FR6320 Schedule of Items.xls
XLS spreadsheet 28 KB Posted
- Attached to
- RECOVERY: FR6320 RESURFACING JOBS TO IMPROVEUPPER MICHIGAN FOREST FISH PASSAGE OTTAWA NATIONAL FOREST
- Solicitation number
- AG-4419-S-09-0087
About this file
Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FR6320 Resurfacing Pre-bid.pdf | ||
| SF 30.pdf | ||
| FR6320 Specification List.doc | DOC document | |
| FR6320 Schedule of Items.xls | XLS spreadsheet | |
| PLANS -Schedule of Items.pdf | ||
| DBA.pdf | ||
| SF 1442 Cover Pg.pdf | ||
| Experience Capability Statement.doc | DOC document | |
| SF 1442 Cont_0087.doc | DOC document | |
| FR6320 SOW.doc | DOC document | |
| FR6320 SOW.doc | DOC document | |
| Experience Capability Statement.doc | DOC document | |
| FR6320 Specification List.doc | DOC document | |
| PLANS -Schedule of Items.pdf | ||
| DBA.pdf | ||
| SF 1442 Cover Pg.pdf | ||
| SF 1442 Cont_0087.doc | DOC document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE
| FR6320 RESURFACING | ||||||
| CIM-0907-/0910-15EW-297-0907-02 | ||||||
| Item Number | Description | Method of measure | Unit | Quantity | Unit Price | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 20419 | Drainage Excavation, Recondition Ditches | AQ | LFT | 22475 | ||
| 21201 | Station Grading | DQ | MILE | 4.5 | ||
| 30109A | Aggregate Surface Course (Pit Lk Pit) Compaction A | DQ | CYD | 5000 | ||
| 30109B | Aggregate Surface Course (Commercial) Compaction A | DQ | CYD | 710 | ||
| 62527 | Seeding, Fertilizing, & Mulching, Dry | AQ | Acre | 7.3 | ||
| PROJECT TOTAL COST | ||||||
| BID ALTERNATE - FR6324 | ||||||
| Item Number | Description | Unit | ||||
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 20419 | Drainage Excavation, Recondition Ditches | AQ | LFT | 2600 | ||
| 21201 | Station Grading | DQ | MILE | 0.85 | ||
| 30109B | Aggregate Surface Course (Commercial) Compaction A | DQ | CYD | 1110 | ||
| 62527 | Seeding, Fertilizing, & Mulching, Dry | AQ | Acre | 1.0 | ||
| BID ALTERNATE TOTAL COST | ||||||
| PROJECT TOTAL + BID ALTERNATE |
&CFR6320 RESURFACING
CIM-0907/0910-15EW-297-0907-02
SCHEDULE OF ITEMS
File details come from the government source that posted it. Updated .