General Decision Number: WI080010 08/21/2009 WI10

Superseded General Decision Number: WI20070010

State: Wisconsin

Construction Type: Highway

Counties: Wisconsin Statewide.

HIGHWAY, AIRPORT RUNWAY & TAXIWAY CONSTRUCTION PROJECTS (does not include bridges over navigable waters; tunnels; buildings in highway rest areas; and railroad construction)

Modification Number Publication Date

0 02/08/2008

1 02/29/2008

2 05/02/2008

3 06/13/2008

4 06/27/2008

5 07/11/2008

6 07/25/2008

7 08/08/2008

8 08/15/2008

9 08/29/2008

10 09/12/2008

11 10/03/2008

12 11/07/2008

13 12/19/2008

14 02/20/2009

15 03/13/2009

16 03/20/2009

17 05/29/2009

18 06/05/2009

19 06/26/2009

20 07/10/2009

21 08/07/2009

22 08/21/2009

BRWI0001-002 06/01/2008

CRAWFORD, JACKSON, JUNEAU, LA CROSSE, MONROE, TREMPEALEAU, AND

VERNON COUNTIES

Rates Fringes

BRICKLAYER.......................$ 29.24 13.80

BRWI0002-002 06/01/2008

ASHLAND, BAYFIELD, DOUGLAS, AND IRON COUNTIES

BRICKLAYER.......................$ 35.24 13.35

BRWI0002-005 06/01/2008

8/26/2009http://www.wdol.gov/wdol/scafiles/davisbacon/WI10.dvb

ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET, CHIPPEWA,

CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC,

FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE, LANGLADE,

LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE,

OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, ST CROIX, SAUK,

SHAWANO, SHEBOYGAN, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA,

WINNEBAGO, AND WOOD COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 28.15 12.80

BRWI0003-002 06/01/2008

BROWN, DOOR, FLORENCE, KEWAUNEE, MARINETTE, AND OCONTO COUNTIES

BRWI0004-002 06/01/2008

KENOSHA, RACINE, AND WALWORTH COUNTIES

BRICKLAYER.......................$ 32.88 14.50

BRWI0006-002 06/01/2008

ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MARATHON, MENOMINEE,

ONEIDA, PORTAGE, PRICE, TAYLOR, VILAS AND WOOD COUNTIES

BRICKLAYER.......................$ 29.74 13.30

BRWI0007-002 06/01/2008

GREEN, LAFAYETTE, AND ROCK COUNTIES

BRICKLAYER.......................$ 30.41 14.30

BRWI0008-002 06/01/2008

MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

BRICKLAYER.......................$ 32.71 14.54

BRWI0011-002 06/01/2008

CALUMET, FOND DU LAC, MANITOWOC, AND SHEBOYGAN COUNTIES

BRWI0019-002 06/01/2008

BARRON, BUFFALO, BURNETT, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN,

PIERCE, POLK, RUSK, ST. CROIX, SAWYER AND WASHBURN COUNTIES

BRICKLAYER.......................$ 28.99 14.05

BRWI0034-002 06/04/2007

COLUMBIA AND SAUK COUNTIES

BRICKLAYER.......................$ 30.66 14.05

CARP0087-001 05/01/2007

BURNETT (W. of Hwy 48), PIERCE (W. of Hwy 29), POLK (W. of Hwys

35, 48 & 65), AND ST. CROIX (W. of Hwy 65) COUNTIES

Carpenter & Piledrivermen........$ 26.76 11.61

CARP0252-002 06/01/2009

ADAMS, BARRON, BAYFIELD (Eastern 2/3), BROWN, BUFFALO, BURNETT (E. of Hwy 48), CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DANE, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE (except area bordering Michigan State Line), FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE (except N.E. corner), MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE (E.

of Hwys 29 & 65), POLK (E. of Hwys 35, 48 & 65), PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST CROIX (E. of Hwy 65), TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH, WASHBURN, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD

COUNTIES

CARPENTER

CARPENTER...................$ 29.06 13.36

MILLWRIGHT..................$ 30.66 13.36

PILEDRIVER..................$ 29.56 13.36

CARP0252-010 05/27/2007

ASHLAND COUNTY

Carpenters

Carpenter...................$ 23.82 11.26

Millwright..................$ 27.71 11.26

Pile Driver.................$ 24.81 10.43

CARP0264-003 06/01/2008

KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WAUKESHA, AND WASHINGTON

CARPENTER........................$ 30.52 14.41

CARP2337-001 06/01/2008

ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON

ZONE B: KENOSHA & RACINE

PILEDRIVERMAN

Zone A......................$ 27.25 19.46

Zone B......................$ 24.47 19.46

ELEC0014-002 06/01/2009

ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK

(except Maryville, Colby, Unity, Sherman, Fremont, Lynn &

Sherwood), CRAWFORD, DUNN, EAU CLAIRE, GRANT, IRON, JACKSON, LA

CROSSE, MONROE, PEPIN, PIERCE, POLK, PRICE, RICHLAND, RUSK, ST

CROIX, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN

Electricians:....................$ 28.74 35.25%+8.82

ELEC0014-007 06/04/2007

REMAINING COUNTIES

Teledata System Installer

Installer/Technician........$ 20.69 17%+6.65

Low voltage construction, installation, maintenance and removal of teledata facilities (voice, data, and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V-SAT, bypass, CATV, WAN (wide area networks), LAN (local area networks), and ISDN (integrated systems digital network).

ELEC0158-002 06/02/2008

BROWN, DOOR, KEWAUNEE, MANITOWOC (except Schleswig), MARINETTE(Wausuakee and area South thereof), OCONTO, MENOMINEE

(East of a ine 6 miles West of the West boundary of Oconto

County), SHAWANO (Except Area North of Townships of Aniwa and

Hutchins) COUNTIES

Electricians:....................$ 27.27 26.75%+7.62

ELEC0159-003 06/01/2009

COLUMBIA, DANE, DODGE (Area West of Hwy 26, except Chester and

Emmet Townships), GREEN, LAKE (except Townships of Berlin, Seneca, and St. Marie), IOWA, MARQUETTE (except Townships of

Neshkoka, Crystal Lake, Newton, and Springfield), and SAUK

Electricians:....................$ 31.61 28%+8.95

ELEC0219-004 06/01/2009

FLORENCE COUNTY (Townships of Aurora, Commonwealth, Fern, Florence and Homestead) AND MARINETTE COUNTY (Township of

Niagara)

Electricians:

Electrical contracts over

$90,000.....................$ 28.39 3.75%+14.95

Electrical contracts under

$90,000.....................$ 26.19 3.75%+14.95

ELEC0242-005 05/31/2009

DOUGLAS COUNTY

Electricians:....................$ 31.24 63.5%

ELEC0388-002 03/01/2007

ADAMS, CLARK (Colby, Freemont, Lynn, Mayville, Sherman, Sherwood, Unity), FOREST, JUNEAU, LANGLADE, LINCOLN, MARATHON, MARINETTE (Area North of the town of Wausaukee), MENOMINEE

(Area West of a line 6 miles West of the West boundary of

Oconto County), ONEIDA, PORTAGE, SHAWANO (Area North of the townships of Aniwa and Hutchins), VILAS AND WOOD COUNTIES

Electricians:....................$ 27.68 15.23

ELEC0430-002 06/01/2009

RACINE COUNTY (Except Burlington Township)

Electricians:....................$ 32.53 3%+17.59

ELEC0494-005 06/01/2009

MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

Electricians:....................$ 31.10 14.85%+$15.70

ELEC0494-006 06/01/2008

CALUMET (Township of New Holstein), DODGE (East of Hwy 26 including Chester Township), FOND DU LAC, MANITOWOC

(Schleswig), and SHEBOYGAN COUNTIES

Electricians:....................$ 28.33 3%+$17.21

ELEC0494-013 06/01/2005

DODGE (East of Hwy 26 including Chester Twp, excluding Emmet

Twp), FOND DU LAC (Except Waupuin), MILWAUKEE, OZAUKEE, MANITOWOC (Schleswig), WASHINGTON, AND WAUKESHA COUNTIES

Sound & Communications

Installer...................$ 14.98 10.97

Technician..................$ 21.98 11.99

Installation, testing, maintenance, operation and servicing of all sound, intercom, telephone interconnect, closed circuit TV systems, radio systems, background music systems, language laboratories, electronic carillion, antenna distribution systems, clock and program systems and low-voltage systems such as visual nurse call, audio/visual nurse call systems, doctors entrance register systems.

Includes all wire and cable carrying audio, visual, data, light and radio frequency signals. Includes the installation of conduit, wiremold, or raceways in existing structures that have been occupied for six months or more where required for the protection of the wire or cable, but does not mean a complete conduit or raceway system. work covered does not include the installation of conduit, wiremold or any raceways in any new construction, or the installation of power supply outlets by means of which external electric power is supplied to any of the foregoing equipment or products

* ELEC0577-003 06/01/2009

CALUMET (except Township of New Holstein), GREEN LAKE (N. part including Townships of Berlin, St Marie, and Seneca), MARQUETTE

(N. part including Townships of Crystal Lake, Neshkoro, Newton, and Springfield), OUTAGAMIE, WAUPACA, WAUSHARA, AND WINNEBAGO

Electricians:....................$ 27.40 26.5%+8.90

ELEC0890-003 06/01/2009

DODGE (Emmet Township only), GREEN, JEFFERSON, LAFAYETTE, RACINE (Burlington Township), ROCK AND WALWORTH COUNTIES

Electricians:....................$ 29.10 27.95%+8.92

ELEC0953-001 06/01/2008

Line Construction:

(1) Lineman.................$ 34.57 4.75+29%

(2) Heavy Equipment

Operator....................$ 31.11 4.75+29%

(3) Equipment Operator......$ 27.66 4.75+29%

(4) Heavy Groundman Driver..$ 24.20 4.75+29%

(5) Light Groundman Driver..$ 22.47 4.75+29%

(6) Groundsman..............$ 19.01 4.75+29%

ENGI0139-005 06/01/2009

Power Equipment Operator

Group 1.....................$ 31.97 17.23

Group 2.....................$ 31.47 17.23

Group 3.....................$ 30.97 17.23

Group 4.....................$ 30.71 17.23

Group 5.....................$ 30.42 17.23

Group 6.....................$ 24.52 17.23

PREMIUM PAY:

EPA Level "A" protection - $3.00 per hour

EPA Level "B" protection - $2.00 per hour

EPA Level "C" protection - $1.00 per hour

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, tower cranes, and derricks with or without attachments with a lifting capacity of over 100 tons; or cranes, tower cranes, and derricks with boom, leads and/or jib lengths measuring 176 feet or longer.

GROUP 2: Cranes, tower cranes and derricks with or without attachments with a lifting capacity of 100 tons or less; or cranes, tower cranes, and derricks with boom, leads, and/or jibs lengths measuring 175 feet or under and Backhoes

(excavators) weighing 130,000 lbs and over; caisson rigs;

pile driver; dredge operator; dredge engineer; Boat Pilot.

GROUP 3: Mechanic or welder - Heavy duty equipment; cranes with a lifting capacity of 25 tons or under; concrete breaker (manual or remote); vibratory/sonic concrete breaker; concrete laser screed; concrete slipform paver;

concrete batch plant operator; concrete pvt. spreader -heavy duty (rubber tired); concrete spreader & distributor;

automatic subgrader (concrete); concrete grinder & planing machine; concrete slipform curb & gutter machine; slipform concrete placer; tube finisher; hydro blaster (10,000 psi & over); bridge paver; concrete conveyor system; concrete pump; Rotec type Conveyor; stabilizing mixer

(self-propelled); shoulder widener; asphalt plant engineer;

bituminious paver; bump cutter & grooving machine; milling machine; screed (bituminous paver); asphalt heater, planer

& scarifier; Backhoes (excavators) weighing under 130,000 lbs; grader or motor patrol; tractor (scraper, dozer, pusher, loader); scraper - rubber tired (single or twin engine); endloader; hydraulic backhoe (tractor type);

trenching machine; skid rigs; tractor, side boom (heavy);

drilling or boring machine (mechanical heavy); roller over

5 tons; percussion or rotary drilling machine; air track;

blaster; loading machine (conveyor); tugger; boatmen;

winches & A-frames; post driver; material hoist.

GROUP 4: Greaser, roller steel (5 tons or less); roller

(pneumatic tired) - self propelled; tractor (mounted or towed compactors & light equipment); shouldering machine;

self- propelled chip spreader; concrete spreader; finishing machine; mechanical float; curing machine; power subgrader;

joint sawer (multiple blade) belting machine; burlap machine; texturing machine; tractor endloader (rubber tired) - light; jeep digger; forklift; mulcher; launch operator; fireman, environmental burner

GROUP 5: Air compressor; power pack; vibrator hammer and extractor; heavy equipment, leadman; tank car heaters;

stump chipper; curb machine operator; Concrete proportioning plants; generators; mudjack operator; rock breaker; crusher or screening plant; screed (milling machine); automatic belt conveyor and surge bin; pug mill operator; Oiler, pump (over 3 inches); Drilling Machine

Tender.

GROUP 6: Off-road material hauler with or without ejector.

IRON0008-002 06/01/2008

BROWN, CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC,

MARINETTE, OCONTO, OUTAGAMI, SHAWANO, SHEBOYGAN, AND WINNEBAGO

COUNTIES:

IRONWORKER.......................$ 27.73 19.04

IRON0008-003 06/01/2009

KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WALWORTH (N.E. 2/3),

WASHINGTON, AND WAUKESHA COUNTIES

IRONWORKER.......................$ 30.51 20.59

IRON0383-001 06/01/2009

ADAMS, COLUMBIA, CRAWFORD, DANE, DODGE, FLORENCE, FOREST,

GRANT, GREENE, (Excluding S.E. tip), GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LA CROSSE, LAFAYETTE, LANGLADE, MARATHON, MARQUETTE, MENOMINEE, MONROE, PORTAGE, RICHLAND, ROCK (Northern area, vicinity of Edgerton and Milton), SAUK, VERNON, WAUPACA, WAUSHARA, AND WOOD COUNTIES

IRONWORKER.......................$ 30.90 17.13

IRON0498-005 06/01/2008

GREEN (S.E. 1/3), ROCK (South of Edgerton and Milton), and

WALWORTH (S.W. 1/3) COUNTIES:

IRONWORKER.......................$ 34.34 25.72

IRON0512-008 05/01/2009

BARRON, BUFFALO, CHIPPEWA, CLARK, DUNN, EAU CLAIRE, JACKSON,

PEPIN, PIERCE, POLK, RUSK, ST CROIX, TAYLOR, AND TREMPEALEAU

IRONWORKER.......................$ 33.80 20.44

IRON0512-021 05/01/2009

ASHLAND, BAYFIELD, BURNETT, DOUGLAS, IRON, LINCOLN, ONEIDA,

PRICE, SAWYER, VILAS AND WASHBURN COUNTIES

IRONWORKER.......................$ 29.76 19.50

LABO0113-002 06/01/2008

MILWAUKEE AND WAUKESHA COUNTIES

Laborers:

Group 1.....................$ 23.26 14.18

Group 2.....................$ 23.41 14.18

Group 3.....................$ 23.61 14.18

Group 4.....................$ 23.76 14.18

Group 5.....................$ 23.91 14.18

Group 6.....................$ 19.75 14.18

LABORERS CLASSIFICATIONS

GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;

Demolition and Wrecking Laborer; Guard Rail, Fence, and

Bridge Builder; Landscaper; Multiplate Culvert Assembler;

Stone Handler; Bituminous Worker (Shoveler, Loader, and

Utility Man); Batch Truck Dumper or Cement Handler;

Bituminous Worker (Dumper, Ironer, Smoother, and Tamper);

Concrete Handler

GROUP 2: Air Tool Operator; Joint Sawer and Filler

(Pavement); Vibrator or Tamper Operator (Mechanical Hand

Operated); Chain Saw Operator; Demolition Burning TOrch

Laborer

GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter

(Curb, Sidewalk, and Pavement); Strike Off Man

GROUP 4: Line and Grade Specialist

GROUP 5: Blaster and Powderman

GROUP 6: Flagperson; traffic control person

LABO0113-003 06/01/2008

OZAUKEE AND WASHINGTON COUNTIES

Group 1.....................$ 22.51 14.18

Group 2.....................$ 22.61 14.18

Group 3.....................$ 22.66 14.18

Group 4.....................$ 22.86 14.18

Group 5.....................$ 22.71 14.18

Group 6.....................$ 19.60 14.18

Bridge Builder; Landscaper; Multiplate Culvert Assembler;

Stone Handler; Bituminous Worker (Shoveler, Loader, and

Utility Man); Batch Truck Dumper or Cement Handler;

Bituminous Worker (Dumper, Ironer, Smoother, and Tamper);

Operated);

GROUP 5: Blaster; powderman

GROUP 6: Flagperson and Traffic Control Person

LABO0113-011 06/01/2008

KENOSHA AND RACINE COUNTIES

LABORERS

Group 1.....................$ 21.52 14.98

Group 2.....................$ 21.67 14.98

Group 3.....................$ 21.87 14.98

Group 4.....................$ 21.84 14.98

Group 5.....................$ 22.17 14.98

Group 6.....................$ 18.66 14.98

LABORERS CLASSIFICATIONS:

GROUP 1: General laborer; Tree Trimmer; Conduit Layer;

Bridge Builder; Landscaper; Multiplate Culvert Assembler;

Stone Handler; Bituminous Worker (Shoveler, Loader, and

Utility Man); Batch Truck Dumper or Cement Handler;

Bituminous worker (Dumper, Ironer, Smoother, and Tamper);

Operated); Chain Saw Operator; Demolition Burning Torch

GROUP 5: Blaster and Powderman

GROUP 6: Flagman; traffic control person

LABO0140-002 06/01/2008

ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT,

CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR,

DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST,

GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA,

JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN,

MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE,

OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE,

RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST.

CROIX, TAYLOR, TREMPEALEAU, VERNON, VILLAS, WALWORTH, WASHBURN,

WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES

Group 1.....................$ 23.87 11.75

Group 2.....................$ 23.97 11.75

Group 3.....................$ 24.02 11.75

Group 4.....................$ 24.22 11.75

Group 5.....................$ 24.07 11.75

Group 6.....................$ 20.50 11.75

Bridge Builder; Landscaper; Multiplate Culvert Assembler;

Stone Handler; Bitminous Worker (Shoveler, Loader, and

Utility Man); Batch Truck Dumper or Cement Handler;

Bituminous Worker (Dumper, Ironer, Smoother and Tamper);

Operated)

(Curb, Sidewalk and Pavement); Strike Off Man

GROUP 4: Line and Grade Secialist

GROUP 5: Blaster; powderman

GROUP 6: Flagperson; Traffic Control

LABO0464-003 06/01/2008

DANE COUNTY

Group 1.....................$ 24.15 11.75

Group 2.....................$ 24.25 11.75

Group 3.....................$ 24.30 11.75

Group 4.....................$ 24.50 11.75

Group 5.....................$ 24.35 11.75

Group 6.....................$ 20.50 11.75

LABORERS CLASSIFICATIONS:

Bridge Builder; Landscaper; Multiplate Culvert Assembler;

Stone Handler; Bituminous Worker (Shoveler, Loader, and

Utility Man); Batch Truck Dumper or Cement Handler;

Bituminious Worker (Dumper, Ironer, Smoother, and Tamper);

Operated); Chain Saw Operator; Demolition Burning Torch

GROUP 5: Blaster; Powderman

GROUP 6: Flagperson and Traffic Control Person

PAIN0106-008 05/01/2008

ASHLAND, BAYFIELD, BURNETT, AND DOUGLAS COUNTIES

Painters:

New:

Brush, Roller..............$ 27.41 12.52

Spray, Sandblast, Steel....$ 28.01 12.52

Repaint:

Brush, Roller..............$ 25.91 12.52

Spray, Sandblast, Steel....$ 26.51 12.52

PAIN0108-002 06/01/2009

RACINE COUNTY

Brush, Roller...............$ 28.00 15.24

Spray & Sandblast...........$ 29.00 15.24

PAIN0259-002 05/01/2008

BARRON, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN, PIERCE, POLK, RUSK,

SAWYER, ST. CROIX, AND WASHBURN COUNTIES

PAINTER..........................$ 24.11 12.15

PAIN0259-004 05/01/2008

BUFFALO, CRAWFORD, JACKSON, LA CROSSE, MONROE, TREMPEALEAU, AND

PAINTER..........................$ 20.43 8.40

PAIN0781-002 06/01/2009

JEFFERSON, MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

Bridge......................$ 27.47 14.39

Brush.......................$ 27.12 14.39

Spray & Sandblast...........$ 27.87 14.39

PAIN0802-002 06/01/2009

COLUMBIA, DANE, DODGE, GRANT, GREEN, IOWA, LAFAYETTE, RICHLAND,

ROCK, AND SAUK COUNTIES

PAINTER

Brush.......................$ 25.65 13.10

PREMIUM PAY:

Structural Steel, Spray, Bridges = $1.00 additional per hour.

PAIN0802-003 06/01/2009

ADAMS, BROWN, CALUMET, CLARK, DOOR, FOND DU LAC, FOREST, GREEN

LAKE, IRON, JUNEAU, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC,

MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA,

OUTAGAMIE, PORTAGE, PRICE, SHAWANO, SHEBOYGAN, TAYLOR, VILAS,

WAUSHARA, WAUPACA, WINNEBAGO, AND WOOD COUNTIES

PAINTER..........................$ 21.87 10.07

PAIN0934-001 06/01/2008

KENOSHA AND WALWORTH COUNTIES

Brush.......................$ 27.10 14.14

Spray.......................$ 28.10 14.14

Structural Steel............$ 27.15 14.14

* PAIN1011-002 06/01/2009

FLORENCE COUNTY

Painters:........................$ 23.40 8.57

PLAS0599-010 06/01/2007

CEMENT MASON/CONCRETE FINISHER

Area 1......................$ 28.27 12.73

Area 2 (BAC)................$ 28.15 12.80

Area 3......................$ 26.10 13.65

Area 4......................$ 26.82 12.93

Area 5......................$ 26.97 12.78

Area 6......................$ 24.08 15.67

AREA DESCRIPTIONS

AREA 1: BAYFIELD, DOUGLAS, PRICE, SAWYER, AND WASHBURN

AREA 2: ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET,

CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE,

FOND DU LAC, FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE,

LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE,

MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK,

PORTAGE, RUSK, ST CROIX, SAUK, SHAWANO, SHEBOYGAN, TAYLOR,

VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD

AREA 3: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA

CROSSE MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND

AREA 4: MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

AREA 5: DANE, GRANT, GREEN, IOWA, LAFAYETTE, AND ROCK

AREA 6: KENOSHA AND RACINE COUNTIES

TEAM0039-001 05/01/2009

TRUCK DRIVER

1 & 2 Axles.................$ 23.84 14.70

3 or more Axles; Euclids

Dumptor & Articulated, Truck Mechanic..............$ 23.99 14.70

WELL DRILLER.....................$ 16.52 3.70

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION