Dam parallels FR4546 , contractor shall erect proper signage at both ends of the road with 48”x48” “Road Work Ahead” signs. No woody debris shall be left on the road surface.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway and both faces of the dam.
Place 100 cubic yards of topsoil in areas of erosion, fill all burrows and perform turf establishment.
Place a total of 4 cubic yards rip-rap around the inlet structure after clearing and grubbing all
Tuttle Marsh Dam inlet showing woody debris, required rip-rap and mowing
Tuttle Marsh Dam typical overview
Tuttle Marsh Dam – numerous animal burrows to be filled
2.10 Shagpoke Dam (Infra #50680), T25N, R5E, Section 7, Alcona County, Latitude N44.5701236, W83.8833760 (See map for more information.)
Mow entire dam, measuring approximately 300’ x 80’ and to the existing tree line which is more than 15’ from the toe of the dam equaling a total of approximately 1.0 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Level the top of the dam and add soil from existing borrow area at the dam to rebury 50 feet x 3 feet+/- of exposed chain link fence near the control structure and at the outlet pipe. Bury depth shall be 6”. Perform turf establish in all disturbed areas.
Place a total of 2 cubic yards rip-rap around the outlet pipe after clearing and grubbing all vegetation.
Place a total of 2 cubic yards rip-rap around the inlet structure after clearing and grubbing all
Overview of Shagpoke Dam mowing and brushing.
Shagpoke Dam inlet – woody debris and needed rip-rap.
Shagpoke Dam typical chainlink fence needing burial.
2.11 McGillis Dam (Infra #50889), T26N, R7E, Section 30, Alcona County, Latitude N44.6174444, Longitude W83.6401111 (See map for more information.)
Mow entire dam, measuring approximately 200’ x 60’ equaling approximately 0.28 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Place 2 cubic yards of topsoil in various locations on the dam profile and perform turf establishment.
Place a total of 3 cubic yards rip-rap around the outlet pipe after clearing and grubbing all
McGillis Dam overview showing required mowing, brushing and tree removal.
McGillis Dam outlet pipe needing rip-rap.
2.12 Foote Dam (Infra #50890), T26N, R6E, Section 20, Alcona County, Latitude N44.6360555, Longitude W83.7420277 (See map for more information.)
Mow entire dam, measuring approximately 140’ x 120’ equaling approximately 0.39 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Remove access road obstacles and brush the entire access road in accordance with Brushing and Tree Removal specifications. Road length is approximately ¼ mile and the width of the clearing dimension shall be 14 feet.
Strip existing topsoil around overflow whistle tube as needed to excavate and remove the existing 36” polyethylene pipe and base which is 7 feet deep. Contractor to provide and place a new 36” diameter x 6 foot concrete one piece manhole with integral concrete base. No steps are to be provided. Provide a cut out in the 36” diameter concrete riser pipe for zero (as minimal as possible) sump to receive the existing 30” diameter corrugated polyethylene outlet pipe. Install existing 30” diameter pipe using new neoprene gaskets. Place and compact excavated material to within 6” of top of dam, fillling and compacting in 12” lifts evenly around the new concrete riser. Replace any removed chain link fence that was buried around the overflow whistle tube so it is buried below the topsoil or geotextile fabric. Reinstall 36” diameter trash rack. Replace stripped topsoil and perform turf establishment on all disturbed areas except where rip-rap is to be placed. Overflow whistle tube is located on the reservoir side of the dam on a 3:1 slope. This repair work must be made in the prescence of the COR.
Contractor to submit shop drawings of proposed manhole.
Place 2 cubic yards of rip-rap around the overflow whistle tube upon completion of overflow whistle tube repair.
Foote Dam mowing and brushing.
Foote Dam overflow riser
2.13 Dahms Dam (Infra #50891), T26N, R6E, Section 17, Alcona County, Latitude N44.6405833, Longitude W83.7370000 (See map for more information.)
Mow entire dam, measuring approximately 200’ x 75’ equaling approximately 0.34 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Place 10 cubic yards of topsoil in various locations on the dam profile and perform turf establishment.
Place a total of 3 cubic yards rip-rap around the overflow inlet and both outlets after clearing and grubbing all vegetation.
Excavate silt material along sides of 12” diameter inlet pipe that extends into the reservoir.
Excavate 5’ wide on each side of the pipe measured from edge of the pipe and 3’ below the pipe invert. Contractor to take extra precaution not to move or damage the inlet pipe. Pipe extends into the reservoir approximately 20’ from the edge of the reservoir/dam toe.
Excavated material is to be placed in areas of slight settlement of dam as directed by the COR and fertilize, seed and mulch as per turf establishment requirement. Contractor to replace 2x4x21”+/- treated wood board located at the top of the inlet pipe using 4 each ½” diameter x 4” lag bolts with washers. All hardware to be galvanized.
The access hatch to the water control structure needs to be removed, all rust and loose paint removed, and shall be repainted on all sides with two coats of flat black Rustoleum paint, or approved equal. The existing two hinges for the access hatch shall be removed and replaced with new hinges. The padlock hasp is to be removed and replaced with a new hasp of proper size for a standard FS padlock. All hardware to be galvanized.
Dahm’s Dam overview.
Dahms Dam overflow structure.
Dahms Dam inlet pipe to have silt material excavated and 2x4 replaced.
2.14 Nowhere Dam (Infra #50892), T26N, R6E, Section 17, Alcona County, Latitude N44.3682066, Longitude W83.4431226 (See map for more information.)
Mow entire dam, measuring approximately 200’ x 70’ equaling approximately 0.32 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Place a total of 3 cubic yards rip-rap around the overflow inlet structure after clearing and grubbing all vegetation.
The access hatch to the water control structure needs to be removed, all rust and loose paint removed, and shall be repainted on all sides with two coats of flat black Rustoleum paint, or approved equal. The existing two hinges for the access hatch shall be removed and replaced
Nowhere Dam typical mowing (picture taken 10/30/2009)
Overflow inlet structure needing rip-rap
Nowhere Dam’s water control structure access hatch
2.15 Otter Dam (Infra #50893), T25N, R5E, Section 19, Alcona County, Latitude N44.5406666, Longitude W83.8713611 (See map for more information.)
Mow entire dam, measuring approximately 125’ x 70’ equaling approximately 0.20 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Place a total of 2 cubic yards rip-rap around the outlet pipe after clearing and grubbing all vegetation. Geotextile fabric is not required.
Access road has an earthen berm at its entrance. Contractor to breach this berm and replace it to original condition after dam maintenance is complete.
The access hatch to the water control structure needs to be removed, all rust and loose paint removed, and shall be repainted on all sides with two coats of flat black Rustoleum paint, or approved equal. The existing two hinges for the access hatch shall be removed and replaced
Otter Dam overview for mowing and brushing.
Otter Dam access hatch.
2.16 Big Gulch Dam (Infra #50894), T25N, R5E, Section 7, Alcona County, Latitude N44.5747500, Longitude W83.8728611 (See map for more information.)
Mow entire dam, measuring approximately 200’ x 80’ equaling approximately 0.37 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway, emergency spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Remove access road obstacles and brush the entire access road in accordance with Brushing and Tree Removal specifications. Road length is approximately ¼ mile and the width of the clearing dimension shall be 14 feet.
Excavate outlet pipe which is buried with soil and woody debris. Material to be placed in borrow area next to dam as per COR direction.
The access hatch to the water control structure needs to be removed, all rust and loose paint removed, and shall be repainted on all sides with two coats of flat black Rustoleum paint, or approved equal. The existing two hinges for the access hatch shall be removed and replaced
Big Gulch Dam mowing and brushing.
Big Gulch Dam upstream face.
Big Gulch Dam debris in emergency spillway to remove.
Big Gulch Dam outlet pipe buried.
2.17 Outlaw Dam (Infra #50895), T25N, R5E, Section 18, Alcona County, Latitude N44.5533611, Longitude W83.8857222 (See map for more information.)
Mow entire dam, measuring approximately 200’ x 80’ equaling approximately 0.37 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Access road has some minor brushing to perform to allow easier Contractor access.
Remove silt and deposits at end of outlet pipe. Excavated material is to be placed in areas of slight settlement of dam as directed by the COR and fertilize, seed and mulch as per turf establishment requirement.
Outlaw Dam overview for mowing and brushing.
2.18 Ketchikan Dam (Infra #50896), T24N, R5E, Section 32, Iosco County, Latitude N44.4316741, Longitude W83.8604673 (See map for more information.)
Mow entire dam, measuring approximately 900’ x 60’ equaling approximately 1.24 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Place 2 cubic yards of topsoil in areas of erosion and perform turf establishment.
Place a total of 2 cubic yards rip-rap around the overflow inlet structure after clearing and grubbing all vegetation.
The access hatch to the water control structure needs to be removed, all rust and loose paint removed, and shall be repainted on all sides with two coats of flat black Rustoleum paint, or approved equal. The existing two hinges for the access hatch shall be removed and replaced
Ketchican Dam overview (pictures taken 11/5/2009)
Ketchican Dam overflow structure
Ketchican Dam typical erosion areas to be repaired
2.19 Caddo Dam (Infra #50897), T24N, R5E, Section 32, Iosco County, Latitude N44.4353023, Longitude W83.8625179 (See map for more information.)
Mow entire dam, measuring approximately 1400’ x 60’ equaling approximately 1.93 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Place 5 cubic yards of topsoil in areas of erosion, fill all burrows and perform turf establishment.
The access hatch to the water control structure needs to be removed, all rust and loose paint removed, and shall be repainted on all sides with two coats of flat black Rustoleum paint, or approved equal. The existing two hinges for the access hatch shall be removed and replaced
Caddo Dam typical section of required mowing and brushing/tree removal
Caddo Dam woody debris to be removed, burrow filled and dam shaped
2.20 Deer River Dam (Infra #50898), T24N, R5E, Section 29, Iosco County, Latitude N44.4368708, Longitude W83.8623884 (See map for more information.)
Mow entire dam, measuring approximately 500’ x 80’ equaling approximately 0.92 acres.
These dimensions includes the emergency spillway.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway, emergency spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Place 5 cubic yards of topsoil in areas of erosion, fill all burrows and perform turf establishment.
The access hatch to the water control structure needs to be removed, all rust and loose paint removed, and shall be repainted on all sides with two coats of flat black Rustoleum paint, or approved equal. The existing two hinges for the access hatch shall be removed and replaced
Deer River Dam overview
Deer River Dam typical woody debris to be removed.
Deer River Dam access cover to be painted,
2.21 Cattail Dam (Infra #50899), T26N, R7E, Section 29, Alcona County, Latitude N44.6156426, Longitude W83.6207172 (See map for more information.)
Mow entire dam, measuring approximately 250’ x 50’ for the northern dam and measuring approximately 200’ x 50’ for the southern dike equaling a total of approximately 0.52 acres.
These dimensions includes the emergency spillway at the southern dike.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway, emergency spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Place 5 cubic yards of topsoil in areas of erosion, fill all burrows and perform turf establishment.
The access hatch to the water control structure needs to be removed, all rust and loose paint removed, and shall be repainted on all sides with two coats of flat black Rustoleum paint, or approved equal. The existing two hinges for the access hatch shall be removed and replaced
Cattail Dam overview, typical of both north and south dams
Cattail Dam – south dike – note trees to be removed on toe of dam
2.22 Sprinkler Lake Dam (Infra #51262), T26N, R7E, Section 32, Alcona County, Latitude N44.6054167, Longitude W83.6075000 (See map for more information.)
Mow entire dam, measuring approximately 200’ x 30’ for the northern dam and measuring approximately 100’ x 30’ for the southern dam equaling a total of approximately 0.20 acres.
Perform brush and tree removal in all areas where mowing will occur.
Remove all woody debris from inlet structure, spillway, emergency spillway and both faces of the dam. All wood log debris can be scattered in wooded areas as directed by the COR.
Place a total of 3 cubic yards rip-rap around the outlet pipe of the southern dam after clearing and grubbing all vegetation.
Place 10 cubic yards of topsoil in areas of erosion, fill all burrows and perform turf establishment.
The existing water control structure is 42” diameter CMP. The existing aluminum riser lid for the water control structure shall be modified so it is hinged to allow the lid to be opened 180 degrees in order to remove the stop logs. The stationary portion of the lid shall remain securely bolted to the CMP using the existing system. A locking device shall be furnished using all aluminum material and shall be of suitable size to securely fasten the lid to prevent prying and shall accept a standard FS padlock. Contractor to provide shop drawings prior to any fabrication as per Section 01340.
Sprinkler Lake Dam overview – mowing and turf establishment requried, typ.
Sprinkler Lake Dam riser lid to be modified
Sprinkler Lake Dam outlet
End of Section 02000