Schedule of Items.doc
DOC document 60 KB Posted
- Solicitation number
- AG-4419-S-10-0018
About this file
Schedule of items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Det.pdf | ||
| RFQ.doc | DOC document | |
| Clauses.doc | DOC document | |
| SOW.doc | DOC document | |
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIM-0913/0915-9EW-360-0913-01 Major Culvert Replacement Unnamed Tributary to Barker Lake at FR 1601Culvert Replacement project
ENGINEERING SCHEDULE OF ITEMS
Unnamed Tributary to Barker Lake at FR 1601 Culvert Replacement Great Divide Ranger District
Chequamegon-Nicolet National Forest
Sawyer County, Wisconsin
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101 - Mobilization
Lump Sum 1.00
15713 - Soil Erosion and Pollution Control
1.00
20301 - Removal of Existing 48” Culvert disposal method (a) remove from project.
| Each |
| 1.00 |
20407 - Select Borrow, Compaction Method “E”, Finishing Method “A”, Tolerance “D”
Gov’t Provided Source
(Compacted in place quantity)
Cubic Yard
390.00
20415 - Unsuitable Excavation
50.00
| 006 |
| 20701 - Earth Work Geotextile Type II-A |
| Square Yards |
| 190.00 |
| 007 |
| 20802 - Foundation Fill, Select Bedding, |
¾” to 1½” Clean Stone
| Cubic Yard |
| 25.00 |
20806 - Structure Excavation
191.00
25101 - Placed RipRap, Class 4
30.00
30111 - Aggregate Surface Course, Grade “G” or equivalent, Compaction method “B” (Compacted in place quantity)
275.00
60202 - 16’-4”x 5’11” Aluminum Box Culvert w/ Wing Walls, Full Invert, Head Walls and Toewall, HS-25 Loading
| Linear Feet |
| 36.00 |
| 012 |
| 62503 - Seeding & Fertilization, Dry Method |
| Lump Sum |
| 1.00 |
62901 - Erosion Control Mat Type, Type: ENS2 or Equal
Square Yard 150.00
63501 - Temporary Traffic Control
1.00
Total=____________
File details come from the government source that posted it. Updated .