Section B - Schedule of Items.doc
DOC document 22 KB Posted
- Attached to
- RECOVERY* Bridge Construction-Laurel Creek - George Washington & Jefferson National Forest
- Solicitation number
- AG-4419-S-10-0095
About this file
Section B - Schedule of items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section M | — | |
| SF30 - Amendment 1.pdf | ||
| Attachment 2 - Specifications.doc | DOC document | |
| Attachment 1 - Specifications Plans Index.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Attachmenet 3 - Wage Determination.doc | DOC document | |
| Exhibit 1 - ARRA SIGN DETAILS A-D.pdf | ||
| Section A - SF 1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAUREL A. T. BRIDGE
SCHEDULE OF ITEMS
11-13-2008 (Tripp)
Pay Item
MM
Description
Quantity
201(03)
DQ
Clearing &Grubbing
1 L.S.
202(01)
DQ
Removal of Structures
1 L.S.
206(07)
DQ
Structural Excavation
1 L.S.
557(04)
DQ
Treated Timber Bridge 1 L.S.
602(01)
DQ
Concrete
2.0 C.Y.
610(01)
DQ
Cement Rubble Masonry
3.0 C.Y.
625(02)
DQ
Seeding
0.10 Acre
File details come from the government source that posted it. Updated .