Shoal Creek schedule of items.pdf
PDF 7 KB Posted
- Solicitation number
- AG-4419-S-10-0199
About this file
Pricing Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ARRA Shoal Creek Culvert Bridge Mtce Specs_SERVICE.doc | DOC document | |
| 6b-CIM-0801-33R Maps.pdf | ||
| 52.212-5 ARRA.docx | DOCX document | |
| 02-0147_sca.txt | TXT text file | |
| CIM-0801-33R Drawings.pdf | ||
| 7-Eval Criteria.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: Shoal Creek Bridge & Major Culvert Maintenance Document: Schedule of Items
ITEM DESCRIPTION MOM Unit Quantity Unit Price Total
20202 Selective clearing and grubbing* CQ Acre 3.18 30306 Aggregate Surfacing Reconditioning CQ LS 5 61703 Guradrail posts AQ Each 5 63303A Signs,W5-3, One Lane Bridge (36"x36') AQ Each 30 63303B Signs,W5-2, Narrow Bridge (36"x36') AQ Each 4 63303C Signs,Impassable at High Water (36"x36') AQ Each 4 63303D Signs, W11-2, (36"x36') AQ Each 2 63306A Object markers, OM-3L AQ Each 34 63306B Object markers, OM-3R AQ Each 34 60703 Cleaning and litter removal CQ LS 7
Total $
Notes: Mobilization, Temporary Traffic Control, Aggregate are considered incidental to Pay Items and no additional payment will be made. Contractor is responsible for providing all labor, materials, equipment , and hardward necessary to remove and replace signs in accordance the Specifications and no additional payment will be made.
File details come from the government source that posted it. Updated .