Section B - Schedule of Items.doc

DOC document 22 KB Posted

Attached to
RECOVERY* Bridge Construction-Laurel Creek - George Washington & Jefferson National Forest
Solicitation number
AG-4419-S-10-0095
Issued by

About this file

Section B - Schedule of items

View the file

Other files

File Type Posted
Section M —
SF30 - Amendment 1.pdf PDF
Attachment 2 - Specifications.doc DOC document
Attachment 1 - Specifications Plans Index.pdf PDF
Sections C thru M - Solicitation.doc DOC document
Attachmenet 3 - Wage Determination.doc DOC document
Exhibit 1 - ARRA SIGN DETAILS A-D.pdf PDF
Section A - SF 1442.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAUREL A. T. BRIDGE

SCHEDULE OF ITEMS

11-13-2008 (Tripp)

Pay Item

MM

Description

Quantity

201(03)

DQ

Clearing &Grubbing

1 L.S.

202(01)

DQ

Removal of Structures

1 L.S.

206(07)

DQ

Structural Excavation

1 L.S.

557(04)

DQ

Treated Timber Bridge 1 L.S.

602(01)

DQ

Concrete

2.0 C.Y.

610(01)

DQ

Cement Rubble Masonry

3.0 C.Y.

625(02)

DQ

Seeding

0.10 Acre

File details come from the government source that posted it. Updated .