ATV_Trailhead_Paving_Work Description.doc

DOC document 24 KB Posted

Attached to
RECOVERY: DEFERRED ROAD MAINTENANCE AND WATERSHED HEALTH II, ALLEGHENY NF, ATV TRAILHEAD PAVING
Solicitation number
AG-4419-S-09-0142
Issued by

About this file

Additional work specifications absent from original solicitation

View the file

Other files

File Type Posted
ATV_Trailhead_Paving_Vicinity_Map.pdf PDF
ATV_Trailhead_Paving_Spec List.doc DOC document
Schedule_of_Items.xls XLS spreadsheet
ATV_Trailhead_Paving_Construction_detail.pdf PDF
SF1442cvr.pdf PDF
ATV_Trailhead_Paving_SOW.pdf PDF
FS ARRA SIGN DETAILS 2apr09.pdf PDF
ATV_Trailhead_Paving_Sign Plan.doc DOC document
DBA_WD.pdf PDF
SF 1442 Cont_0142.pdf PDF
Experience_Capability Statement.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIM-0919-8R-378-0919-01

ANF Timberline ATV Trailhead Paving (FR 232 and parking area)

FR 232 Highland (Level C)

Station

Road Log/Work Description

0+00 Intersection with State Route 948 0+00 – 13+00 Apply 6” Limestone DSA (Driving Surface Aggregate), 16’ wide, including entrance apron 10+00 ATV parking lot exit road left 12+50 ATV parking lot entrance road left 13+00 End of DSA limestone placement ATV Parking Area and adjacent trail

Apply a 3” layer of bituminous asphalt ID-2 Binder and then a 1-1/2” layer of bituminous asphalt ID-2 Wearing to all of the following locations:

· ATV parking lot (90’ x 225’ = 20,250 square feet)

· Exit road/apron (1,585 sf)

· Entrance road/apron (3,875 sf)

· Trail (8’ x 215’ = 1,720 sf)

· SST apron (120 sf)

· Bulletin board apron (50 sf)

· ATV loading ramp (8’ x 25’ = 200 sf)

Group camping road and parking lot

Apply 6” Limestone DSA (Driving Surface Aggregate) to the entire group camping road and parking lot (Approx. 9,470 square feet)

File details come from the government source that posted it. Updated .