ARRA Shoal Creek Culvert Bridge Mtce Specs_SERVICE.doc
DOC document 138 KB Posted
- Solicitation number
- AG-4419-S-10-0199
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6b-CIM-0801-33R Maps.pdf | ||
| 52.212-5 ARRA.docx | DOCX document | |
| Shoal Creek schedule of items.pdf | ||
| 02-0147_sca.txt | TXT text file | |
| CIM-0801-33R Drawings.pdf | ||
| 7-Eval Criteria.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Specifications
National Forests in Alabama
Shoal Creek Bridge and Major Culvert Maintenance Project September 2009 Table of Contents
0Project Specifications
Table of Contents 101 - Terms, Format, and Definitions
101.04 Definitions.
103 - Scope of Work 104 - Control of Work
104.01 Use of Roads by Contractor
105 - Control of Material 106 - Acceptance of Work
106.01 Conformity with Contract Requirements.
107 - Legal Relations and Responsibility To the Public 109-Measurement and Payment 151 - Mobilization 156 - Public Traffic 202 – Additional Clearing & Grubbing: Existing Drainage Structures
202.01 Description.
202.02 General.
202.03 Acceptance.
202.04 Measurement.
202.05 Payment.
303 - Road Reconditioning
303.01 Work.
303.02 Aggregate Surface Reconditioning.
303.04 Measurement.
303.05 Payment.
607 - Cleaning Existing Drainage Structures 617 - Guardrail
617.04 Measurement.
617.05 Payment.
633 - Permanent Traffic Control
633.03 General.
633.04 Supports.
633.05 Panels.
633.06 Measurement.
633.07 Payment.
635 - Temporary Traffic Control
635.01 General.
703 - Aggregate
101 - Terms, Format, and Definitions
101.04 Definitions.
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of items, quantities, units of measure, unit price, and amount.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
103 - Scope of Work
103.01 Intent of Contract.
The intent of the contract is to provide for the completion of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
104 - Control of Work
104.01 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.01 Source of Supply and Quality Requirements. Follow the requirements of FAR Clause 52.236-5 Material and Workmanship.
Select sources and provide acceptable material. Notify the CO of all proposed sources before delivery to the project to expedite material inspection and testing. Do not incorporate material requiring submittal into the work until approved.
Material may be approved at the source of supply before delivery to the project. Approval does not constitute acceptance. If an approved source does not continue to supply acceptable material during the life of the project, further use of that source may be denied.
105.02 Material Sources.
(a) Government-provided sources.
There are no Government-provided sources for this project.
(b) Contractor-located sources. The Contractor is responsible for located sources, including established commercial sources. Use sources that fulfill the contract quantity and quality requirements. Determine the quantity and types of equipment and work necessary to select and produce acceptable material. Secure all permits and clearances for use of the source and provide copies of the documents.
Provide laboratory test reports and available historical performance data indicating that acceptable material is available from the source. Do not use material from a source that is unacceptable to the Government. Dispose of unacceptable material and locate another source at no cost to the Government.
105.03 Storing and Handling Material. Store and handle material to preserve its quality and fitness for the work. Stored material approved before storage may again be inspected before use in the work. Locate stored material to facilitate prompt inspection.
Use only approved portions of the right-of-way for storing material and placing plants and equipment. Provide all additional space needed. Do not use private property for storage without written permission of the owner or lessee. Furnish copies of all agreements. Restore all Government-provided storage sites to their original condition.
The Contractor is responsible for the security of all stored material.
106 - Acceptance of Work
106.01_nat_us_07_31_2007
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspection.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
107 - Legal Relations and Responsibility To the Public
107.01 Laws to be Observed. Follow the requirements of FAR Clause 52.236-7 Permits and Responsibilities.
Comply with all applicable laws, ordinances, safety codes, regulations, orders, and decrees. Protect and indemnify the Government and its representatives against any claim or liability arising from or based on the alleged violation of the same.
Comply with all permits and agreements obtained by the Government for performing the work that is included in the contract. Obtain all additional permits or agreements and modifications to Government-obtained permits or agreements that are required by the Contractor's methods of operation. Furnish copies of all permits and agreements.
107.02 Protection and Restoration of Property and Landscape. Follow the requirements of FAR Clause 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
Preserve public and private property, and protect monuments established for the purpose of perpetuating horizontal, vertical, cadastral, or boundary control. When necessary to destroy a monument, reestablish the monument according to applicable state statute or by the direction of the agency or individual who established the monument.
Do not disturb the area beyond the contract limits. Replace trees, shrubs, or vegetated areas damaged by operations as directed and at no cost to the Government. Remove any damaged limbs of existing trees by an approved arborist.
Do not excavate, remove, damage, alter, or deface any archeological or paleontological remains or specimens. Control the actions of employees and subcontractors on the project to ensure that protected sites are not disturbed or damaged. Should any of these items be encountered, suspend operations at the discovery site, notify the CO, and continue operations in other areas. The CO will inform the Contractor when operations may resume at the discovery site.
107.06 Contractor's Responsibility for Work. Assume responsibility for all work until final acceptance. This includes periods of suspended work. Protect the work against injury, loss, or damage from all causes whether arising from the execution or nonexecution of the work.
Maintain public traffic according to Section 156. Rebuild, repair, restore, and make good all losses, injuries, or damages to any portion of the work. This includes losses, injuries, or damages caused by vandalism, theft, accommodation of public traffic, and weather that occurs during the contract.
The Government will only be responsible for losses, injuries, and damages to work put in place that was caused by declared enemies and terrorists of the Government and cataclysmic natural phenomenon such as tornadoes, earthquakes, major floods, and other officially declared natural disasters. The Government will only be responsible for costs attributable to repairing or replacing damaged work. The Government will not be responsible for delay costs, impact costs, or extended overhead costs.
107.07 Furnishing Right-of-Way. The Government will obtain all right-of-way.
107.08 Sanitation, Health, and Safety. Follow the requirements of FAR Clause 52.236-13 Accident Prevention.
Observe rules and regulations of Federal, State, and local health officials. Do not permit any worker to work in surroundings or under conditions that are unsanitary, hazardous, or dangerous.
Admit any OSHA inspector or other legally responsible official involved in safety and health administration to the project work site upon presentation of proper credentials.
Report accidents on forms furnished by the Government or, with prior approval, on forms used to report accidents to other agencies or insurance carriers. Maintain a "Log of Work Related Injuries and Illnesses," OSHA Form 300, and make it available for inspection.
Install a reverse signal alarm audible above the surrounding noise level on all motorized vehicles having an obstructed view and on all earth-moving and compaction equipment.
107.10 Environmental Protection. Do not operate mechanized equipment or discharge or otherwise place any material within the wetted perimeter of any waters of the U.S. within the scope of the Clean Water Act (33 USC § 1251 et seq.). This includes wetlands unless authorized by a permit issued by the U.S. Army Corps of Engineers according to 33 USC § 1344, and, if required, by any State agency having jurisdiction over the discharge of material into the waters of the U.S. In the event of an unauthorized discharge:
(a) Immediately prevent further contamination;
(b) Immediately notify appropriate authorities; and
(c) Mitigate damages as required.
Comply with the terms and conditions of any permits that are issued for the performance of work within the wetted perimeter of the waters of the U.S.
Separate work areas, including material sources, by the use of a dike or other suitable barrier that prevents sediment, petroleum products, chemicals, or other liquid or solid material from entering the waters of the U.S. Use care in constructing and removing the barriers to avoid any discharge of material into, or the siltation of, the water. Remove and properly dispose of the sediment or other material collected by the barrier.
Repair leaks on equipment immediately. Do not use equipment that is leaking. Keep a supply of acceptable absorbent materials at the job site in the event of spills. Acceptable absorbent materials are those that are manufactured specifically for the containment and clean up of hazardous materials.
107.11 Protection of Forests, Parks, and Public Lands. Comply with all regulations of the State fire marshal, conservation commission, Forest Service, or other authority having jurisdiction governing the protection of land including or adjacent to the project.
Do not work within the wetted perimeter of streams before July 1 or after September 15.
Do not work within 1000 feet of an occupied dwelling on any legal holiday or between 12 noon Saturday and 6 a.m. the following Monday.
Do not work (except hauling material) within 1500 feet of osprey nests between March 1 and May 31. No known active nests were located within the 1500 feet limit as of June 15, 1991. If a new nest is found, suspend work (except hauling material) within 1500 feet of the nest location. See Subsection 108.06.
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
· Exact time and location of spill including a description of the area involved.
· Containment procedures.
· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
109-Measurement and Payment
109.01 Measurement of Work. Take and record measurements and perform calculations to determine pay quantities for invoicing for work performed. Take or convert all measurements of work according to United States customary measure.
Unless otherwise specified, measure when the work is in place, complete, and accepted. Measure the actual work performed, except do not measure work outside the design limits or other adjusted or specified limits (staked limits). Measure structures to the lines shown on the plans or to approved lines adjusted to fit field conditions.
Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the Section controlling the work being performed.
Remeasure quantities if it has been determined that any portion of the work is acceptable but has not been completed to the lines, grades, and dimensions shown on the plans or established by the CO.
Submit measurement notes to the CO within 24 hours of completing the work. For on-going work, submit measurement notes weekly. When work is not complete, identify the measurement as being an interim measurement. Submit the final measurement when the installation is completed. Measurement notes form the basis of the Government’s receiving report (see Subsection 109.08(d)). For lump sum items, submit documentation to support invoiced progress payment on a monthly basis.
Use an acceptable format for measurement records. As a minimum, include the following information in all records of measurement:
(a) Project name and number;
(b) Contract item number;
(c) Date the work was performed;
(d) Location of the work;
(e) Measured quantity;
(f) Calculations made to arrive at the quantity;
(g) Supporting sketch and details as needed to clearly define the work performed and the quantity measured;
(h) Names of persons measuring the work;
(i) Identification as to whether the measurement is interim or final; and
(j) Signed certification statement by the persons taking the measurements, performing the calculations, and submitting them for payment that the measurement and calculations are correct to the best of their knowledge and that the quantity being measured is subject to direct payment for the identified item under the contract.
109.02 Measurement Terms and Definitions. Unless otherwise specified, the following terms are defined as follows:
(a) Acre. 43,560 square feet. Make longitudinal and transverse measurements for area computations horizontally unless specified on the ground surface. Do not make deductions from the area computation for individual fixtures having an area of 500 square feet or less.
(b) Contract quantity. The quantity to be paid is the quantity shown in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity. If there is evidence that a quantity specified as a contract quantity is incorrect, submit calculations, drawings, or other evidence indicating why the quantity is in error and request, in writing, that the quantity be adjusted.
(d) Each. One entire unit. The quantity is the actual number of units completed and accepted.
109.04 Receiving Procedures. Provide load tickets or material certifications for all items needed in contract whether paid for directly or indirectly, See Section 109.05. During the placement, maintain a record of each delivery and document it in an acceptable manner. Include the following information as applicable:
(a) ADVANCE \r 0Project identification;
(b) Contract pay item number and description;
(c) Location where placed;
(d) Date;
(e) Mass, number, or volume; and
(f) installer's signature.
Use an approved format for the delivery record(s). Furnish the original record(s) and a written certification of the delivery of the material at the end of each shift.
109.05 Scope of Payment. Payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule.
(a) Direct payment. Payment is provided directly under a pay item shown in the bid schedule when one of the following applies:
(1) The work is measured in the Measurement Subsection of the Section ordering the work, and the bid schedule contains a pay item for the work from the Section ordering the work.
(2) The Measurement Subsection, of the Section ordering the work, references another Section for measuring the work and the bid schedule contains a pay item for the work from the referenced Section.
(b) Indirect payment. Work for which direct payment is not provided is a subsidiary obligation of the Contractor. Payment for such work is indirectly included under other pay items shown in the bid schedule. This includes instances when the Section ordering the work references another Section for performing the work and the work is not referenced in the Measurement Subsection of the Section ordering the work.
Compensation provided by the pay items included in the contract bid schedule is full payment for performing all contract work in a complete and acceptable manner. All risk, loss, damage, or expense arising out of the nature or prosecution of the work is included in the compensation provided by the contract pay items.
Work measured and paid for under one pay item will not be paid for under any other pay item.
The quantities shown in the bid schedule are approximate unless designated as a contract quantity. Limit pay quantities to the quantities staked, ordered, or otherwise authorized before performing the work. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. No payment will be made for work performed in excess of that staked, ordered, or otherwise authorized.
109.07 Eliminated Work. Follow the requirements of FAR Clause 52.243-4 Changes.
Work may be eliminated from the contract without invalidating the contract. The Contractor is entitled to compensation for all direct costs incurred before the date of elimination of work plus profit and overhead on the direct incurred costs. Anticipated profit and overhead expense on the eliminated work will not be compensated.
109.08 Progress Payments.
(a) General. Only invoice payments will be made under this contract. Invoice payments include progress payments made as work is accomplished and the final payment made upon final acceptance. Full or partial progress payment will be withheld until a schedule or schedule update is submitted to, and accepted by, the CO.
(b) Closing date and invoice submittal date. The closing date for progress payments will be designated by the CO. Include work performed after the closing date in the following month’s invoice. Submit invoices to the designated billing office.
(c) Invoice requirements. Submit the invoice to the Government’s designated billing office. Include the following items in the invoice:
(1) The information required in FAR Clause 52.232-27(a)(2)(i) through (a)(2)(xi).
(2) A tabulation of total quantities and unit prices of work accomplished or completed on each pay item as of the monthly closing date. Do not include any quantities unless field note documentation for those quantities was submitted by the closing date.
(3) The certification required by FAR Clause 52.232-5(c) and, if applicable, the notice required by FAR Clause 52.232-5(d). Provide an original signature on the certification. Facsimiles are not acceptable.
(4) If applicable, a copy of the notices that are required by FAR Clause 52.232‑27(e)(5) and (g).
(5) The amount included for work performed by each subcontractor under the contract.
(6) The total amount of each subcontract under the contract.
(7) The amounts previously paid to each subcontractor under the contract.
(8) Adjustments to the proposed total payment that relate to the quantity and quality of individual items of work. Adjustments for the following may be made by the Government after validation of the invoice:
(a) Retent resulting from a failure to maintain acceptable progress;
(b) Retent resulting from violations of the labor provisions;
(c) Retent pending completion of incomplete work, other "no pay" work, and verification of final quantities;
(d) Obligations to the Government such as excess testing cost or the cost of corrective work pursuant to FAR Clause 52.246-12(g); or
(e) Liquidated damages for failure to complete work on time.
(d) Processing progress payment requests. No payment will be made for work unless field note documentation for the work was provided by the closing date.
(1) Proper invoices. If the invoice meets the requirements of Subsection 109.08(c), and the quantities and unit prices shown on the Contractor’s invoice agree with the corresponding quantities and unit prices shown on the Government’s receiving report, the invoice will be paid.
(2) Defective invoices. If the invoice does not meet the requirements of Subsection 109.08(c), or if any of the quantities or unit prices shown on the Contractor’s invoice exceed the corresponding quantities and unit prices shown on the Government’s receiving report, the invoice is defective, and the Contractor will be notified according to FAR Clause 52.232-27(a)(2). Defective invoices will be returned to the Contractor within 7 days after receipt by the Government’s designated billing office. Correct and resubmit returned invoices. If the defects are minor, the Contractor may elect, in writing, to accept the quantities and unit prices shown on the Government’s receiving report for payment.
(e) Partial payments. Progress payments may include partial payment for material to be incorporated in the work, provided the material meets the requirements of the contract and is delivered on, or in the vicinity of, the project site or stored in acceptable storage places.
Partial payment for material does not constitute acceptance of such material for use in completing items of work. Partial payments will not be made for living or perishable material until incorporated into the project.
Partial payments for material will not exceed the lesser of:
(1) 80 percent of the contract bid price for the item; or
(2) 100 percent of amount supported by copies of invoices submitted.
The quantity paid will not exceed the corresponding quantity estimated in the contract.
151 - Mobilization
151.03 Payment
Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.
156 - Public Traffic
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Sign panels
156.03 General. Keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed 120 minutes at any one time followed by an open period of no less than 60 minutes.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post work signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
(j) Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.
156.05 Temporary Closures. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during work, give written notice to the Contracting Officer at least 10 days in advance.
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
Traffic control is considered an indirect cost of this contract and will not be compensated as a separate work item.
202 – Additional Clearing & Grubbing: Existing Drainage Structures
Description
202.01 Description.
This work consists of brushing and clearing around all existing bridges, culverts, and appurtenant structures.
Requirements
202.02 General.
Horizontal Clearing. All material will be cut a distance of 30 linear feet on each side from the center of the lane. A distance of 75 linear feet will be cut forward and backward on each side from the structure along the road. The last 25 feet will taper in to the road edge. All material will be cut to flush with the ground. Dispose of suitable material on-site and out of natural or man-made watercourses.
Vertical Clearing. All material will be cut overhead a distance of 14 feet from the road surface.
Sign Clearing. All material will be cut in a radius of 10 linear feet from the center of each sign.
Grubbing. Grub all material laterally from abutments a minimum of 10 feet and from the edge of abutments to the streamline (channel edge). Grub to a depth sufficient to remove stump, roots. Backfill with unclassified borrow.
202.03 Acceptance. Brushing and clearing existing drainage structures will be evaluated under Subsection 202.02.
Measurement
202.04 Measurement.
Measure the Section 202 items listed in the bid schedule.
Payment
202.05 Payment.
The accepted quantities will be paid at the contract price per unit of measurement for the Section 202 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section.
303 - Road Reconditioning
303.01 Work.
This work consists of reconditioning aggregate surfaces. See Section 703.01 for aggregate gradation.
303.02 Aggregate Surface Reconditioning.
Repair soft and unstable areas to the full depth of the aggregate surface. Aggregate Bridge approaches should be reconditioned a minimum of 15 ft back from the deck joint. Scarify to a depth of 6 inches, and remove surface irregularities. Reshape, finish, and compact the entire aggregate surface.
(a) Roadway aggregate. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for compaction. Spread and shape the mixture on the prepared surface in a uniform layer.
Do not place the mixture in a layer exceeding 6 inches in compacted thickness. When more than one layer is necessary, compact each layer according before placing the next layer.
(b) Bedding and backfill aggregate. Place and shape the mixture in layers that, when compacted, do not exceed 6 inches in depth.
308.03 Compacting and Finishing Crushed Aggregate.
(a) Roadway aggregate. Compact using the methods below,
(1) Method 1. Operate equipment over the full width of spread aggregate until visible deformation ceases. A minimum of three passes shall be made at moisture content suitable for compaction.
(2) Method 2. Compact in 6 inch lifts by using a Forest Service approved mechanical compactor until no visible deformation is observed over the entire area of aggregate.
Measurement
303.04 Measurement.
Measure the Section 303 items listed in the bid schedule.
Payment
303.05 Payment.
The accepted quantities will be paid at the contract price per unit of measurement for the Section 303 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section.
607 - Cleaning Existing Drainage Structures Description
607.01 This work consists of cleaning existing culverts and bridge structures.
Requirements
607.02 General. Dispose of material off National Forest Lands and dispose in a legally approved facility.
607.03 Cleaning In Place. Remove and dispose of all foreign material on the deck and within the barrel and appurtenances of the culvert or bridge by any method that does not damage the structure.
607.04 Acceptance. Cleaning, reconditioning, and repairing existing drainage structures will be evaluated under Subsection 106.02.
Measurement
607.05 Measure the Section 607 items listed in the bid schedule according to Subsection 109.02.
Payment
607.06 The accepted quantities will be paid at the contract price per unit of measurement for the Section 607 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section.
617 - Guardrail
Requirements
617.01 General.
Remove and replace exisiting gurad rail posts with new ones. Re-use exisitng guardrail. Provide new hardware as neccesary.
617.02 Posts.
Fabricate all timber components of guardrail as detailed in Subsection 557.04. Pressure treat all timber using creosote, pentachlorophenol (any solvent), ammoniacal copper zinc arsenate (ACZA), or chromated copper arsenate (CCA – Type A, B, or C) in conformance with AASHTO M 133. Provide grading certification and pressure treatment test results, and meet the Best Management Practices (BMP’s) requirements. Field treat drill holes, cuts or abrasions made in fabricated timber after treatment in accordance with by using suitable equipment and material.
Measurement
617.04 Measurement.
Measure the Section 617 items listed in the bid schedule.
Payment
617.05 Payment.
The accepted quantities will be paid at the contract price per unit of measurement for the Section 617 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section.
633 - Permanent Traffic Control
Description
633.01 This work consists of installing permanent traffic control signs, supports, delineators, and object markers, and removing and resetting permanent traffic control devices.
Sign panels are designated as aluminum or other materials approved by the CO.
Posts are designated as treated wood.
633.03 General.
Furnish traffic control devices and guide signs according to the MUTCD, approved USDA-FS and state supplements, the current edition of USDA-FS EM-7100-15 Sign and Poster Guidelines for the Forest Service, and Standard Highway Signs published by FHWA. Submit the sign list for approval before ordering.
633.04 Supports.
Install the approved signs on 4 x 4 pressure treated wooden posts.
633.05 Panels.
“For each sign panel use at least one antitheft fastener.”
Measurement
633.06 Measurement.
Measure the Section 633 items listed in the bid schedule.
Payment
633.07 Payment.
The accepted quantities will be paid at the contract price per unit of measurement for the Section 633 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section.
635 - Temporary Traffic Control
635.01 General.
Install temporary traffic control signs to temporary posts or approved temporary sign mounts. Refer to Section 156.
Measurement and Payment
Traffic control is considered an indirect cost of this contract and will not be compensated as a separate work item.
703 - Aggregate
703.01 General
Supply and install aggregate with Section 303. Provide ALDOT 825B or equivalent as approved the CO.
Measurement and Payment
Aggregate is considered an indirect cost of this contract and will not be compensated as a separate work item.
PAGE
File details come from the government source that posted it. Updated .