ATV_Trailhead_Paving_Sign Plan.doc

DOC document 28 KB Posted

Attached to
RECOVERY: DEFERRED ROAD MAINTENANCE AND WATERSHED HEALTH II, ALLEGHENY NF, ATV TRAILHEAD PAVING
Solicitation number
AG-4419-S-09-0142
Issued by

About this file

Sign Plan

View the file

Other files

File Type Posted
ATV_Trailhead_Paving_Work Description.doc DOC document
ATV_Trailhead_Paving_Vicinity_Map.pdf PDF
ATV_Trailhead_Paving_Spec List.doc DOC document
Schedule_of_Items.xls XLS spreadsheet
ATV_Trailhead_Paving_Construction_detail.pdf PDF
SF1442cvr.pdf PDF
ATV_Trailhead_Paving_SOW.pdf PDF
FS ARRA SIGN DETAILS 2apr09.pdf PDF
DBA_WD.pdf PDF
SF 1442 Cont_0142.pdf PDF
Experience_Capability Statement.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIM-0919-8R-378-0919-01

ANF Timberline ATV Trailhead Paving

(FR 232 and parking area) SPS – Sign Plan

· All signs must meet MUTCD standards

· The location for these signs will be field located by the Engineer.

Road # Sign #

Description

SR 948

HEAVY TRUCK TRAFFIC (24” x 24” minimum)

(2 required, one in each direction)

FR 232

WORK AREA AHEAD (24” x 24” minimum)

(1 required, at beginning of FR 232)

FR 232

3&4

AMERICAN RECOVERY AND REINVESTMENT

ACT (42” x 27”) and PUTTING AMERICA TO WORK (42” x 9”) on two 10’ metal posts

(1 of each required, at beginning of FR 232)

File details come from the government source that posted it. Updated .