About this file

Scope of Work

View the file

Other files

File Type Posted
FR6320 Resurfacing Pre-bid.pdf PDF
SF 30.pdf PDF
FR6320 Specification List.doc DOC document
FR6320 Schedule of Items.xls XLS spreadsheet
PLANS -Schedule of Items.pdf PDF
DBA.pdf PDF
SF 1442 Cover Pg.pdf PDF
Experience Capability Statement.doc DOC document
SF 1442 Cont_0087.doc DOC document
FR6320 SOW.doc DOC document
FR6320 Schedule of Items.xls XLS spreadsheet
Experience Capability Statement.doc DOC document
FR6320 Specification List.doc DOC document
PLANS -Schedule of Items.pdf PDF
DBA.pdf PDF
SF 1442 Cover Pg.pdf PDF
SF 1442 Cont_0087.doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIM-0907/0910-15EW-297-0907-02

SUPPLEMENTAL SPECIFICATION

PREFACE

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

SUPPLEMENTAL SPECIFICATION

Section 101 – TERMS, FORMAT, AND DEFINITIONS

101.01 Meaning of Terms.

Add the following:

Delete all references in FP-03 to Transportation Acquisition Regulations (TAR). For Timber Sales, delete all references in FP-03 to Federal Acquisition Regulations (FAR).

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI Symbols:

mp
Milepost
ppm
Part Per Million

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity-- “Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

Section 102 – BID, AWARD, AND EXECUTION OF CONTRACT

102 Delete

Delete Section 102 in its entirety.

Section 103 – SCOPE OF WORK

103 Delete

Delete all but subsection 103.01 Intent of Contract.

SUPPLEMENTAL SPECIFICATION

Section 104. Control of Work

104 Control of Work:

Delete sections 104.01, 104.02, 104.03, and 104.04.

104.05 Load Restrictions.

Add the following:

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

104.06 Other Contracts.

Add Subsection.

The Forest Service does not anticipate any other contract activities within the project area. There may, however, be other contractors operating in the Government pits during the contract duration. Coordinate with other contractors, if necessary, to reduce trucking or loading conflicts or traffic congestion as much as possible.

SUPPLEMENTAL SPECIFICATION

Section 105- CONTROL OF MATERIAL

105.02 Material Sources.

105.02(a) Government Provided Sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

Government-provided optional sources for this project are identified as follows:

Material is available for use as crushed aggregate as needed for the project from Pit Lake Pit, T45N-R40W, Sec 25. There is a stockpile of processed crushed aggregate at this location which meets material specifications for the project. The cost of loading, hauling, and placing the required aggregate and related pit development and cleanup shall be considered incidental to the contract item 30109A.

There is no charge for material taken from these pits for use on this project.

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

SUPPLEMENTAL SPECIFICATION

Section 106- ACCEPTANCE OF WORK

106.05 Statistical Evaluation of Work and Determination of Pay Factor (Value of Work).

Delete subsection 106.05

106.07 Partial and Final Acceptance.

Delete subsection 106.07

SUPPLEMENTAL SPECIFICATION

Section 107- LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

SUPPLEMENTAL SPECIFICATION

Section 108- PROSECUTION AND PROGRESS Delete Section 108 in its entirety.

SUPPLEMENTAL SPECIFICATION

Section 109- MEASUREMENT AND PAYMENT

109.02 Measurement Terms and Definitions

Add:

One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item:

(a) Designated Quantities (DQ). These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:

(1) As a result of changes in the work authorized by the Contracting Officer.

(2) As a result of the Contracting Officer determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

(3) As a result of the contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designated quantity is believed to be in error.

(b) Staked Quantities (SQ). These quantities are determined from staked measurements prior to construction.

(c) Actual Quantities (AQ). These quantities are determined from measurements of completed work.

(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.

(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.

Quantity Measurements. The Forest Service shall make all measurements for computation of quantities for all work items except those specified for payment by Design Quantity (DQ). The Engineer shall compute the quantities for periodic payments and for final payment.

The Contractor shall certify in writing at the completion of contract work, that the quality of construction conforms to the drawings, specifications, and requirements of the Contract.

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

SUPPLEMENTAL SPECIFICATION

Section 155- SCHEDULES FOR CONSTRUCTION CONTRACTS Delete Section 155 in its entirety.

SUPPLEMENTAL SPECIFICATION

Section 156- PUBLIC TRAFFIC

156.03 Accommodating traffic During Work.

Delete the following from the last paragraph:

according to Subsection 106.07(b)

Add the following:

Unless otherwise SHOWN ON THE DRAWINGS or described in the SUPPLEMENTAL SPECIFICATIONS, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a plan for the satisfactory handling of traffic has been approved. Specific requirements for temporary closures, detours, part-width construction, and access to adjacent or intersecting facilities will be SHOWN ON THE DRAWINGS or described in the SUPPLEMENTAL SPECIFICATIONS. Post construction signs and traffic control devices in conformance with the “Manual on Uniform Traffic Control Devices” (MUTCD). Do not proceed with work on the project until all required signs are in place and approved.

Before shutting down any operations, take all necessary precautions to prevent damage to the project, such as temporary detours, approaches, crossings, or intersections; and provide for normal drainage and minimization of erosion. Leave all travelways in a condition suitable for traffic.

The government may permit use of portions of the project during periods when operations have shut down. All maintenance attributed to permitted use during periods of work suspension will be provided by the Government, except for maintenance needed through the fault or negligence of the contractor. The Contractor shall be responsible for any maintenance not attributed to use, or that is necessary during suspensions through the fault or negligence of the Contractor.

When SHOWN ON THE DRAWINGS or described in the SUPPLEMENTAL SPECIFICATIONS, road segments may be closed to all traffic during the period(s) when construction is in progress. If any of the listed roads are to be closed during construction operations, give at least 14 days advance notice.

Unless otherwise provided, when construction activity is in progress and closure has not been provided for herin, delays may not exceed 20 minutes, in order to reasonably accommodate traffic.

156.04 Maintaining Roadways During Work.

(a) Add the following:

Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.

156.06 Limitations on Construction Operations.

Add the following:

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations SHOWN ON THE DRAWINGS, designated in the Road Order, or described in the SUPPLEMENTAL SPECIFICATIONS, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

156.08 Traffic and Safety Supervisor.

Delete this section in its entirety.

SUPPLEMENTAL SPECIFICATION

Section 204-EXCAVATION AND EMBANKMENT

204.05 Conserved Topsoil.

Delete the subsection.

204.09 Preparing Foundation for Embankment Construction.

Delete subsection (a) and replace it with the following:

(a) Embankment less than 4 feet high over natural ground. When designated, remove topsoil and break up the ground surface to a minimum depth of 6 inches by plowing or scarifying. Compact the ground surface according to Subsection 204.11.

204.10 Embankment Construction.

Add the following:

When an embankment is to be placed across swampy ground and removal of unsuitable material or subgrade treatment is not required, the lower part of the embankment shall be constructed in a single layer to the minimum depth necessary to support construction equipment.

(c) Individual rock fragments and boulders.

Add the following:

(5) Such rocks and boulders shall be at least 6 inches below subgrade.

204.11 Compaction.

Add the following:

All embankments shall be placed and compacted by one or more of the following methods as SHOWN ON THE DRAWINGS and listed in the SCHEDULE OF ITEMS.

Add the following compaction method:

(d) Layer Placement Method (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger roocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.

(e) Layer Placement Method (Roller Compaction). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, in when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.

204.13 Sloping, Shaping, and Finishing.

(a) Sloping.

Add the following:

Slope rounding is not required on tolerance class D though M roads.

(c) Shaping.

Add the following:

When excavation is measured on a station basis, excavating, placing of embankment, and shaping and compacting the roadway template shall include only those areas where cuts and fills are generally less than five feet in depth as measured from the finished shoulder grade to the top of the adjacent cut or toe of fill. These areas of station grading shall consist of light dozing or grading of such character that the excavation from backslopes, ditches, and roadbed shall be used in shaping the subgrade, shoulders, and adjacent fills.

When excavation is measured by the station (station grading) as designated in the SCHEDULE OF ITEMS, turnouts, side entrances, approaches, radii and T-turnarounds shall not be measured separately, but will be included as part of the station measurement along the construction centerline.

This work shall include all necessary scarifying, dozing, disking, moving, shaping, and compacting to develop the cross-sections SHOWN ON THE DRAWINGS. Loading and hauling will not be included or required in the work.

Compaction of the subgrade shall be accomplished with the construction and hauling equipment.

Delete section (d) and add the following:

(d) Finishing. For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed. For all roads, finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material. Finish roadbeds to the tolerance class shown in table 204-2.

Ensure that the subgrade for both surfaced and unsurfaced roads is visibly moist during shaping and dressing. Bring low sections, holes, cracks, or depressions to grade with suitable material. Maintain proper ditch drainage.

For unsurfaced roads, use one of the following methods to finish the roadbed

(1) Method A. Remove all material larger than 6 inches from the top 6 inches of the roadbed and replace with suitable material.

(2) Method B. Use a vibratory grid roller or approved equal with a minimum weight of 10 tons. Roll at least 5 full-width passes or until visible displacement ceases.

(3) Method C. For roads designated as Construction Tolerance Class K, L, or M, finish the roadbed by spreading the excavation. Eliminate rock berms.

Add Table 204-2—Construction Tolerances:

Table 204-2 Construction tolerances.

Tolerance Class(a)

A
B
C
D
E
F
G
H
I
J
K
L
M
Roadbed width (ft)
+0.5
+0.5
+1.0
+1.0
+1.0
+1.0
+1.5
+1.0
+2.0
+2.0
+2.0
+2.0
+2.0

Subgrade elevation

(ft)

+0.1
+0.2
+0.2
+0.5
+0.5
+1.0
+1.0
+1.5
+2.0
+3.0
+2.0
+3.0
(c)
Centerline alignment (ft)
+0.2
+0.2
+0.5
+0.5
+1.0
+1.0
`+1.5
+1.5
+2.0
+3.0
+3.0
+5.0
(c)
Slopes, excavation, and embankment (% slope(b)
+3
+5
+5
+5
+5
+5
+10
+10
+10
+10
+20
+20
+20

a. Maximum allowable deviation from construction stakes and drawings.

b. Maximum allowable deviation from staked slope measured from slope stakes or hinge points.

c. Unless otherwise shown the centerline alignment and subgrade elevation, as built, have no horizontal curves with a radius of less than 80 feet, and no vertical curves with a curve length of less than 80 feet when the algebraic difference in the grade change is less than 10 percent, or a curve length of less than 100 feet when the algebraic difference of the grade change is greater than or equal to 10 percent. The centerline grade is not to exceed 20 percent in 100 feet of length.

204.16

(b) Unclassified borrow, select borrow, and select topping.

Add the following:

When borrow is designated as a pay item by the cubic yard in the SCHEDULE OF ITEMS, measurement will be in the final position.

SUPPLEMENTAL SPECIFICATION

Section 301- UNTREATED AGGREGATE COURSES 301 Title Change.

Change the title to:

Section 301- AGGREGATE COURSES

301.01 Work.

Add the following:

Work includes producing aggregate by pit-run, grid rolling, screening, or crushing methods, or placing Government furnished aggregate. Work may include additive mineral filler, or binder.

301.03 General.

Add the following:

Request approval in writing of the roadbed before placing aggregate.

For pit run or grid-rolled material, furnish material smaller than the maximum size. No gradation other than maximum size will be required for pit-run or grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size. After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.

Provide additives or binder, if required, at the proportions specified.

Develop and use Government furnished sources according to Section 105.

If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320. Establish stockpile sites at locations approved. Clear and grub stockpile sites according to Section 201.

301.04 Mixing and Spreading.

Delete the first sentence of the first paragraph and add the following:

Ensure that aggregate and any required additives, water, mineral filler, and binder are mixed by the specified method except, if crushed aggregate products are being produced and mineral filler, binder, or additives are required, uniformly blend during crushing. Control additive proportions to 0.5 percent dry weight.

The aggregate shall be spread in a uniform layer, with no segregation of size, and to a loose depth that shall have the required thickness when compacted.

Stationary Plant Method. Mix the aggregate with other required materials in an approved mixer. Add water during the mixing operation in the amount necessary to provide the moisture content for compacting to the specified density. After mixing, transport the aggregate to the jobsite while it contains the proper moisture content, and place it on the roadbed or base course using an aggregate spreader.

Travel Plant Method. After placing the aggregate for each layer with an aggregate spreader or windrow-sizing device, uniformly mix it with other required materials using a traveling mixing plant. During mixing, add water to provide the necessary moisture content for compacting.

Road Mix Method. After placing the aggregate for each layer, mix it with other required materials at the required moisture content until the mixture is uniform throughout. Mix aggregate, water, and all other materials until a uniform distribution is obtained.

Spread the aggregate in a uniform layer, with no segregation of size, and to a loose depth that will provide the required compacted thickness.

When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.

Route and distribute hauling and leveling equipment over the width and length of each layer.

301.05 Compacting.

Delete the first and third paragraphs and add the following:

Compact the aggregate using one of the following methods as specified:

(a) Compaction A. Compact the aggregate by operating spreading and hauling equipment over the full width of each layer of the aggregate.

(b) Compaction B. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a).

(c) Compaction C. Compact each layer of aggregate to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 99, method C or D.

(d) Compaction D. Compact each layer of aggregate to a density of at least 95 percent of the maximum density, as determined by AASHTO T 180, method C or D.

(e) Compaction E. Operate rollers and compact as specified in Subsection 204.11(a).

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

301.06 Surface Tolerance.

Add the following:

Thickness and Width requirements:

The thickness of the compacted nominal aggregate shall not vary more than ½ inch for aggregates with a maximum particle size of 1 inch or less, nor more than 1 inch for aggregates with a nominal maximum particle size greater than 1 inch from the thickness SHOWN ON THE DRAWINGS. The compacted thickness shall not be consistently above or below the specified thickness.

301.09 Measurement.

Delete:

Measure aggregate by the cubic yard in the hauling vehicle and substitute with the following:

Measure aggregate by cubic yard compacted in place when payment is by contract quantities.

Payment When materials are produced and furnished by the Forest Service, the note “Government furnished materials” will be added to the description of the pay item.

SUPPLEMENTAL SPECIFICATION

Section 625- TURF ESTABLISHMENT

Description

625.01 Delete: watering

625.03 General.

Delete the first subsection and add the following:

Apply turf establishment to finished slopes and ditches between June 1 and October 1unless approved by the CO. Do not seed during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or is otherwise untillable.

625.05 Watering. Delete 625.05 Watering and its description in its entirety.

625.06 Fertilizing. (a) Dry method.

Add the following:

The fertilizer shall be 10-10-10, and shall be applied at the rate of 200 pounds per Acre.

625.07 Seeding. (a) Dry method.

Delete the subsection and add the following:

Seed Mixture

Species

Pounds per Acre Percent

Perennial Rye

7.5

Ladino Clover

10.5

Creeping Red Fescue

12.0

The seed mixture shall be applied at the rate of 30 Pounds per Acre.

625.08 Mulch. (a) Dry Method

Delete the subsection and add the following:

Mulch shall be applied at the rate of 50 Bales per Acre. Bales shall be a standard size with an average length of 36-inches and an average weight of 40-50 pounds as determined by the engineer.

SUPPLEMENTAL SPECIFICATION

Section 703. – AGGREGATE

703.05 Add: Subbase, Base, and Surface Course Aggregate Table 703-2A

Percent Passing

Sieve (AASHTO T11 and T27)

Grading MI 23A 1 inch 100

3/8 inch 60 – 85

No. 8 25 – 60

No. 200 9 – 16 This gradation is the Michigan Department of Transportation 2003 Standard Specifications for Construction – Designation 23A