Questions & Answer

AG4419-S-10-0313 Dukes Lower Peninsula Udell Experimental Forest Road Project

Location maps:

Questions: Are we to assume that all the work is being performed inside the cross-hatched areas?

Answer: Yes, all work is within the cross hatched areas as indicated on the maps.

Questions: Is there a color coded key for the maps so we can tell which roads are proposed for work and what type of work will happen at each location?

Answer: The specific project locations have not been identified at this time. Public scoping and NEPA needs to be performed for the specific project sites before the information can be made public. The unit prices are set up so allow for "Actual Quantity" so a specific project bid is not necessary.

Questions: Are the sites accessible, meaning are any of them gated where only FS personnel can allow us access?

Answer: All project sites are currently accessable, although some are "user created" roadways which experience unauthorized traffic. Specific project locations are not being identified at this time, however.

Question: Wage decision:

For the Operators and Laborers is this considered an Open Cut or Airport, Bridge and Highway

Construction project?

Answer: This is considered an Airport, Bridge, and Highway construction project for wage rate purposes